Electricity Regulation 2006
sec.119Network operation not to interfere with Queensland system
Start here
Get a plain-English read of sec.119
Turn the raw legal text into a practical explanation grounded in Electricity Regulation 2006.
sec.119 Network operation not to interfere with Queensland system
A distribution entity must not operate its supply network in a way that interferes with the performance of the Queensland system without the agreement of AEMO or the System Operator for Queensland. Maximum penalty—20 penalty units. In this section— operate includes providing network control. s 119 amd 2014 SL No. 338 s 23 (sec.119-ssec.1) A distribution entity must not operate its supply network in a way that interferes with the performance of the Queensland system without the agreement of AEMO or the System Operator for Queensland. Maximum penalty—20 penalty units. (sec.119-ssec.2) In this section— operate includes providing network control.