These regulations set out who may lawfully do electrical work in Western Australia and the licences, permits, supervision, notices, records, inspections, fees and penalties that apply. They govern individual electricians, apprentices, electrical contractors, in‑house installers and network operators, and establish a Board and Director powers to approve standards, exemptions and courses.
The rules require notifications, testing and electrical safety certificates, impose insurance and recordkeeping obligations, empower disciplinary action and fines, and now include mandatory CPR course requirements for licensed electricians.
These regulations set out the licensing, registration, supervision, notification, recordkeeping and safety requirements for persons who carry out electrical work or carry on business as electrical contractors in Western Australia. The instrument operates by creating a licensing regime (Parts 3 and 4) enforced through an Electrical Licensing Board (Part 2) and through the Director who exercises powers of direction, approval, exemption and enforcement. Core mechanics are: definitions of the regulated activity (electrical work, r. 4A; private generating plant, r. 4AA); a three‑tier worker licence structure (electrician, electrician’s training licence, restricted licence, r. 20); separate contractor and in‑house licences (Part 4, r. 33-44); supervision and competency requirements for work (r. 49D, r. 50); mandatory notification and certification for specified notifiable work (r. 51-52, r. 52B); standards and technical requirements to which work must conform (r. 49 and Schedule 2); and criminal and disciplinary sanctions for breach (discipline via SAT at r. 31 and r. 47; monetary penalties at r. 65).
Recent regulatory inserts establish an approved CPR course regime for licensed electricians (Div. 2 of Part 3, regs 32A-32I). The Director may approve courses (r. 32B), set completion periods (r. 32C), grant limited exemptions in emergency or exceptional circumstances (r. 32D) and require production of course completion records (r. 32I). Non‑compliance attracts a specific penalty ($10,000 per specified offence, regs 32E-32G, 32I), alongside the general penalty framework (r. 65).
Operational decision‑makers under the instrument are the Board (established r. 4; functions at r. 13), the Director (who may direct the Board, r. 13(3), approve courses, grant exemptions and give written directions), network operators (as recipients of notices and co‑regulators for notifiable work, see r. 51-52 and definitions at r. 3), and inspectors empowered to require records and inspect works. The rules create compliance flows: who must hold what licence (r. 19, r. 20, r. 36-37), what supervision is required for trainees and apprentices (r. 50; r. 49D), what notices and certificates must be delivered and when (r. 51-52, r. 52A, r. 52B), and what records must be retained (r. 52D, r. 52BC, r. 56-57). The instrument also specifies fees, including application and registration fees and a further inspection fee payable to network operators (Schedule 1; r. 64; r. 53A).
Current sections
Direct links to the current provisions in Electricity (Licensing) Regulations 1991.
11
Part 1
Preliminary
Part 1 — Preliminary
Citation 1
Commencement 1
Terms used 1
4A. Term used: electrical work 5
4AA. Term used: private generating plant 6
Part 2
The Electrical Licensing Board
Part 2 — The Electrical Licensing Board
Div 1
The Board
Division 1 — The Board
Board established 8
Membership 8
Appointments under r. 5(1)(b) to (fa), procedure for making 10
Term of office 12
Resignations and removals from office 12
Acting members 14
Meetings 15
Procedures of Board 15
Remuneration and allowances 16
Functions of Board 16
Executive officer and other officers 17
Protection from liability 18
Part 3
Licensing of electrical workers
Part 3 — Licensing of electrical workers
Division 1 — General
Electrical work prohibited unless authorised 19
Electrical worker’s licence, types and effect of 24
Permit, effect of 25
Eligibility for electrical worker’s licence 26
Application for licence or permit 28
Issue of licence or permit 29
Duration of registration of licence or permit 30
Registration and renewal of registration of licences 31
Contact details 32
Physical examinations and competency tests, Board may require 32
Disciplinary action, proper causes for 33
Disciplinary action by SAT 35
31A. Alternative to seeking disciplinary action under r. 31 36
Suspension, effect and revocation of 37
Div 2
Approved CPR courses
Division 2 — Approved CPR courses
32A. Terms used 38
32B. Approved CPR courses 39
32C. Director may approve longer completion period for approved CPR courses 39
32D. Director may exempt licensed electricians from completing approved CPR courses 40
32E. Requirement to complete approved CPR courses for licensed electricians on commencement day 41
32F. Requirement to complete approved CPR courses on issue of first endorsed electrician’s licences after commencement day 41
Mechanically, the regime centralises licensing decisions with the Board, operational control and limited delegated discretion with the Director, and operational compliance and sanctioning through statutory offences, registration conditions, and disciplinary processes culminating in orders by the State Administrative Tribunal (r. 31, r. 47).
Main concepts
The regulations are built around a small set of interlocking legal concepts that determine coverage and obligations.
Electrical work, the pivot of regulation, is defined broadly (r. 4A). It covers work on electrical machines, installations and appliances supplied or intended to be supplied above defined voltage thresholds (50 V AC; 120 V ripple free DC), and includes assessment work ensuring compliance with the regulations. The definition excludes vehicle propulsion system components (r. 4A(1A)). The wide scope makes the licensing and supervision rules applicable to a broad range of industry activities.
Licences and permits. The instrument distinguishes electrical worker licences (Part 3, r. 20) , electrician (authorised to carry out installing and fitting work unsupervised, r. 20(2a)-(3)), electrician’s training licences (supervised work only, r. 20(3)), and restricted licences (work linked to a trade/calling but not fixed wiring, r. 20(4)-(5)). A permit provides temporary or conditional authorisation equivalent to a corresponding licence and may impose stricter supervisory conditions (r. 21).
Electrical contractors and in‑house work. Separate authorisation applies to persons who carry on business as electrical contractors (r. 33) and to organisations carrying out in‑house electrical installing work (r. 37). Licensing of contractors requires nominee(s) who hold electrician licences and relevant experience, and proof of prescribed insurance (r. 36).
Supervision and competency. The regulations set three discrete levels of supervision , broad, general and direct , and define their content (r. 49D). Employers and supervising electrical workers have explicit duties to determine and provide appropriate supervision, cap supervisor:supervisee ratios in certain circumstances (r. 50(3)(h)), and permit apprentices a limited scope for work on energised parts in final apprenticeship year under strict conditions (r. 50(6)).
Notifiable work, notices and certificates. Notifiable work is defined (r. 3) and triggers procedural obligations: preliminary notice to network operator (r. 51) and notice of completion (r. 52) within fixed timeframes, and where relevant the issue of an electrical safety certificate to the person for whom work was done (r. 52B). Notices and certificates must contain specified information and be retained for prescribed periods (r. 52(1a), r. 52(2D)).
Standards and Director’s technical instruments. Work must comply with the Australian/New Zealand Wiring Rules (AS/NZS 3000), the WA Electrical Requirements (Director’s instrument), the standards listed in Schedule 2 and the Director’s Code of Practice for work on or near energised installations (r. 49). Regulation 49(2a) empowers the Director to vary, specify additional or exclude requirements for electrical installations of a consumer.
Safety of work on energised installations. Regulation 55 requires a competent person to undertake a risk assessment before any work on or near energised parts, insists on the absence of reasonable alternatives and on reduction of risk to as low as reasonably practicable, and links to the Work Health and Safety (General) Regulations 2022 for safe work method statements where that regime is not otherwise applicable.
Governance and enforcement structures. The Electrical Licensing Board is the formal licensing body (r. 4-15). The Director can direct the Board (r. 13(3)), issue approvals and exemptions (e.g. r. 32B, 32D), and may proceed by administrative order under r. 31A and r. 47A as alternatives to SAT proceedings. Disciplinary proceedings before the State Administrative Tribunal are the formal adjudicative mechanism for serious disciplinary matters (r. 31, r. 47).
Record retention and inspection. Multiple provisions require retention of records (notices, certificates, modified procedure records) for 5 years (r. 52(2), r. 52(2D), r. 52BC(2)(e)), and empower Board, Director and inspectors to require production and inspection (r. 58, r. 32I).
These concepts form the operational logic: licensing limits who may do what, supervision controls how less experienced persons are used, notices and certificates create auditable trails for notifiable work, and standards plus risk assessment govern technical safety. The Director and Board provide a mix of prescriptive technical direction (WA Electrical Requirements, approvals) and discretionary case management (exemptions, disciplinary alternatives).
Who it affects
The regulations assign obligations, entitlements and potential liabilities to multiple classes of actors. Listing the principal affected parties with the core burdens they bear:
Individual electrical workers and electricians. To perform regulated electrical work they must hold an appropriate electrical worker’s licence (r. 19; r. 20). Licence eligibility is controlled by training, apprenticeship completion or Board‑approved alternative training and passing of assessments (r. 22). Licensed electricians must comply with supervision rules when supervising others (r. 50) and from commencement day must complete approved CPR courses per the new Division 2 requirements (r. 32E-32G), subject to Director exemptions (r. 32D).
Apprentices and trainees. Apprentices are regulated in relation to supervision and authorised training (definitions r. 3; r. 19(2)(q); r. 50AA). Employers must ensure apprentices are supervised appropriately and in certain circumstances apprentices may not work on or near energised parts except under defined limits (r. 50(6)).
Restricted licence holders. These persons are authorised to undertake electrical work associated with their trade or calling but are specifically prohibited from installing or altering fixed wiring (r. 20(4)-(5)).
Electrical contractors (individuals, firms, bodies corporate). A business carrying on electrical contracting must hold an electrical contractor’s licence (r. 33). Licences require nominated qualified personnel, proof of experience, specified training and prescribed insurance (r. 36). Contractors have statutory duties to provide notices for notifiable work (r. 51), deliver notices of completion (r. 52), and issue electrical safety certificates (r. 52B). They must retain records (r. 52(1a), r. 52D).
Organisations performing in‑house electrical installing work. Such organisations must hold an in‑house electrical installing work licence or comply with contracting rules and nominee requirements (r. 37). The licence holder must ensure nominated employees meet criteria (r. 37(1)(a)(i)-(iv)) and take on the contractor duties where relevant (r. 53(1)).
Employers and labour hire agents. Employers are required to keep records of licensed employees (r. 57), ensure supervision duties are performed (r. 50(3)), make enquiries before employing purportedly qualified former apprentices (r. 50AB), and in labour hire arrangements ensure supervising workers are properly informed of experience and competence (r. 50AA).
Network operators and the Director. Network operators are recipients of preliminary notices, notices of completion and may be required to perform inspections and levy further inspection fees (r. 51-52; r. 53A; Schedule 1 item 8). For installations not connected to a network operator, the Director acts as the relevant network operator (definition at r. 3). The Director also approves CPR courses (r. 32B), may grant exemptions to CPR requirements (r. 32D), varies technical requirements (r. 49(2a)), and can give written directions and administrative orders (r. 13(3); r. 31A; r. 47A).
Training providers and course assessors. The Director approves CPR course providers (r. 32B). Bodies approved to conduct examinations and assessments receive prescribed fees for assessment (r. 22(5)(b)). The Board sets competency standards and may require theoretical or practical assessments (r. 29).
Consumers (large and small). Consumers are affected indirectly: notifiable works on their installations trigger contractor obligations and network operator interactions (r. 51-52). The Board membership includes consumer representatives (r. 5(1)(e), (f), (fa)), reflecting consumer stake.
Inspectors and the State Administrative Tribunal. Inspectors enforce compliance, request records and investigate accidents (r. 52BC(2)(d); r. 63). Unresolved disciplinary allegations are dealt with by SAT (r. 31, r. 47).
Who pays: regulated persons and businesses bear the direct monetary costs. Fees for applications, registrations and renewals are set out in Schedule 1 (items 1-6) and are payable to the Director for most matters (r. 64). Further inspection fees are payable to the relevant network operator (Schedule 1 item 8; r. 53A note). Contractors must hold prescribed insurance (r. 36(c)), and monetary penalties for breaches can be substantial (general penalty r. 65: up to $50,000 for individuals and $250,000 for bodies corporate). CPR course non‑compliance and refusal to produce course records attract specific $10,000 fines (regs 32E-32G, 32I).
Decision makers: the Board issues licences and oversees qualifications (r. 13(c)), the Director has operational authority for approvals, exemptions and administrative sanctions (r. 13(3); r. 32B; r. 32D; r. 31A; r. 47A), and SAT adjudicates disciplinary allegations (r. 31, r. 47). The network operator exercises operational control over connections and inspections (r. 51-52, r. 53A).
Key duties and rights
The regulations set out specific duties to obtain authorisation, to act in specified ways, and rights or procedural protections for licence‑holders when disciplinary action is taken.
Duties to be licensed and to maintain licences
A person must not carry out electrical work unless authorised by a licence or permit, subject to specified exclusions (r. 19(1) and 19(2)). Eligibility criteria for licences are explicit: electrician licences require apprenticeships or approved VET courses and Board‑recognised assessments (r. 22(1)-(2)); restricted licences require evidence the work is associated with the holder’s trade and suitable training/assessments (r. 22(4)).
Application, issue and renewal
Applications and renewals are lodged with the executive officer in specified forms with fees (r. 23, r. 27, Schedule 1). The Board must be satisfied that an applicant is a fit and proper person before issuing a licence or permit (r. 24(1)(a)-(b)), and must provide reasons in writing where it refuses or imposes conditions (r. 24(5)). Renewal windows and conditional renewal provisions are set out at r. 27 and r. 44.
Supervision, competency and testing obligations
Employers must ensure effective supervision of electrical work (r. 50(1)-(4)). Supervising electrical workers have duties to determine appropriate levels of supervision and to provide it (r. 50(4)(d)-(f)). The Board may require physical examinations and competency tests of licence holders or applicants (r. 29), and may refuse renewal or suspend licences for failures (r. 29(3)(d)-(e)).
Standards and technical duties
All electrical work must comply with the Australian/New Zealand Wiring Rules, WA Electrical Requirements issued by the Director, the standards in Schedule 2 and the Director’s Code of Practice for working on or near energised installations (r. 49). Designers must ensure installations are safe and provide installation guidance (r. 49A). Electrical work must be completed to a trade finish and be safe to use (r. 49B).
Notification, certification and recordkeeping
Electrical contractors must deliver preliminary notices and notices of completion for notifiable work within prescribed timeframes (r. 51-52) and issue electrical safety certificates within 28 days after completion (r. 52B(1)). Notices and certificates must contain prescribed declarations and supporting records of testing and inspection (r. 52(2B), r. 52(2D), r. 52B(4)). Notices and certificates must be retained (r. 52(1a), r. 52B(2)) and made available to inspectors (r. 52BC(2)(d), r. 58).
Work on energised installations
Work on or near energised parts requires a risk assessment by a competent person, a finding of no reasonable safe alternative, suitable risk controls and use of appropriate PPE (r. 55(2)). If WHS reg. 299 does not apply, a safe work method statement prepared according to that regulation must be prepared as if the work were high‑risk construction work (r. 55(2)(c)).
Reporting obligations
Electrical workers must report unsafe installations to the owner/occupier and the relevant network operator or the Director (r. 62). Electrical accidents must be reported immediately to the relevant network operator or the Director and network operators must report to the Director (r. 63).
Disciplinary process and rights
The Director may allege proper cause for disciplinary action to SAT (r. 31(1)). SAT can cancel, suspend, vary or impose conditions on licences and require retraining or testing (r. 31(2)). As an administrative alternative to SAT action, the Director may impose restrictions, require training or testing or censure under r. 31A and r. 47A, provided the person is given an opportunity to explain and to elect SAT (r. 31A(1)(b)-(c); r. 47A(1)(b)-(c)). Orders under r. 31A and r. 47A must be in writing and given to the person (r. 31A(6); r. 47A(6)).
Enforcement and production powers
The Board may require licence documents be produced for inspection (r. 58). The Director may give written directions requiring production of certified CPR course completion records (r. 32I), and inspectors may demand records kept under the modified procedure for construction projects (r. 52BC(2)(d)). Failure to comply with directions or to produce documents is an offence with prescribed penalties in some instances (e.g. r. 32I(6)).
Rights to representation and procedural protections
Where the Director offers administrative disposal rather than SAT proceedings, the person may provide explanations in person or in writing and may be represented by a legal practitioner or other representative (r. 31A(3); r. 47A(3)). Where the Board refuses to issue or imposes conditions, reasons must be provided in writing (r. 24(5)).
Insurance and disclosure obligations
Contractors must hold prescribed insurance against civil liability as specified by the Board (r. 36(c); r. 36(2)(c); r. 36(3)(c)). The Board may require details of the prescribed policy by written notice (r. 44A), and licence registration is suspended where insurance is not held (r. 43(3)).
These duties create a compliance network in which licensing status, occupational supervision, technical conformity with standards, timely administrative notifications and retention of documentary records are central. The regime couples criminal and disciplinary responses (r. 59; r. 65) with administrative orders and Board oversight (r. 31A; r. 47A; r. 13).
Penalties and enforcement
The regulations combine criminal offences, administrative disciplinary processes and civil‑style regulatory controls to drive compliance. Enforcement actors and mechanisms are set out across the instrument.
Monetary penalties and criminal offences
The general penalty provision establishes maximum fines for breaches where no other penalty is provided: up to $50,000 for individuals and $250,000 for bodies corporate (r. 65(2)). Specific offences with designated penalties exist: failure by a licensed electrician to complete an approved CPR course within a completion period is expressly a penal offence with a $10,000 fine (r. 32E(2), r. 32F(2), r. 32G(2) each state "Penalty ... $10,000"). Failure to comply with a written direction to provide course completion records is a separate offence with a $10,000 fine (r. 32I(6)). Other specific criminal offences include delivering false or misleading notices or certificates (r. 52A(5); r. 52B(7)), delivering a notice of completion for work not carried out (r. 52A(6); r. 52(3)), false statements in applications (r. 59), employing unlicensed persons (r. 53(2)), unlawful contracting (r. 34), causing unsafe wiring to be connected (r. 50A), and interfering with the scene of an electrical accident (r. 63A).
Disciplinary and administrative sanctions
The Director may commence disciplinary proceedings by alleging to SAT that there is proper cause (r. 31(1)). SAT may cancel or suspend licences (up to 12 months by order, r. 31(2)(c)), vary restrictions and conditions on licences (r. 31(2)(d)), require retraining or testing (r. 31(2)(e)-(f)), censure (r. 31(2)(g)), or recommend criminal proceedings (r. 31(2)(h)). A mirror process applies to contractors under r. 47.
As an administrative alternative, the Director may exercise powers under r. 31A and r. 47A to impose restrictions, require training, assessments or tests, censure, or institute criminal proceedings, provided procedural steps are observed (opportunity to explain and option to proceed to SAT, r. 31A(1)(b)-(c); r. 47A(1)(b)-(c)). Orders made under these powers must be in writing, and copies provided (r. 31A(6); r. 47A(6)).
Suspension, revocation and return of licences
Suspensions and cancellations take effect operationally: during suspension the holder cannot carry out the work authorised by the licence (r. 32(1); r. 47B(1)). Licence documents must be returned to the Board on suspension or cancellation (r. 61). The Board can revoke suspensions that it imposed, except where suspension was imposed by SAT, in which case its revocation requires SAT approval (r. 32(2)-(3); r. 47B(2)-(3)).
Inspection, record production and monetary charges
Inspectors may demand records and inspect sites; if, on inspection, remedial further inspections are required due to non‑conformance, a further inspection fee is payable to the network operator (r. 53A(1); Schedule 1 item 8). The network operator may waive or require payment in advance (r. 53A(2)).
Enforcement actors and interplay
The Director initiates most administrative enforcement actions and can delegate certain powers to the Board (r. 63B). The Board administers licensing decisions and can itself impose orders and require production of documents (r. 24(5); r. 58). SAT is the adjudicative body for formal disciplinary allegations (r. 31; r. 47). Network operators exercise operational enforcement as recipients of notices, they may inspect and deny connections, and they are the payee of certain fees (r. 51-52; r. 53A).
Procedural safeguards
Persons subject to disciplinary or administrative orders have procedural safeguards in the rules: reasons for decisions must be provided in writing (r. 24(5)); opportunity to explain to the Director and the option to proceed to SAT are required before the Director exercises the alternative powers (r. 31A(1)(b)-(c); r. 47A(1)(b)-(c)); where orders are imposed the Board may require licence documents be returned and endorse conditions (r. 31(3); r. 31A(5); r. 47(3); r. 47A(5)). Representation by a legal practitioner for oral explanations to the Director is permitted (r. 31A(3); r. 47A(3)).
Enforcement risks and operational friction
The instrument creates multiple points of enforcement (Director, Board, SAT, network operators, inspectors) and mixes criminal penalties with disciplinary processes. For regulated entities, this multiplies compliance triggers: technical non‑conformance found on inspection can lead to further inspection fees (r. 53A), notices of completion or safety certificates that are deficient can attract criminal liability (r. 52(3); r. 52B(7)-(8)), and failure to produce required records or to meet CPR obligations can lead to immediate penal fines (Div. 2, r. 32E-32I). Enforcement powers also include discretionary administrative orders that can be exercised without invoking SAT in every case, subject to procedural protections (r. 31A; r. 47A).
How it interacts with other laws
The regulations operate in a statutory network. They explicitly reference and incorporate provisions, definitions and procedures from federal and state Acts and subordinate instruments, and provide cross‑regulatory compliance points.
Statutory cross‑references and definitions
Electricity Act 1945: The regulations are made under the Electricity Act 1945 and adopt its concept of an electrical installation (r. 3 definition of electrical installation refers to Electricity Act 1945 s. 5(1)). The Board and Director operate within the broader administration of the Act.
Electricity (Network Safety) Regulations 2015: The definition of network and major network operator, and the status of certain operators in the regime, is taken from the Electricity (Network Safety) Regulations 2015 (r. 3 definitions; r. 54B applies r. 55 as modified for certain network operators). Reporting obligations for incidents cross‑refer to the Director as defined under network safety rules (r. 63(7)).
Work Health and Safety rules: Regulation 55 references the Work Health and Safety (General) Regulations 2022 reg. 299 in prescribing safe work method statements for work on energised parts. The WHS regulatory framework thus overlays technical and procedural duties for risk assessment and safe work method statements.
Vocational Education and Training Act 1996: Definitions of apprentice and training contracts rely on that Act (r. 3; r. 19(1A) definition of relevant training contract).
Building Act 2011 and Mines regulations: Certain exemptions and construction‑related arrangements depend on other statutes. For example, removal of wiring during demolition requires a demolition permit under the Building Act 2011 to engage the exemption in r. 19(2)(p). Mines safety and inspection rules are incorporated for mines' record requirements and exceptions (r. 52(2AA)-(2AC), r. 52B(3)(c), r. 52B(4B)-(4C)).
Public Sector and Financial Management Acts: The Board operates within public sector governance: the Director may give directions to the Board and such directions are to be included in the department’s annual report under the Financial Management Act 2006 Part 5 (r. 13(3)-(4)). Membership rules refer to the Public Sector Management Act 1994 (r. 5(1)(g)).
Standards and codes
The regulations anchor technical compliance to standards: AS/NZS Wiring Rules (AS/NZS 3000:2018), the WA Electrical Requirements issued by the Director, and the standards listed in Schedule 2 (r. 49(1)(a)-(c)). The regime gives the Director power to set or vary the day on which updated Standards Australia material takes effect for regulatory purposes (r. 49(2B)), thereby creating an administrative gate for adoption of new technical standards.
Administrative law and subsidiary instruments
Approval of CPR courses under regulation 32B is not subsidiary legislation (r. 32B(4)), but the Interpretation Act 1984 sections 43 and 44 and Part VIII apply to the approval as if it were subsidiary legislation (r. 32B(5)). This creates a hybrid administrative instrument: approvals are not formal regulations, but the Interpretation Act’s publication and interpretation mechanisms apply.
Interaction with mining and transport regimes
The instrument provides specific exceptions and modified rules for mine sites and transportable structures (r. 52(2AA); r. 52BA), and the private generating plant definition excludes certain large network operators and particular exemption orders under the Electricity Industry Act 2004 (r. 4AA(2)). That allocates different duties depending on the institutional ownership of networks or plant.
Overlap and potential duplication
The regulations intentionally overlap with workplace health and safety law for energised work (r. 55) and with local building and demolition rules (r. 19(2)(p)), creating dual obligations. The practical interaction requires regulated parties to align compliance across regimes: for example, WHS safe work method statements and the r. 55 requirement are cross‑linked so that WHS compliance may satisfy part of the electricity licensing regime. Network safety reporting obligations under the Electricity (Network Safety) Regulations 2015 can also serve in place of particular reporting obligations here (r. 63(7)).
Practical consequence for regulated parties
Entities must operate within a matrix of obligations under multiple Acts and subordinate instruments. Technical standards compliance under r. 49 references Standards Australia material and a Director‑issued WA Electrical Requirements instrument, meaning that technical compliance requires monitoring both standards bodies and Director publications. Decisions by the Director, for example to vary which standards apply (r. 49(2a)) or to approve CPR courses (r. 32B), are administrative levers that change operational requirements without amendments to the regulations themselves, though the Interpretation Act is engaged to ensure published approvals are effective.
Amendment history
The regulations have been amended frequently since their commencement on 1 November 1991 (r. 2). The compilation table records a long amendment sequence; the excerpts provided here show notable, recent and structural changes.
Early and mid‑period changes
The instrument has been subject to iterative updates in the 1990s and 2000s (amendment regulations in 1994, 1996, 1999, 2000, 2003, 2004, 2007; compilation table entries). These amendments effected membership rules for the Board (r. 5 amendments), licensing transitions, and introduced various administrative and disciplinary provisions (e.g. r. 29 additions, r. 31 insertions).
Major structural changes in 2004-2008
The Electricity (Licensing) Amendment Regulations 2004 and 2007 effected structural reworkings, including the insertion of disciplinary and administrative alternatives, physical examination powers and harmonisation with other Acts. Regulation 31 (disciplinary action by SAT) and r. 31A (administrative alternative) were inserted in the 2004 amendment (Gazette 30 Dec 2004). The 2007 amendments included transitional arrangements and changes to licence categories (e.g. conversion of 'A' and 'C' grade licences into 'electrician' and 'electrician’s training licence' under r. 67).
Technical standards and safety code insertions
Schedule 2 and r. 49 have been updated to reference contemporary standards and the Director’s WA Electrical Requirements. Schedule 2 was inserted or updated in 2012 (Gazette 13 Apr 2012) and amended in 2017 (Gazette 2 May 2017), reflecting ongoing alignment with AS and AS/NZS standards.
Recent amendments , CPR regime and fees
The Electricity Regulations Amendment (Licensing) Regulations 2024 (SL 2024/211) inserted Division 2 in Part 3 establishing the approved CPR course requirement (regs 32A-32I). These provisions are new in 2024 and create specified offences with set penalties ($10,000) and administrative powers for the Director to approve courses, grant exemptions in emergencies, and require course completion records. The Director must publish approved course lists on the department website (r. 32B(2)).
Fee changes and Schedule 1 updates are recent: Schedule 1 has an insertion heading SL 2025/89 (itemised fees including application, registration, renewal, replacement and further inspection fees) and the regulations now state that fees in Schedule 1 are payable (r. 64 was inserted SL 2024/96 r. 23; Schedule 1 updated SL 2025/89).
Deletions and relocations
Some provisions have been deleted or relocated over time: regulation 25 is deleted (SL 2022/36 r. 12); r. 48 was deleted in 1996; Divisions 2 and 3 (r. 16-18) were deleted in 2004; and other housekeeping edits show in the notes. The compilation table documents numerous amending instruments across 1992-2025.
Transitional provisions and preserving legacy licences
Transitional rules preserve the authorisations of holders of older licence grades such as "A" and "C" grades, converting them into the current licence categories on renewal (r. 67). The 2007 amendment contains a specific transitional table converting older licences into contemporary equivalents.
Practical implication of amendment history
The instrument has evolved by incremental amendment rather than by periodic wholesale rewrite. Recent amendments evidence two trends: (1) continuing technical standard alignment and regulatory scaffolding for large construction projects (r. 52BB and following, inserted 2019; r. 52BC), and (2) public safety training mandates (CPR course regime, 2024). Fee recalibrations and administrative clarifications have followed. For practitioners and compliance officers, the amendment record signals the need for active monitoring of Director publications and Gazette notices that operationalise standards and approvals (r. 49(2B); r. 32B(2)).
Litigation history
The text of the regulations as provided does not cite or summarise judicial decisions or administrative law cases interpreting its provisions. There is no list of reported litigation included within the instrument. The enforcement and dispute resolution pathways established by the regulations, however, create foreseeable litigation or review points:
State Administrative Tribunal (SAT) proceedings. The Director brings allegations of proper cause for disciplinary action to SAT (r. 31(1)); SAT has the statutory jurisdiction to cancel, suspend or vary licences, order retraining or testing and to impose other remedies (r. 31(2)). The regulations therefore envisage contested administrative proceedings in SAT as the principal adjudicative forum for licence discipline.
Administrative decisions review. Decisions of the Board and the Director (for example, refusal to issue a licence, imposition of conditions, or an administrative order under r. 31A/r. 47A) will be amenable to the administrative law remedies available in the State (judicial review in superior courts) although the regulations themselves do not set out appeal routes beyond SAT and the procedural protections in the disciplinary and administrative parts (r. 24(5) requires reasons in writing; r. 31A and r. 47A provide opportunity to be heard and to elect SAT).
Criminal prosecutions. The regulations create specific criminal offences (r. 19(1); r. 52(3); r. 52B(7)-(9); r. 59; r. 65). These could lead to prosecutions in courts; statutory defences are sometimes provided (for example, a defence of reasonable excuse for failing to complete CPR courses, r. 32E(3), r. 32F(3), r. 32G(3), or that a worker believed on reasonable grounds a certificate was valid, r. 52B(10)). The regulations themselves do not name cases or record litigation precedents.
Record and standards challenges. The Director’s power to vary technical standards application (r. 49(2a)) and to publish WA Electrical Requirements (r. 49(1)(b)) creates administrative decisions that could be challenged if a regulated party disputes the Director’s exercise of discretion or procedural fairness in making such instruments. Similarly, the Director’s approvals for CPR courses and the Interpretation Act’s partial application to those approvals (r. 32B(4)-(5)) present administrative points where review might be sought.
Because the regulations do not contain case law, practitioners must look externally to SAT decisions, superior court jurisprudence and any prosecutions under the regulations to understand how particular provisions are interpreted. The procedural architecture shows SAT as the central forum for contested disciplinary matters, and ordinary courts for enforcement prosecutions, but the regulations do not provide a litigation digest or list of authorities.
Gotchas
Several practical traps and compliance friction points arise from the text. These are concrete operational hazards that owners, contractors, employers and compliance officers should note.
Scope and definition dependencies
The definition of electrical work (r. 4A) is voltage‑threshold based and includes assessment work. Tasks that parties might assume are outside the regime, such as testing or measurement by a professionally qualified electrical engineer (r. 19(2)(n)), do attract regulation in particular circumstances. Conversely, work on vehicle propulsion components is excluded (r. 4A(1A)). Misreading the definitions may lead to accidental unlicensed activity.
Licensing is activity‑based not title‑based
Regulation 33 takes a functional approach to who is an electrical contractor. A person who carries out electrical installing work otherwise than as an employee of a licensed contractor is taken to carry on business as an electrical contractor (r. 33(4)). Small businesses who occasionally perform installing work risk falling within the contractor licensing requirement.
Nominee rules and suspension risk
Contractor licences depend on nominated persons meeting experience and licensing criteria (r. 36). If a licence‑holder ceases to employ at least one nominee and does not make Board‑satisfactory arrangements, the licence is automatically suspended by operation of regulation 38(7). The administrative consequence is immediate operational incapacity and potential downstream liabilities.
Broad supervisor responsibilities and ratio limits
Employers must ensure supervision levels appropriate to competence and task (r. 50) and supervising workers must not supervise more than the set number of supervised workers when direct supervision is required (r. 50(3)(h)(i)-(ii)). Failure to plan rosters and supervisory allocations to meet these caps can create unintentional breaches.
Notices, timing and multi‑contractor work
For notifiable work, preliminary notice timing varies depending on whether advice from the network operator is required (r. 51(3) - at least 3 working days if advice sought). Notices of completion must be delivered within three days of completion (r. 52(1)), and where multiple contractors share work, each contractor must submit notices for its portion and describe the portion (r. 52(5)). Complex projects need administrative coordination or risk criminal offences for late or missing notices.
Modified procedure for large construction projects is conditional and record‑heavy
The modified procedure (r. 52BB-52BE) relieves frequency of notices but requires an electronic record, weekly updates, on‑site retention and production on demand by an inspector (r. 52BC(1)-(2)). The Director has power to order cessation of the modified procedure and remedial action where failures are substantive or repeated (r. 52BC(3)-(4)). Mismanagement of the record keeping process can trigger orders to revert to the default procedure.
Standards adoption requires active monitoring
Standards Australia updates do not automatically take effect for regulatory purposes; the Director declares the commencement day or, if none is declared, the standards take effect only after a 6‑month interval (r. 49(2B)). Compliance officers must track Gazette notices and Director pronouncements to know when new standard versions are enforceable.
CPR obligations and record production are criminalised
The newly inserted CPR regime creates a strict compliance obligation with a $10,000 penalty for failure to complete required courses within defined completion periods (r. 32E-32G) and for failure to comply with a Director direction to give course completion records (r. 32I). These are specific criminal sanctions distinct from the general penalty (r. 65). The Director may exempt classes of electricians in emergencies or where courses are unavailable (r. 32D), but exemptions are time‑limited and conditional.
Insurance and suspension
An electrical contractor’s licence is automatically suspended where the prescribed policy of insurance is not held (r. 43(3)). The Board can require details of the policy (r. 44A). Failure to maintain and provide proof of insurance can stop business operations.
Firm member liability and defences
Members of a firm can be taken to have committed an offence if the firm contravenes the rules (r. 65A(1)). The statutory defence requires proof of absence of consent or connivance and reasonable preventive measures (r. 65A(2)), which places evidential and organisational burdens on firm members to document compliance.
Multiple enforcement levers
The mix of criminal offences, administrative orders, SAT proceedings and inspector actions increases compliance complexity. For example, a failure detected on inspection can trigger remedial inspection fees (r. 53A), criminal exposure for false notices (r. 52A(5)), and potential SAT discipline (r. 31), all arising from the same event.
Record retention horizons
Many records must be kept for 5 years (r. 52(1a), r. 52(2D), r. 52B(2), r. 52BC(2)(e)), which imposes long‑term document management requirements for contractors, particularly where cloud or electronic systems are used. The Director can require that records be provided electronically to specified addresses and a failure to comply carries the specified penalties (r. 32I(5)-(6)).
Practitioners should map these friction points into operational procedures, allocate responsibilities, and document compliance to manage inspections, notices and the new CPR obligations. Nominee management, insurance proof, and robust record systems are especially material.
How to comply
Compliance under these regulations is procedural, documentary and technical. Below is an operational checklist mapped to regulatory provisions, aimed at legal, compliance and operational teams.
Licensing and workforce compliance
Verify who in the workforce requires what authorisation: review the activity matrix against r. 4A and r. 19 to determine whether the task is regulated. Ensure individuals performing regulated tasks hold an appropriate electrical worker’s licence endorsed as necessary (r. 20, r. 22).
For contractors or in‑house operations, ensure the business holds an electrical contractor’s licence or an in‑house electrical installing work licence as applicable (r. 33; r. 37). Nominate and document at least one qualified nominee who meets r. 36 or r. 37 experience and testing requirements. Use r. 38 procedures to add or replace nominees and pay the fee (Schedule 1 item 7).
Maintain registrations and renew within the specified windows (r. 27(2)-(3) and r. 44(1)). Record and act on Board notices requiring completion of safety courses or other conditions (r. 27(3a)).
Insurance and financial compliance
Hold the prescribed policy of insurance required under r. 36(c). Ensure that insurance coverage aligns with Board specifications, and respond promptly to any Board notice under r. 44A requesting policy details. Maintain coverage to avoid automatic licence suspension (r. 43(3)).
Technical and safety compliance
Ensure all electrical work conforms to the applicable standards: AS/NZS Wiring Rules (AS/NZS 3000), WA Electrical Requirements (Director’s instrument), Schedule 2 standards and the Director’s Code of Practice for working on or near energised installations (r. 49(1)). Maintain a process to monitor Standards Australia updates and Director publications under r. 49(2B) and r. 32B(2).
For work on or near energised parts, perform risk assessments by a competent person, document the finding that no reasonable alternative exists and that risks are reduced to as low as reasonably practicable (r. 55(2)). If WHS reg. 299 does not apply, prepare a safe work method statement as if the work were high‑risk construction work (r. 55(2)(c)).
Supervision and training
Implement written supervisory plans aligned to r. 49D and r. 50. Determine appropriate supervision levels for tasks, ensure supervising electrical workers are authorised to work unsupervised and have technical experience (r. 50(3)(a)), and observe supervising worker ratios (r. 50(3)(h)). Ensure apprentices have the required supervision and document competence prior to work on energised parts (r. 50(6)).
For the CPR requirement (Div. 2, r. 32A-32I), map all licensed electricians to completion periods, confirm approved course availability and schedule initial and continuing CPR courses accordingly (r. 32E-32G). Retain course completion records and prepare to respond to Director directions under r. 32I within the 10 working day timeframe. Apply for Director exemptions under r. 32D where applicable (public health emergency, course unavailability, personal circumstances).
Notifications, certificates and records
Build a notice calendar for notifiable work: preliminary notices to relevant network operators (r. 51) , at least 3 working days in advance where advice is required , and notices of completion within 3 days of completion (r. 52). For electrical installing work, issue electrical safety certificates to the client within 28 days (r. 52B(1)). Ensure notices and certificates contain required declarations and testing records (r. 52(2B) and r. 52(2D); r. 52B(4)).
For large construction projects that qualify, evaluate whether to use the modified procedure (r. 52BB). If adopting it, maintain the electronic record described in r. 52BC(1)-(2): weekly updates, on‑site retention, inspector production on demand, and 5 year retention after project completion. Be prepared to cease the modified procedure if ordered under r. 52BC(4).
Retain all records (notices of completion, safety certificates, test records, CPR completion records) for the statutory periods (generally 5 years as specified in r. 52(1a), r. 52(2D), r. 52B(2) and r. 52BC(2)(e)).
Operational accountability and internal controls
Assign clear responsibilities for licence renewals, nominee tracking, insurance, notice preparation and dispatch, record retention, and statutory reporting (unsafe installations, r. 62; accidents, r. 63). Use documented delegations and checklists to reduce the risk of human error.
Implement quality assurance and auditing of electrical safety certificates and notices before dispatch to verify completeness and accuracy; false or misleading notices attract criminal liability (r. 52A(5); r. 52B(7)).
Maintain contingency plans to provide proof of CPR course completion in the event of a Director direction (r. 32I). Consider structuring staff training and recertification cycles to minimise administrative churn and compliance lapses when completion periods expire.
Interaction with WHS and other regimes
Coordinate compliance with WHS obligations for energised work (r. 55) and construction site obligations; ensure safe work method statements, risk assessment records and WHS controls satisfy both regimes. For demolition work, verify that demolition permits and other Building Act obligations are in place before relying on the demolition exemption in r. 19(2)(p).
Responding to enforcement and dispute readiness
Prepare a template process for responding to Director or Board inquiries and notices, including timelines for explanations and the option to elect SAT as provided in r. 31A and r. 47A. Keep records that demonstrate a reasonable preventative system to rely upon the statutory defence for members of firms under r. 65A(2).
Fee management and inspections
Budget for licence application, registration and replacement fees as per Schedule 1. Be aware of the further inspection fee payable to network operators under r. 53A and Schedule 1 item 8; obtain network operator contact protocols and invoicing expectations to manage cashflow when remedial inspections are required.
Legal and governance steps
Seek Board pre‑application advice for borderline eligibility questions where the Board can assist (r. 13(aa)), and consider pre‑emptive consultation with the Director if seeking exemptions (r. 32D) or intending to use the modified procedure for large projects (r. 52BB(2)(c)).
By implementing these concrete steps , mapping activities to licence needs, instituting supervisory and recordkeeping systems, scheduling course completions, and aligning WHS and building obligations , regulated entities can reduce the probability of administrative orders, SAT proceedings or prosecutions. Documentation is central: the regime is enforcement‑and‑paper driven, and a defensible compliance posture relies on auditable records.
Part 4Licensing of electrical contractors and for in‑house electrical installing work
Contracting with unlicensed person for electrical installing work, offence 46
False representations as to completed electrical work 46
Eligibility for electrical contractor’s licence 46
In‑house electrical installing work, when permitted 48
Nominees under r. 36 and 37, cancelling etc. 50
38A. Nominee not required to comply with certain directions 51
Applications for licences and renewals of registration 52
Issue and registration of licence 52
Changes to firm, effect of on firm’s licence 53
Changes to firm, Board to be notified of 53
Duration of registration of licence 53
Renewal of registration of licence 54
44A. Insurance of licensed electrical contractor, Board may require details of 55
Place of business, display of licence at and change of etc. 55
45A. Physical examinations, Board may require 56
Disciplinary action, proper causes for 57
Disciplinary action by SAT 58
47A. Alternative to seeking disciplinary action under r. 47 60
47B. Suspension, effect and revocation of 61
47C. Nominees to be notified of cancellation or suspension of licence 62
Part 5 — Regulation of electrical work
Division 1 — General regulation of electrical work
Requirements for electrical work 63
49A. Electrical installation designers, duties of 65
49B. Electrical work to be carried out to safe standard and completed to trade finish 65
49C. Supervision of electrical work: interpretation 65
49D. Supervision of electrical work: levels of supervision 66
Supervision of electrical work: requirements 68
50AA. Supervision of electrical work: informing employer and supervisor of experience of apprentice or trainee 72
50AB. Employer to be satisfied former apprentice has successfully completed training 73
50A. Licence holder not to cause or permit unsafe wiring or equipment to be connected to electrical installation 73
Notifiable work, preliminary notice of to be given to network operator 74
Notifiable work, notice of completion of to be given to network operator 76
52A. Notices under r. 51 and 52, delivery of 79
52B. Electrical safety certificates, issue of for electrical installing work 80
52BA. Transportable structures: when compliance with regulations 51, 52 and 52B not required 84
52BB. Notifiable work: modified procedure available for certain construction projects 85
52BC. Modified procedure: record of electrical installing work 88
52BD. Modified procedure: notice requirements 89
52BE. Modified procedure: opting in and ceasing 90
52C. Electrical contractor’s duties as to electrical installing work 91
Electrical installing work other than by electrical contractors etc., unlicensed persons not to be employed, engaged etc. 91
53A. Further inspection fee, when payable 92
Notices of completion and certain records, signing of 93
Division 2 — Regulation of electrical work on energised electrical installations
54A. Interpretation 94
54B. Application of regulation 55 in relation to certain network operators 95
Electrical work on or near energised electrical installations 96
Part 6 — Miscellaneous
Register of licence holders 98
Employers to keep record of licence holders employed 98
Board may require holder to produce licence etc. for inspection 99
Offences related to licensing 99
Replacement licence or permit document 100
Licence etc. to be returned to Board if suspended etc. 100
Unsafe electrical installations, electrical workers to report 101
Electrical accidents to be reported 102
63A. Interfering with scene of electrical accident 103
63B. Delegation by Director to Board 104
Fees 104
64A. Refund of registration fee 104
General offence and penalty 105
65A. Offences by members of firms 105
Saving and transitional provisions 106
Schedule 1 — Fees
Schedule 2 — Standards for electrical work
Notes
Compilation table 114
Other notes 119
Defined terms
Electricity Act 1945
Electricity (Licensing) Regulations 1991
Part 1 — Preliminary
1. Citation
These regulations may be cited as the Electricity (Licensing) Regulations 1991.
2. Commencement
These regulations shall come into operation on 1 November 1991.
3. Terms used
(1) In these regulations, unless the contrary intention appears —
apprentice has the meaning given in the Vocational Education and Training Act 1996 section 60A;
AS, followed by a designation, means the Australian Standard having that designation published by Standards Australia, as amended from time to time;
AS/NZS, followed by a designation, means the Australian/New Zealand Standard having that designation jointly published by Standards Australia and the Standards Council of New Zealand, as amended from time to time;
Australian/New Zealand Wiring Rules means AS/NZS 3000:2018 Electrical installations (known as the Australian/New Zealand Wiring Rules);
Board means the Electrical Licensing Board established under regulation 4;
chairperson means the person appointed under regulation 5(1)(a) to be chairperson of the Board;
contact details, of a person who holds a licence or a permit, means the residential address, address of the principal place of business, postal address, telephone number and email address of the person;
copy, in relation to a notice of completion or electrical safety certificate, means a hard copy or an electronic copy;
de‑energised, in relation to a part of an electrical installation, means separated from each supply of electricity to the part in such a way that the part cannot be inadvertently energised;
department means the department of the Public Service principally assisting in the administration of the Act;
electrical appliance means a device in which electrical energy is consumed or substantially changed in character by conversion into heat, sound, motion, light or otherwise;
electrical contractor means a person who carries on business as an electrician but does not include an electrician when acting in the capacity of an employee of an electrical contractor;
electrical contractor’s licence means an electrical contractor’s licence issued under Part 4;
electrical equipment includes any component or part of an electrical installation;
electrical fitting work means the work of making, maintaining, repairing, altering, assembling, dismantling, connecting or testing electrical machines, electrical appliances, electrical instruments or other electrical equipment, and includes electrical installing work if that work is assembling, maintaining or altering the wiring between electrical components in plant or machinery;
electrical installation means —
(a) an installation (as defined in the Electricity Act 1945 section 5(1)); or
(b) the network of an exempt operator, other than an exempt operator that is a major network operator; or
(c) the network of a person who is a network operator under the Electricity (Network Safety) Regulations 2015 regulation 4(1)(h);
electrical installing work means electrical work that consists of assembling and fixing in place, altering or adding to any electrical installation or maintaining, removing or connecting to fixed wiring, any electrical equipment;
electrical work has the meaning given in regulation 4A;
electrical worker means an individual who carries out electrical work;
electrical worker’s licence means a licence issued under Part 3;
electrician means an electrical worker who is authorised by a licence to carry out electrical installing work and electrical fitting work;
energised, in relation to a part of an electrical installation, means connected to a supply of electricity to the part, whether or not electricity is flowing through any part of that part;
executive officer means the person holding or acting in the office of Executive Officer to the Board;
in‑house electrical installing work has the meaning given by regulation 37(2) and (3);
in‑house electrical installing work licence means a licence to carry out in‑house electrical installing work;
licence means a licence under these regulations and when used in Part 3 means an electrical worker’s licence and when used in Part 4 means an electrical contractor’s licence or an in‑house electrical installing work licence;
licensed electrical worker means the holder of an electrical worker’s licence or the holder of a permit under Part 3;
live, in relation to any wire or other object, means having, under normal conditions of operation, a potential difference between that wire or other object and earth, and any metal that is deemed by the Australian/New Zealand Wiring Rules to be a live part for the purposes of that standard shall be regarded as live for the purposes of these regulations;
main switchboard has the meaning given in the Australian/New Zealand Wiring Rules clause 1.4.122;
maintenance work means repairing defective electrical equipment or replacing electrical equipment with electrical equipment having an equal or substantially similar engineering specification;
major network operator means a person who is a network operator under the Electricity (Network Safety) Regulations 2015 regulation 4(1)(a), (b), (c), (d), (e), (f) or (g);
mine has the meaning given in the Work Health and Safety (Mines) Regulations 2022 regulation 5A;
network has the meaning given in the Electricity (Network Safety) Regulations 2015 regulation 3(1);
nominee, in relation to a licence under Part 4, means a person for the time being nominated for the purposes of regulation 36(1), (2) or (3) or 37(1) in respect of that licence;
notifiable work means electrical installing work other than —
(a) maintenance work, unless that work requires the disconnection and reconnection of the supply of electricity to the electrical installation concerned or the replacement of service apparatus; or
(b) the addition or alteration of 1 final sub‑circuit including the addition or alteration of its protective device; or
(c) the alteration of 1 or more final sub‑circuits;
permit means a permit under Part 3;
prescribed policy of insurance means the policy of insurance required to be held under regulation 36(1)(c), (2)(c) and (3)(c);
pressure means the difference in effective electrical potential measured in volts normally existing between conductors and between conductors and the earth;
private generating plant has the meaning given in regulation 4AA;
Regional Power Corporation means the body established by the Electricity Corporations Act 2005 section 4(1)(d);
relevant network operator means —
(a) for an electrical installation that is, or is to be, supplied with electricity by a network operator — the network operator; or
(b) for an electrical installation that is not, and is not to be, supplied with electricity by a network operator — the Director;
transportable structure means a structure that can be moved from a site to another site and on which notifiable work may be carried out;
working days does not include Saturdays, Sundays or public holidays.
[(2) deleted]
[Regulation 3 amended: Gazette 23 Dec 1994 p. 7134; 6 Sep 1996 p. 4410‑11; 24 Mar 2000 p. 1639‑40; 19 Apr 2005 p. 1296; 31 Dec 2007 p. 6492‑3, 6537 and 6538‑9; 10 May 2011 p. 1667; 17 May 2011 p. 1813‑14; 13 Apr 2012 p. 1652; 2 May 2017 p. 2292; 14 Nov 2017 p. 5598; 7 Jun 2018 p. 1815; 2 Oct 2018 p. 3793; SL 2020/196 r. 22; SL 2021/86 r. 28; SL 2022/26 r. 9; SL 2022/36 r. 4; SL 2022/115 r. 8.]
4A. Term used: electrical work
(1) In these regulations —
electrical work means —
(a) work —
(i) on electrical machines or instruments; or
(ii) on an electrical installation; or
(iii) on electrical appliances or equipment,
to which electricity is supplied or intended to be supplied at a nominal pressure exceeding 50 volts alternating current or 120 volts ripple free direct current; and
(b) work comprising an assessment of an electrical installation to ensure that the installation and any work done on the installation complies with the requirements of these regulations.
(1A) However electrical work does not include work on components of the propulsion system of a motor vehicle, as defined in the Road Traffic (Administration) Act 2008 section 4, that is propelled wholly or partly by electricity.
(2) For the purposes of the definition of electrical work it is immaterial —
(a) whether or not the thing on or in relation to which the work is performed is part of, or is connected to or to be connected to, any transmission or distribution works or private generating plant; and
(b) where work is performed on or in relation to any appliance, whether or not electricity is supplied or may be supplied to the appliance through an electric plug socket or socket outlet.
[Regulation 4A inserted: Gazette 10 May 2011 p. 1667; amended: Gazette 13 Apr 2012 p. 1652; 8 Jan 2015 p. 97; 2 May 2017 p. 2293 and 2302.]
4AA. Term used: private generating plant
(1) In these regulations —
private generating plant means generating works that are for the generation of electricity at a nominal pressure exceeding 50 volts alternating current or 120 volts ripple free direct current including —
(a) generating works that are for the self‑propulsion or other motivation of mobile equipment; and
(b) subject to subregulation (2)(b), generating works constructed or operated under an exemption order made under the Electricity Industry Act 2004 section 8(1); and
(c) generating works forming an electrical installation of a consumer (such as fixed generating plant, a mobile or portable ge
This is an opening excerpt, not the complete document.