Electrical Safety Regulation 2013
sec.232Telling distribution entity of need for change to metering
Start here
Get a plain-English read of sec.232
Turn the raw legal text into a practical explanation grounded in Electrical Safety Regulation 2013.
sec.232 Telling distribution entity of need for change to metering
This section applies if, because of the performance of electrical work on an electrical installation, there is a need to install or change metering, control apparatus or other ancillary equipment forming part of the works of a distribution entity. The person who performed the electrical work must, as soon as practicable after the completion of the electrical work, tell the distribution entity, in a way approved by the distribution entity, of the need for the installation or change. Maximum penalty—40 penalty units. In giving the advice, the person must certify that the electrical work has been completed. (sec.232-ssec.1) This section applies if, because of the performance of electrical work on an electrical installation, there is a need to install or change metering, control apparatus or other ancillary equipment forming part of the works of a distribution entity. (sec.232-ssec.2) The person who performed the electrical work must, as soon as practicable after the completion of the electrical work, tell the distribution entity, in a way approved by the distribution entity, of the need for the installation or change. Maximum penalty—40 penalty units. (sec.232-ssec.3) In giving the advice, the person must certify that the electrical work has been completed.