This instrument sets the local planning rules for land in the Dungog area: it defines zones, what uses are permitted or prohibited, when development consent or exemptions apply, subdivision rules, and environmental, heritage and watercourse controls. It applies to land shown on the LEP maps and repeals earlier local plans. It affects landowners, developers, the Council (the consent authority (cl 1.6)) and relevant State agencies (cl 1.9). Landowners bear compliance and consent costs; the Council makes approval decisions and imposes conditions (see cl 2.6, cl 5.10, cl 6.6).
This instrument is a local environmental plan for the Dungog local government area that sets the statutory land-use framework for development consent, exempt development and complying development on the land to which it applies (the Plan). It commenced on 1 June 2014 (cl 1.1AA) and repealed the previous Dungog Local Environmental Plan 2006 (cl 1.8). The Plan identifies the applicable zoning, the Land Use Table, maps (Land Zoning Map, Lot Size Map, Heritage Map, Riparian Lands and Watercourses Map, Drinking Water Catchment Map, Acid Sulfate Soils Map, Williams River Catchment Map and others) and schedules that together govern what may be done on particular parcels of land (cls 1.3, 1.7, 2.1-2.3).
Mechanically, the Plan does the following:
Declares zones and their objectives and translates permitted uses into three categories in the Land Use Table: development that may be carried out without consent, development that may be carried out only with development consent, and prohibited development (cl 2.3; Land Use Table).
Requires development consent for specified categories including subdivision (cl 2.6), demolition (cl 2.7), and for development on certain mapped or heritage-affected land (for example cl 5.10 about heritage items).
Identifies exempt development (Schedule 2) and complying development (Schedule 3) rules and limits (cls 3.1-3.3).
Imposes principal development standards and subdivision rules, notably minimum lot sizes tied to the Lot Size Map and special provisions for community title and split-zone lots (cl 4.1, cl 4.1AA, cl 4.1A).
Sets local provisions addressing flood planning (cl 5.21), heritage (cl 5.10 and Schedule 5), aquaculture (cl 5.19 and Schedule 6), riparian land (cl 6.6), acid sulfate soils (cl 6.1) and other site-specific controls (Part 6).
Current sections
Direct links to the current provisions in Dungog Local Environmental Plan 2014.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Airstrips; Animal boarding or training establishments; Aquaculture; Boat building and repair facilities; Boat launching ramps; Boat sheds; Camping grounds; Car parks; Caravan parks; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Community facilities; Correctional centres; Crematoria; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Extractive industries; Farm buildings; Flood mitigation works; Forestry; Freight transport facilities; Function centres; Group homes; Health services facilities; Helipads; Heliports; Highway service centres; Home-based child care; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Kiosks; Landscaping material supplies; Marinas; Moorings; Open cut mining; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Restaurants or cafes; Rural industries; Rural supplies; Rural workers’ dwellings; Signage; Timber yards; Tourist and visitor accommodation; Transport depots; Truck depots; Veterinary hospitals; Water recreation structures
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Acid sulfate soils
6 Acid sulfate soils
6.1 Acid sulfate soils
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Dungog Local Environmental Plan 2014.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on 1 June 2014 and is required to be published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Dungog in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to protect rural lands, natural resources, and items and areas of heritage significance,
(b) to manage development to benefit the community,
(c) to promote the principles of ecologically sustainable development and sustainable water management, and to recognise the cumulative impacts of climate change,
(d) to protect, enhance and provide for biological diversity, including native threatened species, populations and ecological communities, by long term management and by identifying and protecting habitat corridors and links throughout Dungog,
(e) to encourage a mix of housing to meet the needs of the community,
(f) to protect agricultural lands by preventing adverse impacts from non-agricultural land uses,
(g) to strengthen retail, agricultural and tourism opportunities.
Confirms the Council is the consent authority subject to the Act (cl 1.6) and that State environmental planning policies (SEPPs) prevail where they do so under the Act (cl 1.9).
The Plan also contains locally targeted departures from general state practice. Examples include the power temporarily to ignore private covenants to enable development consistent with the Plan (cl 1.9A) subject to enumerated exceptions, and a provision that prevents a consent authority from refusing licensed-premises development on certain music- or dance-related grounds (cl 5.20). It preserves transitional arrangements for development applications made before commencement (cl 1.8A). The Plan does not itself specify monetary penalties; enforcement mechanisms and penalties derive from the Environmental Planning and Assessment Act and the associated regulations rather than from this instrument alone (the Plan repeatedly references “the Act”).
Readers should treat statements of policy aims in cl 1.2 as the Plan’s declared purpose, not as legal limits; many operative rules require the consent authority to be “satisfied” of particular matters before grant of consent, so the Plan creates discretionary decision points tied to mapped data and evidentiary requirements. Where the Plan cross-refers to other Acts (for example the Heritage Act 1977, Rural Fires Act 1997, Fisheries Management Act 1994) those Acts may impose further licences or approvals not substituted by this Plan (see cl 3.1(5) note and cl 5.12(1)).
Main concepts
The Plan organises land use by zone, by mapped overlays, and by use-category rules. The main concepts that structure decision-making under the Plan are zoning and objectives, mapped controls, consent categories (exempt, complying, development with consent, prohibited), development standards and local provisions.
Zoning and objectives
The Plan lists zones (cl 2.1) such as RU1 Primary Production, R1 General Residential, E4 General Industrial, MU1 Mixed Use, RE1 Public Recreation, C3 Environmental Management and W1 Natural Waterways. Each zone has stated objectives (for example the RU1 objectives at the Land Use Table prefatory text) which the consent authority must regard when determining applications (cl 2.3(2)). The Land Use Table assigns permitted without consent, permitted with consent and prohibited uses for each zone.
Maps and spatial controls
Named maps are adopted as part of the Plan (cl 1.7). The Plan’s operative controls are frequently expressed as references to maps: Land Zoning Map (cl 2.2), Lot Size Map (cl 4.1), Heritage Map (Schedule 5 references), Riparian Lands and Watercourses Map (cl 6.6), Acid Sulfate Soils Map (cl 6.1), Drinking Water Catchment Map (cl 6.5) and others. Where a clause requires that development must comply with a minimum lot size or sit outside mapped environmentally sensitive areas, the Lot Size Map or other map is the operative source of the rule (cl 4.1, cl 3.3).
Consent categories and their tests
Exempt development is defined by Schedule 2 and by cl 3.1; exempt development must meet Building Code of Australia requirements, not be designated development and not affect State heritage items (cl 3.1(2)-(3)). Complying development follows Schedule 3 and the relevant deemed-to-satisfy/BCA requirements and other statutory conditions (cl 3.2). Development requiring consent must satisfy a mix of objective tests (for example flood compatibility in cl 5.21) and specific matters for particular uses (for example aquaculture in cl 5.19 and Schedule 6).
Development standards and exceptions
Minimum subdivision lot sizes are anchored to the Lot Size Map and are mandatory unless a clause provides an exception (cl 4.1). The Plan contains detailed local exceptions: community title minimums (cl 4.1AA), split-zone subdivisional exceptions (cl 4.1A), lot boundary adjustments in RU1 (cl 4.1B), and rural subdivision flexibility (cl 4.2). Clause 4.6 allows contravention of development standards in limited circumstances, subject to the consent authority being satisfied of certain planning grounds and subject to express exclusions (cl 4.6(2)-(3), (8)). The Plan expressly excludes from that flexibility certain standards (e.g. standards for complying development, BASIX-related standards and clause 4.1A) (cl 4.6(8)).
Local overlay provisions and site-specific controls
Heritage: cl 5.10 requires consent for demolition, alterations and subdivision affecting heritage items and imposes consultation/notification duties (cls 5.10(2)-(9)). Schedule 5 lists the heritage items and conservation areas. The consent authority may require heritage management documents and conservation management plans (cl 5.10(5)-(6)).
Flooding: cl 5.21 requires consent authorities to satisfy themselves that development in the flood planning area is compatible with flood function, will not increase flood risk elsewhere and incorporates life-safety and evacuation measures; the clause references the Considering Flooding Guideline and Flood Risk Management Manual (cl 5.21(1)-(5)).
Aquaculture: cl 5.19 plus Schedule 6 set minimum site-location and operational requirements, exclude certain conservation areas (Schedule 6 Div 1 and 2) and differentiate between intensive and extensive pond/tank operations (cl 5.19, Sch 6).
Environmental overlays: acid sulfate soils (cl 6.1), riparian land (cl 6.6), drinking water catchments (cl 6.5), stormwater management (cl 6.4) and earthworks (cl 6.2) impose additional consent and assessment requirements.
Decision-makers and scope
The consent authority is the Council subject to the Act (cl 1.6). The Plan repeatedly empowers the consent authority to make judgement calls based on satisfaction of specified tests (for example cl 2.8(3), cl 5.13(3), cl 6.7(3)), creating structured discretion rather than absolute entitlements.
Cross-references and limits
The Plan operates subject to SEPPs that prevail under the Act (cl 1.9(1)). The Plan also highlights that other Acts and regulations (Heritage Act, Rural Fires Act, Fisheries Management Act, Local Government Act, Land Acquisition (Just Terms) Act) impose parallel or additional constraints and processes. Where the Plan is silent about penalties or compliance fines, the enforcement framework provided by the Act and the regulations applies.
In short, the Plan translates spatial mapping and local objectives into a zone-by-zone rule set, maps specific land, imposes additional overlay tests and creates a decision-making framework that is principally administered by the Council but subject to State policies and other statutory regimes.
Who it affects
The Plan affects a defined set of actors in three principal categories: landowners and developers, the consent authority (Council) and State/public authorities with acquisition or regulatory powers. It also affects neighbours, Aboriginal communities and other stakeholders whose interests are protected by specific clauses (heritage, riparian and drinking water catchment provisions).
Landowners and developers
All owners and prospective purchasers of land within the Plan area are directly affected because zone permissibility, minimum lot size, and overlay constraints determine what uses are permitted without consent, which require consent and which are prohibited (cl 2.3; Land Use Table; cl 4.1). Specific land parcels are subject to bespoke provisions in Schedule 1 (for example Lots at Common Road, Glen Martin Road and 656 Gresford Road and a temporary single service station permission at 68 Grey Street) giving those owners or prospective buyers rights or constraints that other landowners do not have (Sch 1). Developers must check the Lot Size Map and other maps before preparing subdivision or development applications (cl 4.1; cl 1.7).
Consent authority and local government (Council)
The Council is the consent authority subject to the Act (cl 1.6). The Plan assigns to Council the responsibility to determine development applications, to be “satisfied” of matters specified by the Plan before granting consent (for example cl 5.21 flood matters; cl 5.10 heritage matters; cl 6.6 riparian issues) and to keep records where standards are contravened (cl 4.6(4)). The Plan also allows the Council to classify or reclassify public land as operational or community land in accordance with the Local Government Act (cl 5.2), and to be the State authority for owner-initiated acquisition of some public lands (cl 5.1(2) table).
State agencies and acquiring authorities
The Plan identifies the relevant State acquisition authorities for particular reservation types (cl 5.1(2) table), for example Transport for NSW for classified roads and the NPWS Minister for national park land. It expressly preserves the rights or interests of public authorities under registered instruments (cl 1.9A(3)). SEPPs prevail where they do so under the Act (cl 1.9(1)), so State agencies implementing SEPPs or State infrastructure policies affect development outcomes.
Aboriginal communities and heritage stakeholders
The Plan imposes notification and consultation obligations on the consent authority in relation to Aboriginal places of heritage significance and Aboriginal objects (cl 5.10(8)). The consent authority must notify local Aboriginal communities and take responses into account in the specified timeframes.
Neighbours and the public
The Plan constrains development in ways designed to protect neighbours’ amenity: flood planning (cl 5.21), controls on intensive livestock agriculture with buffers and thresholds (cl 5.18), neighborhood shop size limits and kiosk limits (cl 5.4), and rules under cl 6.2 on earthworks that require consideration of impact on adjoining properties. The Plan preserves that public notices and public access to maps (cl 1.7 note) are required, and some processes require notification of statutory bodies (cl 5.10(7), (9)).
Commercial operators and specific industries
Operators in aquaculture, intensive livestock, eco-tourism and licensed premises are specifically affected. Aquaculture is subject to cl 5.19 and Schedule 6 operational and site-location requirements. Intensive livestock agriculture has thresholds below which consent is not required subject to location criteria (cl 5.18(4)-(5)). Licensed premises (liquor licensed operations) get a procedural protection under cl 5.20 preventing refusal on the basis of music or related features if noise can be managed.
Who pays and who decides
The Plan’s practical costs fall primarily on landowners and developers through compliance, assessment, design mitigation and the cost of preparing and lodging development applications and any required technical reports (heritage impact statements, flood risk assessments, acid sulfate soils management plans: see cl 6.1(3), cl 5.21(3)). The Council exercises decision-making authority and must apply the Plan’s tests; State agencies influence outcomes via SEPPs and other statutes referenced. The Plan does not specify fees or penalties; those are found in the Act and regulations.
Concentrated vs diffuse effects
The Plan contains provisions that create concentrated benefits for specific parcels (Schedule 1 additional permitted uses) and concentrated constraints for owners of heritage-listed land (Schedule 5). Many costs are diffuse: adherence to flood or riparian controls demands more conservative designs that marginally affect development yields over many sites. The Plan’s map-driven approach means site-specific outcomes can differ markedly even on blocks separated by a mapped boundary.
Key duties and rights
The Plan creates a mixture of mandatory duties, discretionary duties and rights linked to mapped constraints. The primary operative duties relate to obtaining consent when required, complying with standards where mapped, preparing particular technical documents for constrained land and observing use-based limits.
Duties to obtain consent and to comply with mapped standards
Except where the Plan permits development without consent, development consent is required for most subdivision, demolition, and many other forms of development (cl 2.6, cl 2.7, Land Use Table). Clause 4.1 mandates that any lot resulting from subdivision must not be less than the minimum size on the Lot Size Map unless an exception applies (cl 4.1(3)). Where the Plan requires that development be “designed, sited and managed” to avoid adverse environmental effects (for example cl 6.6(4) riparian land), the consent authority must be satisfied of that before granting consent.
Specific preparatory and evidentiary duties
Acid sulfate soils: cl 6.1(3) requires an acid sulfate soils management plan in accordance with the Acid Sulfate Soils Manual before consent is granted for works on mapped classes; however a preliminary assessment may qualify works as not requiring the full plan if confirmed in writing by the consent authority (cl 6.1(4)). The Plan permits emergency, routine maintenance and minor public authority works without consent in specified cases (cl 6.1(5)).
Heritage: cl 5.10(5) allows the consent authority to require a heritage management document and cl 5.10(6) permits requiring a heritage conservation management plan for significant change. The consent authority must consider the effect of proposed development on heritage significance before granting consent (cl 5.10(4)).
Flood planning: cl 5.21 requires the consent authority to be satisfied that development in the flood planning area complies with a set of flood-compatibility tests and to consider climate-change projections and evacutation capacity (cl 5.21(2)-(3)).
Restrictions and prohibitions
The Land Use Table specifies prohibited development per zone (see Land Use Table entries). Canal estate development is expressly prohibited in the Plan and the Plan defines it tightly (cl 2.9). Clause 4.6(8) identifies certain development standards that cannot be overridden by the Plan’s exceptions, thereby restricting the consent authority’s capacity to approve contraventions of those standards.
Rights and entitlements conferred by the Plan
Schedule 1 confers additional permitted uses for particular lots, creating lawful use rights for those parcels (Sch 1). Where development is permitted without consent in the Land Use Table or under Schedule 2 as exempt development, a proponent may carry out the development subject to the instrument’s limits and other applicable statutory approvals (cl 3.1 note; Schedule 2 note).
Clause 1.9A provides landowners with a statutory limitation on private covenants: private covenants or agreements that would prevent carrying out development in accordance with the Plan do not apply to the extent necessary to allow the development, subject to a list of exceptions (cl 1.9A(1)-(3)). This gives developers an enforceable right to proceed despite private restrictions except where the covenant arises from specified instruments or the Council itself.
Discretionary duties of the consent authority
The Plan frequently requires the consent authority to be “satisfied” of particular matters before grant of consent (examples include cl 2.8(3) on temporary uses, cl 5.13(3) on eco-tourist facilities, cl 6.7(3) on rural workers’ dwellings). These are fact-bound discretionary tests that the Council must assess, sometimes after receiving technical reports. Clause 4.6(3) requires the consent authority to keep a record when assessing contraventions of development standards.
Interplay with other statutory duties
The Plan repeatedly cross-references other Acts and policies; developers must comply with approvals or licences under other Acts even where the Plan permits the development (see cl 3.1(5) note and cl 5.12(1)). For example, works affecting Aboriginal objects will still require compliance with provisions of the National Parks and Wildlife Act and other statutes.
Procedural duties tied to notification
Heritage and archaeological processes impose notice obligations to the Heritage Council and to local Aboriginal communities and give those bodies 28 days to respond in relevant circumstances (cl 5.10(7)-(9)).
In practice, duties fall on proponents to check maps, prepare the technical material the Plan requires, and obtain consent where the Plan demands it; the consent authority (Council) has the duty to apply the Plan’s tests and keep records where standards are contravened (cl 4.6(4)). The Plan itself does not set administrative penalties; enforcement and sanctions come from the Act and its regulations.
Penalties and enforcement
The Plan does not contain explicit penalty schedules or bespoke enforcement provisions. It operates within the enforcement framework established in the Environmental Planning and Assessment Act and the regulations made under that Act. The Plan therefore relies on the Act for the legal machinery of enforcement, sanctions and penalties for non-compliance; those penalties and compliance tools are not reproduced in this instrument.
What this Plan does provide that affects enforcement and compliance:
Mandatory consent requirements and mapped prohibitions create the legal basis for enforcement action under the Act where development occurs without required consent, or in breach of consent conditions (cl 2.6, cl 2.7, Land Use Table).
Records and transparency: the Plan requires the consent authority to keep a record of the assessment where a development standard is contravened pursuant to cl 4.6(3)-(4). That creates an evidentiary trace that can be relevant in enforcement or review contexts.
Notifications and referrals: for heritage and archaeological matters the Plan requires the consent authority to notify and consider responses from the Heritage Council (cl 5.10(7), (9)) and to notify Aboriginal communities (cl 5.10(8)). Failure to follow required procedural steps may be relevant in judicial review or merits review settings under the Act.
Specific exemptions from consent for certain public-authority works (cl 6.1(5)) and express preservation of Crown authority for State infrastructure (cl 5.12(1)-(2)) mean enforcement against public-authority works will be constrained by those clauses.
The Plan contains explicit restrictions on the capacity of consent authorities to refuse certain licensed-premises applications on cultural grounds (cl 5.20). That is not an enforcement provision but is a procedural/merits-limiting rule that narrows a ground on which consent can be refused; enforcement of noise standards remains possible where noise cannot be managed and minimised to an acceptable level (cl 5.20(2)).
Practical enforcement implications and risks
Because the Plan defers to the Act for enforcement, practitioners must consult the Act and EPI Regulation for remedies and penalties. The Plan’s many “satisfied” tests are discretionary; inconsistent or procedurally deficient decisions by the consent authority may be subject to merits review or judicial review under the Act’s review mechanisms. The Plan itself does not create a separate civil penalty scheme.
Administrative instruments and compliance monitoring
The Plan requires certain technical documents (acid sulfate soils management plan, heritage management documents, flood and stormwater assessments). Failure to obtain or lodge required documents, or to comply with consent conditions derived from them, is the usual basis for enforcement action under the Act rather than a Plan-specific sanction.
In short, enforcement of the Plan is exercised through the general statutory regime the Plan operates within. The Plan creates the substantive obligations and mapped limits; the Act supplies the enforcement tools, penalties and processes, which practitioners must consult in parallel with this instrument.
How it interacts with other laws
The Plan is an environmental planning instrument operating under the Environmental Planning and Assessment framework and interacts with a number of State statutes, SEPPs, local Acts and sectoral regulatory regimes which the text explicitly references. These interactions determine which laws prevail, which approvals are in addition to Plan consent, and when other statutory permissions are required.
SEPPs and precedence
The Plan is subject to any State environmental planning policy that prevails over it under the Act (cl 1.9(1)). Practitioners should therefore check relevant SEPPs such as the State housing, transport and resilience SEPPs referenced in the Land Use Table notes. Where a SEPP applies and has operation over the Plan, the SEPP will displace inconsistent Plan provisions to the extent of inconsistency.
Other NSW statutes and statutory instruments referenced
Heritage Act 1977: The Plan defers to the Heritage Act for items on the State Heritage Register and interim heritage orders. The Plan requires consent for certain works affecting heritage items and requires notification of the Heritage Council for specified heritage applications (cl 5.10(2), (7), (9)). The Plan does not replace the Heritage Act approval regime.
Crown Land Management Act 2016 and Nature Conservation Trust Act 2001: Clause 1.9A(2) exempts certain instruments from the Plan’s suspension-of-covenants effect where the instrument is a “relevant instrument” or Trust agreement under those Acts.
Land Acquisition (Just Terms Compensation) Act 1991: Clause 5.1 identifies relevant State authorities for owner-initiated acquisition procedures and references that Act for acquisition timing and hardship provisions.
Local Government Act 1993: Classifying and reclassifying public land as operational or community land (cl 5.2) is carried out in accordance with the Local Government Act; the Plan notes the need for Governor approval for some discharges of trusts (cl 5.2 note).
Rural Fires Act 1997: The Plan authorises bush fire hazard reduction work as permitted without consent if authorised by that Act (cl 5.11) and notes the Rural Fires Act’s additional planning provisions.
Fisheries Management Act 1994 and related aquaculture regulation: Aquaculture development (cl 5.19 and Sch 6) is required to be consistent with aquaculture industry development plans issued under the Fisheries Management Act, and Schedule 6 requires specific operational standards and excludes certain conservation zones.
Building Code of Australia and BASIX: Exempt and complying development sections require compliance with the Building Code of Australia and, where BASIX commitments exist, clause 4.6(8) excludes BASIX-related standards from the clause that allows contravening development standards.
Operational interface and approvals
The Plan repeatedly notes that exempt development under the Plan is not exempt from approvals under other Acts (Schedule 2 note; cl 3.1(5) note). That means a development that is exempt under this LEP may nonetheless require licences or permits under fisheries, heritage, Crown land, environmental protection and other sectoral laws.
Maps, State guidelines and technical manuals
The Plan directs interpreters to various technical resources: Standard technical requirements for LEP maps, the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 1.7 note; cl 5.21(4)-(5)). Those procedural and technical documents provide inputs for satisfying Plan tests and are part of the operational statutory landscape.
Limitations on Plan discretion posed by other laws
Clause 1.9A(3) explicitly confirms that the Plan’s suspension of covenants does not affect public authorities’ rights under registered instruments, limiting the Plan’s power to override encumbrances that affect public authorities. Clause 4.6(8) excludes certain development standards from the Plan’s exceptions, such as BASIX-related standards, demonstrating how overlapping statutory regimes can restrict local discretion.
In practice, the Plan must be read in conjunction with:
The Environmental Planning and Assessment Act and its regulations for consenting, enforcement and review mechanisms.
Relevant SEPPs that may prevail over the Plan.
Sectoral statutes and licences (Heritage Act, Fisheries Management Act, Crown land legislation, Rural Fires Act, Local Government Act, Land Acquisition Act).
Technical guidelines and manuals referenced by the Plan.
Practitioners must therefore layer the Plan’s requirements on top of these other statutory settings; the Plan does not operate in isolation.
Amendment history
The Plan records a number of formal amendments and replacement of preceding instruments. Key items from the instrument’s amendment notes and commencement statement are listed here with the clause references the Plan itself supplies.
Commencement and repeal
The Plan commenced on 1 June 2014 and is required to be published on the NSW legislation website (cl 1.1AA).
All local environmental plans applying to the land were repealed on commencement; the Plan expressly repealed the Dungog Local Environmental Plan 2006 (cl 1.8).
Post‑commencement amendments recorded in the instrument
Clause 1.8A (savings provision for development applications) was inserted by Am 2019 (621), Sch 5[1] (cl 1.8A).
Clause 1.9A (suspension of covenants, agreements and instruments) was amended and carried the Governor’s approval under s 3.16 of the Act; the amendment references Am 2019 (621), Sch 5[2]-[4] (cl 1.9A).
The list of land use zones in cl 2.1 was amended by Am 2022 (830), Sch 1.10[1].
Land Use Table amendments span multiple years, as indicated by the Plan’s note: Am 2017 (493), Sch 1.1[1]; 2018 (488), Sch 1.1[1]; 2019 (137), Sch 6[1]; 2022 (830), Sch 1.10[2] [2A] (ins 2023 (82), Sch 1.4[2]); 2023 (458), Sch 2.29[1] [2]. These annotations indicate iterative updates to permitted uses and zone entries in the Land Use Table across those years.
Schedule 1 (additional permitted uses) was amended across 2022: sch 1 notes Am 2022 (16), cl 4; 2022 (196), cl 4; 2022 (830), Sch 1.10[3].
Clause 4.1AA (minimum subdivision lot size for community title schemes) was added by Am 2022 (830), Sch 1.10[3][4].
Clause 4.1A (exceptions for split zones) is shown as amended 2022 (830), Sch 1.10[3][5].
Clause 4.1B (lot boundary adjustments in RU1) is present without an amendment note here; clause 4.2A (erection of dwelling houses and dual occupancies in certain rural and conservation zones) carries amendment notes Am 2019 (529), cl 4; 2022 (597), cl 4(1)-(5).
Clauses related to strata scheme minimum lot sizes (4.2B) were amended 2022 (830), Sch 1.10[3][4][6].
Clause 4.6 records repeals and amendments, and explicitly excludes specified standards from variation; that clause contains historical amendment markers (some subclauses repealed) but the Plan text shows the current operative exclusions (cl 4.6(6)-(8)).
Clause 6.3 was amended in 2019 and subsequently repealed (cl 6.3: Am 2019 (172), cl 5. Rep 2021 (225), Sch 1).
Clause 6.4 (stormwater management) was amended Am 2022 (830), Sch 1.10[7].
Multiple other clauses carry amending annotations in the text provided, indicating piecemeal updates over the Plan’s life.
Temporal clauses and sunset
Schedule 1 clause 5 authorising a single service station at 68 Grey Street is time-limited and is repealed on 15 April 2027 (Sch 1 cl 5(3)). That is a clear example of a time-limited additional permitted use that will expire without further amendment.
How to read the amendment annotations
The Plan embeds standard parliamentary amendment references (for example Am 2019 (621), Sch 5[1]) which indicate the amending instrument and schedule number. Users requiring the precise amending texts should consult the amending instruments and the consolidated or current version available on the NSW legislation website, as the Plan’s notes identify amendment events but do not reproduce the full amendment instruments.
This instrument therefore shows iterative local updates between 2014 and the early 2020s. The Plan’s operation has been modified on multiple occasions to refine zone lists, subdivision rules, heritage listings, local development controls and special local permissions.
Litigation history
The Plan itself does not include any case citations or a litigation history in its text. The document supplied names no judicial decisions and lists no binding administrative determinations. Where the Plan requires a consent authority to keep records, make referrals or be “satisfied” of particular matters (for example cl 4.6(4), cl 5.10(7)-(9)), those procedural steps create potential grounds for review or appeal under the Environmental Planning and Assessment Act and associated review mechanisms, but the instrument does not record any instances of such proceedings.
Practical implications for practitioners
Because the Plan is silent on litigation history, practitioners must search the case law, merits and judicial review decisions separately to identify any decisions that have interpreted or applied these specific LEP clauses. The Plan’s own text should be treated as the primary source of statutory obligations; any judicial interpretation is additional and must be verified against reported decisions (none are cited in the Plan itself).
If you need a targeted search for decisions referring to particular clauses of the Dungog LEP (for example disputes about cl 4.6 contraventions, cl 5.10 heritage approvals, or cl 5.21 flood compatibility), that will require case-law research external to this instrument.
Gotchas
The Plan contains several technical and procedural features that commonly create traps for practitioners, developers and consent authorities. These are not evaluative judgements but operational pitfalls rooted in the Plan’s wording and cross-references.
Maps drive outcomes; check the right map and version
Many operative rules are map-dependent: Lot Size Map (cl 4.1), Land Zoning Map (cl 2.2), Heritage Map (Schedule 5), Riparian Lands and Watercourses Map (cl 6.6), Acid Sulfate Soils Map (cl 6.1). A developer relying on a verbal or historical understanding of zoning or lot-size risks being caught by a mapped constraint. Clause 1.7 makes clear that maps as amended or replaced and approved by the local plan-making authority are operative; always refer to the current on-line maps published on the Planning Portal.
Transitional protection for pending applications can lock in the old rules
If a development application was lodged before commencement and not finally determined, cl 1.8A requires determination as if this Plan had not commenced. That can produce outcomes inconsistent with current zoning expectations, and clients may mistakenly rely on the Plan’s new permissibilities only to find an application must be decided under the previous instrument.
Suspension of private covenants is limited and conditional
Clause 1.9A suspends private covenants to the extent necessary to allow development under the Plan but expressly excludes covenants imposed by the Council and a list of statutory conservation instruments (cl 1.9A(2)). It also does not affect rights of public authorities under registered instruments (cl 1.9A(3)). Practitioners should not assume that every private encumbrance will be overridden.
Exempt and complying development exclusions are extensive
Exempt/compliant pathways are precluded on listed environmentally sensitive areas (cl 3.3). Exempt development must meet BCA standards and cannot be on State Heritage Register items (cl 3.1(3)-(4)). A superficially “minor” building act may still require consent because of mapped sensitivity.
Clause 4.6 exceptions are limited and recorded
Although clause 4.6 permits contravention of development standards in narrowly defined circumstances, it expressly excludes certain development standards from this flexibility (cl 4.6(8)), including standards for complying development, BASIX-related commitments and clause 4.1A. Applicants must prepare the document required by the EP&A Regulation when seeking to rely on 4.6(3) (cl 4.6(3) note); failure to follow the Regulation’s documentary requirements is a procedural risk.
Heritage procedural steps are mandatory and time‑sensitive
For archaeological sites and nominated State heritage items, the Plan requires notice to the Heritage Council and the taking into account of any response within 28 days (cl 5.10(7), (9)). Missing these notices or inadequate heritage assessments can lead to invalid or challengeable decisions.
Clause 5.20 narrows refusal grounds for licensed premises
The consent authority may not refuse licensed-premises applications on enumerated grounds relating to music, performance or dance (cl 5.20(1)). But cl 5.20(2) preserves noise management: the consent authority must be satisfied noise can be managed. Applicants and neighbours alike may misunderstand this balance and litigation or review claims may arise if noise outcomes are later contested.
Time-limited additional permissions exist
Schedule 1 item 5 authorises a single service station at a particular lot but is explicitly repealed on 15 April 2027 (Sch 1 cl 5(3)). Time-limited permissions can create future legal uncertainty for investment planning.
Multiple overlapping statutory regimes
The Plan repeatedly states that approvals under other Acts may still be required (for example cl 3.1(5) (Biodiversity/Local Land Services), cl 5.12(1) (Transport and Infrastructure SEPP), cl 5.19 (Fisheries/Aquaculture)). Relying on Plan permissibility without securing necessary other approvals is a practical pitfall.
Site-specific clauses can create asymmetry
Schedule 1 creates rights for specific parcels (dual occupancy permissions on particular lots). Those give owners concentrated entitlements not available to neighbouring owners. Practitioners should double-check title details and any conditions that attach to those site-specific clauses.
Exceptions that create further scrutiny
Several clauses grant consent only when the consent authority is “satisfied” certain matters apply (for example cl 6.7(3) for rural workers’ dwellings). Those satisfaction tests create a high evidentiary threshold and material sensitivity; clients should be prepared for requests for detailed economic or technical evidence.
No height or FSR controls adopted here
Clauses for height (cl 4.3), floor space ratio (cl 4.4) and their calculation (cl 4.5) are recorded as “[Not adopted]”. Absence of local height or FSR controls does not mean no controls exist: relevant State controls, precinct DCPs or other statutory controls might still apply.
In summary, the principal “gotchas” are map-dependence, procedural notifications, the limits of covenant suspension, the narrowness of exceptions to standards, and the need to coordinate statutory approvals across multiple Acts. Practitioners should map-check, confirm the relevant law at the time of lodgement, and assemble the technical documentation the Plan mandates.
How to comply
This section is a practical checklist for practitioners advising landowners or preparing development applications under the Dungog LEP. The steps below reference the clauses and schedules that set the Plan’s compliance requirements.
Confirm the applicable Plan version and maps
Start with the current consolidated LEP and the NSW Planning Portal maps. Identify the Land Zoning Map, Lot Size Map, Heritage Map, Riparian Lands and Watercourses Map, Acid Sulfate Soils Map, Drinking Water Catchment Map, Williams River Catchment Map and any other relevant overlay mapping (cl 1.7; cl 2.2; Schedule 5). Ensure you are working with the most current versions as maps can be amended.
Determine permissibility under the Land Use Table
Consult the Land Use Table for the zone to ascertain whether the proposed use is permitted without consent, permitted with consent or prohibited in that zone (cl 2.3). The consent authority must have regard to zone objectives when deciding (cl 2.3(2)).
Check whether the proposal is exempt or complying development
Review Schedule 2 for any exempt development entries and Schedule 3 for complying development types and their conditions (cls 3.1-3.2). Remember that exempt development must meet BCA deemed-to-satisfy provisions and cannot affect State heritage items (cl 3.1(2)-(4)). Exempt/compliant development is excluded on environmentally sensitive areas listed in cl 3.3.
For subdivision, verify Lot Size Map and applicable exceptions
Subdivision is only permitted with consent (cl 2.6(1)). Clause 4.1 mandates minimum lot sizes from the Lot Size Map; check whether community title (cl 4.1AA), split-zone exceptions (cl 4.1A) or lot boundary adjustment exceptions (cl 4.1B) apply. If seeking a smaller lot than the map, identify the statutory exception and gather evidence required by the consent authority (cl 4.1-4.2).
Identify overlay-triggered technical reports and prepare them early
Acid sulfate soils: if works are on mapped classes require an acid sulfate soils management plan per cl 6.1(3). A preliminary assessment can substitute subject to Council confirmation (cl 6.1(4)). Earthworks: cl 6.2 requires the consent authority to consider drainage, soil stability and the source/destination of fill. Flood planning: cl 5.21 requires assessment of flood function, evacuation routes and climate-change projections. Heritage: cl 5.10 may require a heritage management document or conservation management plan and mandatory notifications (cls 5.10(4)-(9)). Aquaculture: cl 5.19 and Schedule 6 specify species, pond design and discharge requirements.
If intending to rely on a variation to a development standard, prepare required justification
Clause 4.6 permits development consent to contravene a development standard only where the applicant demonstrates compliance with the statutory tests (cl 4.6(3)). The EP&A Regulation requires a document setting out the applicant’s grounds; ensure that document satisfies the Regulation’s requirements and that the contravention is not of an excluded standard (cl 4.6(8) , e.g. BASIX-related standards and complying-development standards).
For heritage or archaeological sites, follow notification procedures
If the site is within a heritage conservation area or contains an archaeological site, notify the Heritage Council and local Aboriginal communities as required and allow the statutory response period (cl 5.10(7)-(9)). Prepare heritage impact statements or management documents as the consent authority may require (cl 5.10(5)-(6)).
For licensed premises or performance venues, address noise management proactively
The Plan prevents refusal on enumerated music/dance grounds (cl 5.20); nonetheless the consent authority must be satisfied that noise may be managed and minimised to an acceptable level (cl 5.20(2)). Prepare acoustic assessments and mitigation measures to support an application.
Coordinate approvals under other Acts and SEPPs
Exemptness under this Plan does not remove the need for licences or approvals under other Acts (cl 3.1(5) note; cl 5.12(1)). Check for SEPPs that may prevail over the LEP (cl 1.9(1)), and confirm if the proposed works require licences under fisheries, Crown land or environmental protection laws.
Engage early with the consent authority on discretionary satisfaction tests
Many clauses require the consent authority to be “satisfied” about matters of compatibility, environmental impact and amenity (examples: cl 2.8(3), cl 5.13(3), cl 6.7(3)). Where these tests are subjective, early pre-lodgement meetings and scope agreements with Council on required technical information reduce the risk of refusal or requests for further information.
Prepare for notification, public consultation and potential conditions
Expect conditions related to stormwater retention (cl 6.4), shared infrastructure for dual occupancies (cl 6.11(3)(c)), ecological protections and monitoring for eco-tourist facilities (cl 5.13(3)(k)). Some approvals may trigger public notice procedures under the Act.
Verify title, covenants and the effect of cl 1.9A
Check registered covenants and agreements. Where a covenant would prevent lawful development under the Plan, cl 1.9A may render that covenant inapplicable to the extent necessary; however check exceptions in cl 1.9A(2) and confirm the covenant is not one the Council imposed or a listed conservation instrument. Also verify public-authority interests that remain unaffected by the clause (cl 1.9A(3)).
Time-limited permissions and future planning risk
Note time-limited Schedule 1 permissions (e.g. service station at 68 Grey Street repealed on 15 April 2027). Where long-term investment is contemplated, consider stability risk and whether further amendment or re-zoning will be necessary.
Record-keeping and appeal planning
If your client seeks reliance on a development-standard contravention, ensure the Council’s record of assessment is comprehensive (cl 4.6(4)). Prepare for potential merits review or judicial review by documenting procedural steps, notices and the technical bases for the Council’s satisfaction conclusions.
Practical template of required checks
Step 1: Current LEP and maps check (cl 1.7; cl 2.2).
Step 2: Zone permissibility (cl 2.3).
Step 3: Is it exempt/compliant? (cls 3.1-3.2; Schs 2-3).
Step 5: Standards and exceptions (cl 4.1, cl 4.6).
Step 6: Other statutory approvals and SEPPs (cl 1.9(1); cl 3.1(5)).
Step 7: Submit application with technical appendices and ensure statutory notices and referrals are timely.
Following these steps and citing the appropriate clauses in the development application and supporting statements will materially reduce the risk of procedural deficiency and increase the likelihood of a well-scoped assessment under the Plan.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Dungog Local Environmental Plan 2006
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E4 General Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
C4 Environmental Living
Waterway Zones
W1 Natural Waterways
cl 2.1: Am 2022 (830), Sch 1.10[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3)(d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is p
This is an opening excerpt, not the complete document.