This local environmental plan sets the land‑use rules for the Dubbo Regional local government area, replaces prior local plans for the area, and names Council as the consent authority. It establishes planning aims (growth, heritage, environment, transport and climate resilience), maps the land to which it applies, and cross‑references State laws that prevail.
It affects landowners, developers, Council and specialised operators (notably aquaculture): it creates conservation exclusion zones, suspends some private covenants to allow Plan‑consistent development, and imposes technical aquaculture and flood‑design requirements tied into other State instruments.
The Dubbo Regional Local Environmental Plan 2022 (LEP 2022) is the principal statutory planning instrument for the Dubbo Regional local government area. It repeals and replaces the Dubbo Local Environmental Plan 2011 and the Wellington Local Environmental Plan 2012 (cl 1.8). The LEP 2022 operates under the Environmental Planning and Assessment Act 1979 and sets out land use zones, development standards, and permissibility rules for all land within the area. It adopts the standardised zone framework prescribed under s 3.20 of the Act. The LEP’s core mechanical function is to classify land into 23 zones across rural, residential, employment, mixed use, special purpose, recreation, conservation, and waterway categories (cl 2.1). For each zone, the Land Use Table specifies: what development may be carried out without development consent, what requires consent, and what is prohibited. The LEP also imposes site-specific controls through maps identifying lot sizes, biodiversity areas, riparian land, karst topography, groundwater vulnerability, obstacle limitation surfaces for airports, aircraft noise contours, and heritage items. Development consent is generally required for subdivision (cl 2.6), demolition (cl 2.7), and earthworks (cl 7.2), subject to exemptions in Schedule 2 and complying development provisions in Schedule 3. The Plan includes a savings provision for development applications made before its commencement, requiring those applications to be determined as if the LEP had not commenced (cl 1.8A). It also suspends restrictive covenants, agreements and instruments that would otherwise prevent development consistent with the LEP, subject to exceptions for biodiversity conservation covenants, planning agreements, and certain heritage and Crown land instruments (cl 1.9A). The LEP is subject to any State environmental planning policy that prevails over it (cl 1.9).
Current sections
Direct links to the current provisions in Dubbo Regional Local Environmental Plan 2022.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2022 (314), Sch 1; 2022 (828), Sch 1.9[2]; 2023 (458), Sch 2.28; 2024 (201), Sch 1[1]–[3].
Zone RU1 Primary Production
Zone RU2 Rural Landscape
Zone RU3 Forestry
Zone RU4 Primary Production Small Lots
Zone RU5 Village
Zone R1 General Residential
Zone R2 Low Density Residential
Zone R5 Large Lot Residential
Zone E1 Local Centre
Zone E2 Commercial Centre
Zone E3 Productivity Support
Zone E4 General Industrial
Zone E5 Heavy Industrial
Zone MU1 Mixed Use
Zone SP2 Infrastructure
Zone SP3 Tourist
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone C2 Environmental Conservation
Zone C3 Environmental Management
Zone W1 Natural Waterways
Zone W2 Recreational Waterways
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agricultural produce industries; Agritourism; Airstrips; Animal boarding or training establishments; Aquaculture; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Centre-based child care facilities; Charter and tourism boating facilities; Community facilities; Correctional centres; Depots; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Extractive industries; Farm buildings; Forestry; Function centres; Group homes; Health consulting rooms; Helipads; Highway service centres; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Mooring pens; Moorings; Open cut mining; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Research stations; Respite day care centres; Restaurants or cafes; Roadside stalls; Rural workers’ dwellings; Secondary dwellings; Sewerage systems; Signage; Tourist and visitor accommodation; Veterinary hospitals; Water recreation structures; Water supply systems; Wharf or boating facilities
4
Prohibited
4 Prohibited
4 Prohibited
Advertising structures; Hotel or motel accommodation; Serviced apartments; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note—
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone C3 Environmental Management and marked “Environmental Management (C3)” | Transport for NSW |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Concurrence of Planning Secretary
6 Concurrence of Planning Secretary
6.1 Concurrence of Planning Secretary
(1) Development consent for the subdivision of land in an urban release area must not be granted unless the consent authority has obtained the concurrence of the Planning Secretary.
(2) In deciding whether to grant concurrence, the Planning Secretary must consider the following—
(a) the impact of the subdivision on—
(i) existing designated State public infrastructure, and
(ii) the need for additional designated State public infrastructure,
(b) the cumulative impact of the subdivision with other development that has been, or is likely to be, carried out in surrounding areas on—
(i) existing designated State public infrastructure, and
(ii) the need for additional designated State public infrastructure,
(c) the steps taken to address those impacts, including whether a planning agreement has been, or will be, entered into contributing to designated State public infrastructure.
(3) In deciding whether to grant concurrence, the Planning Secretary must also consult the public authorities that the Planning Secretary considers relevant to the subdivision.
(4) This clause does not apply—
(a) if all or part of the land to be subdivided is in a region within the meaning of the Act, Division 7.1, Subdivision 4, or
(b) to the subdivision of a lot that is, in the opinion of the Planning Secretary, a residue lot, or
(c) to a lot to be created by a subdivision on land that was the subject of a previous development consent granted in accordance with—
(d) to a lot proposed to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or other public purposes, or
(e) to subdivision that is only for the purposes of rectifying an encroachment on an existing lot.
(5) In this clause—
designated State public infrastructure means public facilities or services that are provided or financed by the State, or if provided or financed by the private sector, to the extent of the financial or in-kind contribution by the State, of the following kinds—
(a) State and regional roads,
(b) bus interchanges and bus lanes,
(c) rail infrastructure and land,
(d) regional parks and public space,
(e) social infrastructure and facilities, including schools, hospitals, emergency services and justice facilities.
cl 6.1: Am 2023 (554), Sch 2.10.
Part 7
Additional local provisions
Part 7 Additional local provisions
Part 7 Additional local provisions
7
Terrestrial biodiversity
7 Terrestrial biodiversity
7.1 Terrestrial biodiversity
(1) The objective of this clause is to maintain terrestrial biodiversity by—
(a) protecting native fauna and flora, and
(b) protecting the ecological processes necessary for the continued existence of native fauna and flora, and
(c) encouraging the conservation and recovery of native fauna and flora and their habitats.
(3) In deciding whether to grant development consent for development on land to which this clause applies, the consent authority must consider—
(a) whether the development is likely to have—
(i) an adverse impact on the condition, ecological value and significance of the fauna and flora on the land, and
(ii) an adverse impact on the importance of the vegetation on the land to the habitat and survival of native fauna, and
(iii) the potential to fragment, disturb or diminish the biodiversity structure, function and composition of the land, and
(iv) an adverse impact on the habitat elements providing connectivity on the land, and
(b) appropriate measures to avoid, minimise or mitigate the impacts of the development.
(4) Development consent must not be granted to development on land to which this clause applies unless the consent authority is satisfied—
(a) the development is designed, sited and will be managed to avoid a significant adverse environmental impact, or
(b) if a significant adverse environmental impact cannot be reasonably avoided—the development is designed, sited and will be managed to minimise the impact.
(a) part of Lot 1, DP 197736 and part of Lot 69, DP 259061, 63 Fitzroy Street,
(b) part of Lot 31, DP 1263665, 2R Gilgandra Road.
(2) Development for the purposes of light industries is permitted with development consent if the development involves the manufacture of manufactured homes and similar moveable structures.
12
Use of certain land at 10 Commercial Avenue, Dubbo
12 Use of certain land at 10 Commercial Avenue, Dubbo
12 Use of certain land at 10 Commercial Avenue, Dubbo
(1) This clause applies to Lot 701, DP 1254944, 10 Commercial Avenue, Dubbo, identified as “12” on the Additional Permitted Uses Map.
(2) Development for the purposes of pubs is permitted with development consent.
13
Use of certain land at Boundary Road, Dubbo
13 Use of certain land at Boundary Road, Dubbo
13 Use of certain land at Boundary Road, Dubbo
(1) This clause applies to part of Lot 500, DP 1260295, Boundary Road, Dubbo, identified as “13” on the Additional Permitted Uses Map.
(2) Development for the following purposes is permitted with development consent—
(a) recreation facilities (outdoor),
(b) registered clubs.
14
14
14 (Repealed)
15
Use of certain land at 14–16 Lee Street, Wellington
15 Use of certain land at 14–16 Lee Street, Wellington
15 Use of certain land at 14–16 Lee Street, Wellington
(1) This clause applies to Lot 3, DP 214773, 14–16 Lee Street, Wellington, identified as “15” on the Additional Permitted Uses Map.
(2) Development for the purposes of retail premises is permitted with development consent.
16
Use of certain land at 44–48 Curtis Street, Wellington
16 Use of certain land at 44–48 Curtis Street, Wellington
16 Use of certain land at 44–48 Curtis Street, Wellington
(1) This clause applies to Lot 2, DP 773253, 44–48 Curtis Street, Wellington, identified as “16” on the Additional Permitted Uses Map.
(2) Development for the purposes of caravan parks is permitted with development consent.
17
Use of certain land at 104 Gladstone Road, Bodangora
17 Use of certain land at 104 Gladstone Road, Bodangora
17 Use of certain land at 104 Gladstone Road, Bodangora
(1) This clause applies to Lot 6, DP 750760 at 104 Gladstone Road, Bodangora, identified as “17” on the Additional Permitted Uses Map.
(2) Development for the purposes of livestock processing industries that are poultry abattoirs is permitted with development consent.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2025 (167), Sch 1.
sch.2-sec
Subdivision of council public roads
sch.2-sec Subdivision of council public roads
Subdivision of council public roads
Must relate to land comprising a council public road proposed for closure under the Roads Act 1993, Part 4, Division 3.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
sch 5: Am 2022 (390), cl 5(2).
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Dubbo Regional Local Environmental Plan 2022.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in the Dubbo Regional local government area in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to maintain the Dubbo Central Business District as the primary commercial centre for the Dubbo Regional local government area,
(b) to encourage residential development in West Dubbo,
(c) to encourage development that complements and enhances the unique character and amenity of the Dubbo Regional local government area,
(d) to provide high quality open spaces to meet the recreational needs of residents and visitors to the Dubbo Regional local government area,
(e) to conserve and protect the environmental and cultural heritage of the Dubbo Regional local government area,
(f) to make adequate provision for the development and improvement of cultural, educational, research and medical institutions,
(g) to ensure land zoned for industrial purposes is protected from development that is inconsistent with the objectives for development in the zone,
(h) to protect and conserve agricultural land, in recognition of the contribution of agriculture to regional economies,
Main concepts
The LEP is built around the concept of zones with objectives and a Land Use Table that determines permissibility. Each zone has stated objectives that the consent authority must have regard to when determining a development application (cl 2.3(2)). The Land Use Table is divided into three columns: permitted without consent, permitted with consent, and prohibited. However, “permitted without consent” development is still subject to Part 5 of the Act (environmental assessment if it is a public authority activity). The zone objectives are not merely aspirational; they are used in practice to refuse or condition consent. For example, Zone RU1 Primary Production aims to minimise fragmentation and alienation of resource lands, which feeds into minimum lot size controls under Part 4. Another key concept is the minimum subdivision lot size shown on the Lot Size Map (cl 4.1). The LEP also introduces the concept of “exceptions to development standards” under cl 4.6, which allows development consent to be granted even if it contravenes a development standard, provided the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds. This provision does not apply to certain rural and conservation zone subdivisions (cl 4.6(6)), or to complying development standards, BASIX commitments, or controls on secondary dwellings and artisan food and drink industries. The concept of “environmentally sensitive areas for exempt or complying development” excludes development from streamlined approval pathways if the land falls within defined categories such as coastal wetlands, Ramsar wetlands, or land of high biodiversity significance (cl 3.3). The LEP also establishes a hierarchy for acquiring land reserved for public purposes (cl 5.1), with the acquisition authority depending on the zone and marking on the Land Reservation Acquisition Map (e.g. Council for local open space, Transport for NSW for classified roads). Finally, the LEP introduces local provisions addressing terrestrial biodiversity (cl 7.1), riparian land and waterways (cl 7.3), groundwater vulnerability (cl 7.5), and aircraft noise (cl 7.8), which constrain development on identified land.
Who it affects
The LEP directly affects all landowners, developers, and residents within the Dubbo Regional local government area. It primarily affects those seeking to subdivide land, erect buildings, change land use, or carry out earthworks. Owners of rural land in Zones RU1, RU2, RU4, and RU5 are particularly affected by subdivision and dwelling entitlements. For instance, clause 4.2C restricts dwelling houses on rural land unless the lot meets minimum size thresholds or qualifies as an existing holding defined by 26 June 1987 ownership patterns. Applicants for rural workers’ dwellings must demonstrate the agricultural enterprise has economic capacity to support ongoing employment (cl 7.6). Owners of land in urban release areas (Part 6) face additional requirements: the consent authority must obtain concurrence from the Planning Secretary for subdivisions, and must be satisfied that essential public utility infrastructure is available (cl 6.2). Developers of land near airports (Dubbo City Regional Airport and Wellington/Bodangora Airport) must comply with obstacle limitation surface and aircraft noise attenuation standards (cls 7.7, 7.8). Landowners within the 18km and 12km radii of the Siding Spring Observatory face strict lighting controls (cl 5.14), limiting outside light fittings to shielded types and maximum lumen outputs. Businesses and commercial operators are affected by floorspace controls: neighbourhood shops are capped at 150m² retail floor area (cl 5.4(7)), and artisan food and drink industries in certain zones have retail sales limited to 20% of gross floor area or 400m², whichever less (cl 5.4(10)). Local clauses impose additional area-specific limits, such as the cap on retail premises on “Area D” land in Zone E1 at 1,000m² (cl 7.12), and the maximum of 196 lots on “Area C” land (cl 7.18). The Plan also affects holders of heritage items listed in Schedule 5, requiring consent for demolition, alterations, or subdivision and applying a heritage assessment process (cl 5.10). Public authorities are affected by the suspension of covenants but are generally exempt from LEP restrictions for infrastructure development under State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2 (cl 5.12).
Key duties and rights
The LEP imposes duties on both applicants and consent authorities. The consent authority (the Council, subject to the Act) must have regard to zone objectives when determining development applications (cl 2.3(2)). For development within the flood planning area, the consent authority must be satisfied the development is compatible with flood behaviour, will not adversely affect flood behaviour or evacuation capacity, and incorporates appropriate risk management measures (cl 5.21). In deciding whether to grant consent for intensive livestock agriculture, the consent authority must consider odour impacts, water and soil pollution potential, and consistency with industry codes (cl 5.18). For eco-tourist facilities, the consent authority must be satisfied of a demonstrated connection to ecological values, minimal environmental impact, and appropriate waste and energy management (cl 5.13). The LEP also imposes a duty on applicants to provide information: for development that contravenes a development standard under cl 4.6, the application must be accompanied by a document setting out grounds demonstrating compliance is unreasonable or unnecessary and sufficient environmental planning grounds exist (regulation requirement noted in cl 4.3 note). Rights of landowners include the ability to apply for exceptions to development standards under cl 4.6, though this is excluded for certain rural subdivisions. Landowners may also apply for a conservation incentive under cl 5.10(10) to use a heritage building for a purpose otherwise prohibited, if it facilitates conservation and meets heritage management document requirements. The LEP grants a right to carry out exempt development without consent if it meets the standards in Schedule 2 and complies with Part 3 (cl 3.1). Exempt development must meet the Building Code of Australia deemed-to-satisfy provisions, must not be designated development, and must not be on land with a State heritage listed item (cl 3.1(3)). Complying development (Schedule 3) may be carried out via a complying development certificate, but must be permissible with consent in the zone and meet the Building Code (cl 3.2). The LEP also preserves existing use rights: development applications lodged before the LEP’s commencement are determined under the old instruments (cl 1.8A). Additionally, clause 1.9A suspends restrictive covenants that would prevent development consistent with the LEP, which is a significant right for landowners, though it does not affect covenants imposed by Council or certain biodiversity and planning agreements.
Penalties and enforcement
The LEP itself does not prescribe criminal penalties; enforcement occurs under the Environmental Planning and Assessment Act 1979. However, the LEP establishes the legal framework for what constitutes prohibited development, development without consent, and breach of conditions. Carrying out development without the required consent, or in breach of a condition of consent, is an offence under the Act. Penalties under the Act include substantial fines (up to $1.1 million for corporations and $220,000 for individuals for serious offences, plus daily penalties). The LEP’s prohibition on canal estate development (cl 2.9) carries particular enforcement risk: developers attempting to construct canal estates in contravention of the LEP would face stop-work orders, remediation orders, and prosecution. The consent authority also has powers to issue orders for the remediation of unlawfully carried out development, such as earthworks affecting drainage patterns or riparian land. The LEP’s environmental overlay provisions (biodiversity, riparian land, karst topography, groundwater vulnerability) create enforceable conditions on development consent. Breach of a condition based on these provisions can lead to enforcement action. For example, development that fails to avoid a significant adverse environmental impact on biodiversity land (cl 7.1(4)) or that does not manage wastewater in karst areas (cl 7.4(4)) would be unlawful unless the consent authority has properly assessed and conditioned it. The LEP also restricts the ability to obtain development consent for certain developments that would contravene clause 5.4 (controls on bed and breakfast, home businesses, home industries, neighbourhood shops, etc.), and clause 5.5 (secondary dwellings in rural zones). Obtaining consent in violation of these controls could be challenged in the Land and Environment Court. The Siding Spring Observatory lighting controls (cl 5.14) are particularly strict: development consent must not be granted if it results in outside light fittings that are not shielded, or exceed specified lumen limits, without the concurrence of the Planning Secretary. The clause also expressly excludes the operation of the exceptions to development standards (cl 4.6) from this clause, preventing any flexibility. Non-compliance with lighting conditions would be a breach of consent and enforceable. Additionally, the LEP requires the consent authority to keep a record of its assessment for cl 4.6 variations (cl 4.6(4)), which aids transparency and enforcement accountability.
How it interacts with other laws
The LEP is explicitly subject to State environmental planning policies (SEPPs), which prevail over the LEP as provided by s 3.28 of the Act (cl 1.9). This means SEPPs such as State Environmental Planning Policy (Housing) 2021, (Transport and Infrastructure) 2021, (Resources and Energy) 2021, (Resilience and Hazards) 2021, (Industry and Employment) 2021, and (Primary Production) 2021 may override the LEP’s provisions. For example, SEPP (Transport and Infrastructure) Chapter 2 allows public authorities to carry out infrastructure development without consent or with consent, and the LEP does not restrict that (cl 5.12). The LEP also interacts with the Biodiversity Conservation Act 2016: the LEP’s suspension of covenants clause (cl 1.9A) does not apply to biodiversity certification under Part 8 of that Act, or to private land conservation agreements. The LEP’s exempt and complying development pathways are subject to the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008. The LEP provides additional exempt and complying development beyond that SEPP (see Schedules 2 and 3 notes). The LEP also interacts with the Local Land Services Act 2013 regarding native vegetation clearing: exempt development must not involve vegetation clearing that requires a permit or development consent unless undertaken in accordance with an approval (cl 3.1(5)(b)). The Heritage Act 1977 is engaged for heritage items listed on the State Heritage Register (cl 5.10(7) requires notification to the Heritage Council before granting consent for archaeological sites). The LEP also interacts with the Rural Fires Act 1997: bush fire hazard reduction work may be carried out without development consent (cl 5.11). The National Parks and Wildlife Act 1974 is relevant for land in Zone C1 and for Aboriginal objects and places (cl 5.10). The Lighting Controls Map for Camp Road, Dubbo (cl 7.15) designates the land as being in a buffer area for the purposes of the Exempt and Complying Development Codes SEPP. The LEP also uses definitions from the Fisheries Management Act 1994 and regulations for aquaculture (cl 5.19). For land acquisition, the LEP references the Land Acquisition (Just Terms Compensation) Act 1991 (cl 5.1). The classification and reclassification of public land under Schedule 4 operates under the Local Government Act 1993 (cl 5.2). The LEP’s clause 4.6 exceptions to development standards does not apply to development standards that arise under regulations in connection with a BASIX certificate under the repealed SEPP (Building Sustainability Index: BASIX) 2004 (cl 4.6(8)(b)), reflecting continued interaction with that instrument. Finally, the LEP’s prohibition on canal estate development (cl 2.9) interacts with the Flood Risk Management Manual definition of flood planning area, which is also used by other NSW planning instruments.
Amendment history
The LEP 2022 was made and published on the NSW legislation website, commencing on that date (cl 1.1AA). The instrument has been amended several times since commencement. Clause 2.1 (land use zones) was amended by 2022 (828), Sch 1.9[1]. The Land Use Table was amended by 2022 (314), Sch 1; 2022 (828), Sch 1.9[2]; 2023 (458), Sch 2.28; and 2024 (201), Sch 1[1]-[3]. Clause 4.2D (exceptions to minimum subdivision lot sizes for split zones) was inserted by 2024 (201), Sch 1[4]. Clause 5.5 (controls relating to secondary dwellings on land in a rural zone) was substituted by 2022 (390), cl 5(1). Clause 5.3 (development near zone boundaries) was amended by 2022 (828), Sch 1.9[3]. Clause 6.1 (concurrence of Planning Secretary) was amended by 2023 (554), Sch 2.10. Part 7 local provisions were substantially amended: clause 7.11 (commercial premises in Zone MU1) was substituted by 2022 (828), Sch 1.9[4] and subsequently amended by 2026 (68), Sch 1; clause 7.12 (shops on certain land in Zone E1) was substituted by the same amending instrument and amended by 2024 (42), Sch 1.17; clause 7.13 (development on certain land at Boundary Road, Dubbo) was substituted and amended by 2024 (89), Sch 1 and 2024 (316), Sch 1. Clause 7.16 (restricted premises) was amended by 2022 (828), Sch 1.9[5]. Clauses 7.20 and 7.21 were inserted by 2022 (828), Sch 1.9[6]. Schedule 1 (additional permitted uses) was amended by 2022 (369), cl 5 and 2022 (828), Sch 1.9[7]. Schedule 2 (exempt development) was amended by 2025 (167), Sch 1. Schedule 5 (environmental heritage) was amended by 2022 (390), cl 5(2). The amendment history shows that the LEP has been subject to frequent site-specific and policy-driven changes, particularly around commercial development limits and urban release areas. The inclusion of amendments through to 2026 indicates ongoing refinement of local planning controls, often in response to development applications or rezoning requests.
Litigation history
The LEP 2022 is relatively recent, and the source does not specify any litigated cases concerning its provisions. However, the LEP’s predecessor instruments (Dubbo LEP 2011 and Wellington LEP 2012) were subject to various Land and Environment Court proceedings typical of NSW planning litigation: appeals against refusals of development consent, challenges to the validity of certain clauses, and disputes over the application of development standards and exceptions under cl 4.6. The current LEP’s cl 4.6 (exceptions to development standards) is a standard provision in standard LEPs and has been extensively litigated in NSW. The leading case on cl 4.6 is Initial Action Pty Ltd v Woollahra Municipal Council [2018] NSWLEC 118, which established the strict test for granting variations. The LEP’s exclusion of certain zones from cl 4.6(6) is likely to be tested if landowners seek to subdivide rural land into below-minimum lots. The Siding Spring Observatory lighting controls (cl 5.14) are unusual and may generate litigation if developers challenge the strict prohibitions as unreasonable, or if the Planning Secretary’s concurrence is refused. The LEP’s heritage provisions (cl 5.10) are regularly subject to appeals regarding the assessment of impact on heritage significance and the extent of required heritage management documents. The LEP’s zone boundary provisions (cl 5.3) also have potential for interpretive litigation, particularly the 20-metre buffer for employment zones. The LEP’s savings provision (cl 1.8A) could be tested in disputes over development applications that straddled the commencement date. The suspension of covenants (cl 1.9A) has not been broadly litigated but may generate disputes over what constitutes a covenant “imposed by the Council or that the Council requires to be imposed” - arguably a broad exemption. The LEP’s local provisions, such as the 196-lot cap on “Area C” (cl 7.18) and the floorspace caps on shops and recreation facilities, may be challenged as ultra vires or unreasonable. Overall, the litigation history for this LEP will likely centre on cl 4.6 interpretations, heritage impacts, and the specific local provisions that limit development rights.
Gotchas
Several traps exist for developers and landowners. The first is the interaction between cl 4.6 (exceptions to development standards) and cl 4.6(6) which prohibits granting consent for subdivision in certain rural and conservation zones if the subdivision results in two or more lots below minimum area or any lot less than 90% of the minimum. This is absolute: no flexibility. A landowner in Zone RU1 cannot get a variation to create a 39-hectare lot (if minimum is 40 ha) for dwelling purposes if the subdivision would create multiple small lots. Second, the Siding Spring Observatory lighting controls (cl 5.14) apply not only within 18km but also at distances of 18km or more for light emissions of 1,000,000 lumens or more. This effectively restricts large-scale commercial or industrial development with extensive outdoor lighting over a vast area around the observatory. Third, the LEP’s exempt development does not apply to land with a State heritage listed item (cl 3.1(3)(d)), and if the development relates to an existing class 1b or class 2-9 building, the building must have a current fire safety certificate or statement (cl 3.1(4)). This is often overlooked by owners of small commercial buildings. Fourth, the definition of “existing holding” for dwelling entitlements on former Wellington LGA land (cl 4.2C(5)) is locked to 26 June 1987. This creates a hard cut-off: only holdings that existed on that date (or later acquisitions by the same owner since that date) qualify. A parcel acquired after that date that was not part of a holding at that time will not qualify, severely restricting new dwellings on rural lots created after 1987. Fifth, the LEP’s controls on secondary dwellings in rural zones (cl 5.5) require the secondary dwelling to be within 100m of the principal dwelling, and the total floor area cannot exceed the greater of 60m² or 65% of the principal dwelling floor area. This is more restrictive than the Housing SEPP provisions for urban zones. Sixth, the LEP’s clause 7.10 for dwelling houses in Zone RU4 requires the land to be used for intensive plant agriculture, extensive agriculture, or aquaculture, and the dwelling must support that activity. A dwelling cannot be justified solely for residential purposes. Seventh, the LEP’s clause 7.9 for sex services premises requires the consent authority to consider proximity to residential zones, child care facilities, schools, and places of worship. This can effectively prohibit such premises in many locations. Eighth, the LEP’s clause 5.4(10) limits artisan food and drink industry retail sales to 20% of gross floor area or 400m², whichever less, in certain zones. This catches microbreweries and distilleries that want to sell retail. Ninth, the LEP’s clause 2.9 prohibits canal estate development, with a broad definition that includes use of fill to raise land for compliance with flood planning area requirements. This can prevent standard subdivision in low-lying areas. Tenth, the LEP’s clause 3.3 excludes environmentally sensitive areas from exempt and complying development. The definition of environmentally sensitive area for exempt or complying development includes land within 100m of coastal wetlands, a coastal lake, or Ramsar wetlands (cl 3.3(2)(f)). This buffer is a trap for development near these areas, as the buffer itself is not mapped on the LEP maps but must be measured on the ground.
How to comply
To comply with the LEP, a landowner or developer must follow a step-by-step process. First, identify the land’s zone and any overlays by consulting the Land Zoning Map, Lot Size Map, Terrestrial Biodiversity Map, Natural Resource Water Map, Natural Resource Karst Map, Natural Resource Groundwater Vulnerability Map, Obstacle Limitation Surface Map, Noise Exposure Forecast Contour Map, Land Reservation Acquisition Map, Heritage Map, Lighting Controls Map, and Additional Permitted Uses Map, all available on the NSW Planning Portal (cl 1.7). Second, check the Land Use Table for the zone to determine whether the proposed development is permitted without consent, with consent, or prohibited (cl 2.3). If permitted with consent, a development application must be lodged with the Council as consent authority (cl 1.6). Third, if the development is of low environmental impact, check whether it meets the standards for exempt development in Schedule 2 and Part 3. Exempt development must not be on environmentally sensitive areas (cl 3.3), must meet Building Code of Australia deemed-to-satisfy provisions (cl 3.1(3)(a)), and must not involve vegetation clearing requiring approval (cl 3.1(5)(b)). Fourth, if the development is prescribed in Schedule 3 Part 1 (currently blank), it may be complying development subject to conditions in Part 2 of that Schedule. Complying development must be permissible with consent in the zone (cl 3.2(3)(a)). Fifth, for subdivisions, check the minimum lot size on the Lot Size Map (cl 4.1). If the subdivision is for rural purposes, consider whether cl 4.2 (rural subdivision flexibility) or cl 4.2A (minimum lot sizes for certain rural subdivisions) applies. If the lot is split between zones, cl 4.2D may allow subdivision otherwise prohibited. Sixth, for dwelling houses in rural zones (cl 4.2C), ensure the lot meets minimum size or qualifies as an existing holding. For rural workers’ dwellings (cl 7.6), prepare evidence of economic capacity and necessity due to remote location. For secondary dwellings in rural zones (cl 5.5), ensure the total floor area does not exceed the greater of 60m² or 65% of principal dwelling floor area, and the distance between dwellings does not exceed 100m. Seventh, for development in flood planning areas (cl 5.21), engage a flood engineer to demonstrate compatibility with flood behaviour and evacuation safety. Eighth, for development near the Siding Spring Observatory (cl 5.14), consult the Dark Sky Planning Guideline and limit outside light fittings to shielded types with maximum lumen outputs. Ninth, for development on land identified on the Terrestrial Biodiversity Map (cl 7.1) or Natural Resource Water Map (cl 7.3), commission an ecological assessment demonstrating avoidance or minimisation of significant adverse impacts. Tenth, for heritage items (cl 5.10), obtain a heritage impact statement and seek consent for any changes to fabric or setting, even minor alterations. For development contravening a development standard, prepare a written request under cl 4.6 addressing the tests of unreasonableness/unnecessity and sufficient environmental planning grounds. For development in urban release areas (Part 6), ensure a development control plan is prepared that addresses staging, transport, landscaping, recreation, stormwater, hazard management, and urban design (cl 6.3). For commercial developments in certain zones, observe the floorspace caps in cls 5.4, 7.11, 7.12, 7.20, and 7.21. Finally, for subdivision in an urban release area, obtain the Planning Secretary’s concurrence (cl 6.1) and ensure public utility infrastructure is available or arrangements are made (cl 6.2). Compliance requires careful map reading, early engagement with Council, and expert reports for environmental overlays.
(i) to restrict development in environmentally sensitive areas to minimise the risk of urban and natural hazards, including development on the floodplains of the Macquarie, Bell and Talbragar rivers and development on land at risk of salinity,
(j) to manage urban stormwater to prevent damage to downstream development,
(k) to implement ecologically sustainable development to conserve environmental resources for the benefit of current and future generations,
(l) to promote the integration of development and transport nodes to improve access to public transport and reduce dependence on private vehicles,
(m) to encourage diversity in housing to meet the changing needs of the population,
(n) to improve resilience to the effects of climate change.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note—
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note—
The following local environmental plans are repealed under this provision—
Dubbo Local Environmental Plan 2011
Wellington Local Environmental Plan 2012
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note—
However, under the Act, Division 3.5, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, an agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to a biodiversity certification conferred under the Biodiversity Conservation Act 2016, Part 8, or
(c) to a private land conservation agreement within the meaning of the Biodiversity Conservation Act 2016, or
(d) to a relevant instrument within the meaning of the Crown Land Management Act 2016, section 13.4, or
(e) to the relevant provisions of a land management (native vegetation) code, and the necessary mandatory code compliant certificate, with respect to a set aside area under the Local Land Services Act 2013, Part 5A, or
(f) to a conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(g) to a property vegetation plan within the meaning of the Native Vegetation Act 2003 that is continued in force by the Biodiversity Conservation (Savings and Transitional) Regulation 2017, or
(h) to a Trust agreement within the meaning of the Nature Conservation Trust Act 2001 that is continued in force by the Biodiversity Conservation (Savings and Transitional) Regulation 2017, or
(i) to a planning agreement within the meaning of the Act, Division 7.1.
(3) This clause does not affect the rights or interests of a public authority under a registered instrument.
(4) Under the Act, section 3.16, the Governor, before the making of this clause, approved of subclauses (1)–(3).
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU2 Rural Landscape
RU3 Forestry
RU4 Primary Production Small Lots
RU5 Village
Residential Zones
R1 General Residential
R2 Low Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E2 Commercial Centre
E3 Productivity Support
E4 General Industrial
E5 Heavy Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP2 Infrastructure
SP3 Tourist
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C2 Environmental Conservation
C3 Environmental Management
Waterway Zones
W1 Natural Waterways
W2 Recreational Waterways
cl 2.1: Am 2022 (828), Sch 1.9[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes—
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes—
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note—
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note—
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without develo