The Order’s brevity and declaratory character produce several practical hazards and implementation risks. These are concrete issues that arise from the instrument’s text, not policy judgments.
Maps are “for general information purposes only” (clauses 5(2), 6(2), 7(2), 8(2))
- Consequence: Relying solely on the Schedule graphics for legal boundary determination is dangerous. The authoritative locational content is the textual coordinates and the GDA94 datum. If a practitioner or regulator uses the GIF or graphic as a legal boundary without matching it to the textual coordinates, there is risk of misapplication.
GDA94 requirement but no survey protocol (clause 3)
- Consequence: The Order requires that “point” coordinates be determined according to Geocentric Datum of Australia 1994. It does not specify the survey standard, epoch, tide epoch, vertical datum, or measurement methodology. Disputes about boundary placement or tidal measurement will therefore require contemporaneous expert evidence to translate the Order’s coordinates into on-ground boundaries. Practitioners should not assume that coordinates in the Order equate automatically to current GPS outputs without appropriate datum transformation and epoch adjustment.
Mean low water mark used as seaward boundary, but not defined in the instrument (clauses 5(1)(a), 6(1)(a), 7(1)(a), 8(1)(a))
- Consequence: The mean low water mark is a tidal datum that can vary with methodology and location. The Order does not adopt a particular tidal epoch or definition. Determining whether a particular strip of land or feature is “extending to the mean low water mark” may require coastal survey, historical tidal data, or authoritative coastal boundaries established elsewhere. Practitioners should anticipate contested expert evidence on the location of mean low water mark.
0.5 nautical miles seawards inclusion rule (clauses 5(1)(b), etc.)
- Consequence: The Order includes islands and rocky outcrops that are within 0.5 nautical miles seawards of any part of the land area. The instrument does not specify baselines from which seawards distance is to be measured, nor whether the measurement is to be from mean low water mark, from the nearest point, or by geodesic distance. Measurement methodology will therefore be a key point if inclusion of an island or rock is disputed.
No operative restrictions or enforcement provisions
- Consequence: The Order does not specify prohibited activities or penalties. That creates legal ambiguity for frontline enforcers and land managers who may be asked to apply dog-control rules or other restrictions. Practitioners advising councils, land managers or dog owners must look beyond the Order to find the operative legal prescriptions that apply inside these designated areas.
Administrative custody but no delegated powers
- Consequence: The Department of Premier and Cabinet is named as administrator, but the Order does not set out powers, guidance obligations, or enforcement duties for that Department. Queries about implementation, signage, or enforcement procedure must be addressed to the Department as administrator, but the Order does not obligate it to issue protocols.
Schedules contain duplicate headings and graphic links
- Consequence: The Schedules show repeated heading lines (for example “SCHEDULE 1 - Sensitive area - SCHEDULE 1 - Sensitive area - Stanley”) and image file names. Those are likely formatting artefacts in the published text but may cause confusion if copied into other documents. Practitioners should cross-check the coordinate clauses rather than rely on schedule headings.
Commencement tied to Gazette notification (clause 2)
- Consequence: Because the Order commences on the day its making is notified in the Gazette, any delay between making and Gazette publication delays commencement. The instrument records the Gazette notification date as 25 December 2019. In close-run regulatory timelines, parties should check the exact Gazette notice to confirm the effective date.
Potential mismatch between textual coordinates and graphic depictions
- Consequence: Where the GIF maps appear to show a boundary that looks broader or narrower than the textual coordinate description, the text controls because the maps are for general information. Practitioners should overlay coordinates in GIS using GDA94 rather than using the Schedule images as legal boundaries.
Evidentiary burden in disputes
- Consequence: Any prosecution or administrative action that relies on a finding that an event occurred within a specified area will require accurate spatial proof using GDA94-referenced points. That imposes evidentiary cost on regulators and defence cost on respondents.
In sum, the gotchas are practical: map non-authoritativeness, datum and tidal-datum ambiguities, measurement-method gaps for the 0.5 nautical mile rule, absence of enforcement provisions, and administrative opacity on implementation. These are not theoretical; they are a direct consequence of the phrasing and omissions in the Order.