Dangerous Goods (Transport by Road or Rail) Regulations 2018
87Prime contractors and rail operators
Start here
Get a plain-English read of 87
Turn the raw legal text into a practical explanation grounded in Dangerous Goods (Transport by Road or Rail) Regulations 2018.
87 Prime contractors and rail operators
(1) A prime contractor or rail operator must not transport dangerous goods if the prime contractor or rail operator knows, or reasonably ought to know, that—
(a) the goods are a placard load; and
(b) the load is not appropriately placarded.
(2) A prime contractor or rail operator must not transport a placard load if the prime contractor or rail operator knows, or reasonably ought to know, that the placarding of the load is false or misleading in a material particular.
(3) A prime contractor or rail operator must not use, or permit to be used, a cargo transport unit that is placarded as if it was a placard load if the person knows or reasonably ought to know that the cargo transport unit does not contain dangerous goods.
(4) Subregulation (3) does not apply if the placarding of the cargo transport unit complies with the requirements of the ICAO Technical Instructions or the IMDG Code with respect to the contents of the cargo transport unit.
(5) A prime contractor or rail operator must not transport a load of dangerous goods (other than a placard load) in or on a cargo transport unit if—
(a) the load is placarded; and
(b) the person knows, or reasonably ought to know, that the placarding is false or misleading in a material particular.