Dangerous Goods (Transport by Road or Rail) Regulations 2018
120Prime contractors
Start here
Get a plain-English read of 120
Turn the raw legal text into a practical explanation grounded in Dangerous Goods (Transport by Road or Rail) Regulations 2018.
120 Prime contractors
(1) A prime contractor engaged in the bulk transfer of dangerous goods must ensure that any hose assembly that is used, or that is intended to be used, for the transfer of the dangerous goods (other than a hose assembly for which the prime contractor is not responsible)—
(2) A prime contractor engaged in the bulk transfer of dangerous goods must ensure, so far as is practicable, that dangerous goods are transferred—
(b) in a way that averts, eliminates or minimises risk.
(3) The prime contractor must keep, in accordance with section 10.1.3.4 of the ADG Code, accurate records of all maintenance work, and each inspection and test, carried out on the hose assembly.