This Plan sets the zoning, permitted/prohibited uses and approval rules for land in Coonamble. It specifies when Council consent is required, what development can be exempt or complying, minimum lot sizes, heritage and environmental protections (biodiversity, waterways, groundwater), flood controls and special lighting controls near Siding Spring Observatory, and public‑land classifications. It matters to landowners, developers and the Council because it determines what can be built, what approvals and assessments are needed, and what environmental and heritage safeguards apply.
This instrument is the local environmental plan (LEP) applying to Coonamble and operates as the local statutory zoning and development-control framework for the land shown on its maps. Mechanically it does the following.
Establishes the Plan and its commencement arrangements, applying from the date of publication on the NSW legislation website, cl 1.1AA. It names the Plan (cl 1.1) and identifies the land by reference to the Land Application Map and Land Zoning Map, cll 1.3, 2.2.
Repeals prior local environmental plans and deemed environmental planning instruments that applied only to the land to which this Plan applies, cl 1.8. It thereby consolidates previous local instruments for the same land under the new document.
Declares the consent authority, making the Council the decision maker for development consents under this LEP, subject to the Environmental Planning and Assessment Act 1979 and other higher-order instruments, cl 1.6.
Creates zoning categories and a Land Use Table which specify for each zone the zone objectives and what development is permitted without consent, permitted with consent, or prohibited, cl 2.1, 2.3 and the Land Use Table in Part 2. Zoning maps and other named maps are adopted and may be amended, cl 1.7.
Sets principal development standards and development controls including subdivision consent requirements, minimum lot sizes, controls on demolition, temporary uses, prohibition of canal estates, and a range of more specific controls such as farm stay and farm gate criteria, cll 2.6, 2.7, 2.8, 2.9, 4.1, 5.24, 5.25.
Establishes paths for exempt and complying development, by identifying exempt development in Schedule 2 and complying development in Schedule 3, and by setting the eligibility and procedural requirements for those pathways, cll 3.1, 3.2.
Current sections
Direct links to the current provisions in Coonamble Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (314), Sch 1; 2022 (832), Sch 1.4[2].
Zone RU1 Primary Production
Zone RU3 Forestry
Zone RU5 Village
Zone R1 General Residential
Zone R5 Large Lot Residential
Zone E1 Local Centre
Zone E3 Productivity Support
Zone E4 General Industrial
Zone SP2 Infrastructure
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone W2 Recreational Waterways
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Cemeteries; Community facilities; Correctional centres; Depots; Dwelling houses; Eco-tourist facilities; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Farm stay accommodation; Freight transport facilities; Heavy industrial storage establishments; Heavy industries; Helipads; Home industries; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Jetties; Landscaping material supplies; Local distribution premises; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Research stations; Roads; Roadside stalls; Rural industries; Rural workers’ dwellings; Storage premises; Truck depots; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Liquid fuel depots; Self-storage units; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Terrestrial biodiversity
6 Terrestrial biodiversity
6.1 Terrestrial biodiversity
(1) The objective of this clause is to maintain terrestrial biodiversity by—
(a) protecting native fauna and flora, and
(b) protecting the ecological processes necessary for their continued existence, and
(c) encouraging the conservation and recovery of native fauna and flora, and their habitats.
(3) Before determining a development application for development on land to which this clause applies, the consent authority must consider whether or not the development—
(a) will cause any adverse impact on the condition, ecological value and significance of the fauna and flora on the land, and
(b) will cause any adverse impact on the importance of the vegetation on the land to the habitat and survival of native fauna, and
(c) has any potential to fragment, disturb or diminish the biodiversity structure, function and composition of the land, and
(d) will cause any adverse impact on the habitat elements providing connectivity.
(4) Development consent must not be granted to development on land to which this clause applies unless the consent authority is satisfied that—
(a) the development is designed, sited and will be managed to avoid any adverse environmental impact, or
(b) if that impact cannot be avoided by adopting feasible alternatives—the development is designed, sited and will be managed to minimise that impact, or
(c) if that impact cannot be minimised—the development will be managed to mitigate that impact.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2022 (832), Sch 1.4[7]–[9].
sch.2-sec
Signage—real estate signs
sch.2-sec Signage—real estate signs
Signage—real estate signs
(1) Maximum area—4.0m2, or if on land in an conservation zone—2.5m2.
(2) Maximum 2 signs per premises.
(3) Must be removed within 14 days after the premises or land is sold or let.
(4) Must be non-flashing.
(5) Must not be illuminated.
(6) Must be within the boundary of the advertised property.
sch.2-sec-oc.2
Signage—signs behind the glass line of a shop window
sch.2-sec-oc.2 Signage—signs behind the glass line of a shop window
Signage—signs behind the glass line of a shop window
Must not be illuminated.
sch.2-sec-oc.3
Signage—signs relating to lawful use of premises
sch.2-sec-oc.3 Signage—signs relating to lawful use of premises
Signage—signs relating to lawful use of premises
(1) Must relate to a lawful use of, and carried out on, the land.
(2) Maximum area—
(a) if on land in Zone RU1, RU5, R1 or R5—0.75m2, or
(b) if on land in Zone E4—5.0m2, or
(c) if on land in Zone E1 or E3—15% of the front elevation of the building on which it is displayed, or
(d) 2.5m2.
(3) Must be behind the glass line of a shop or window.
(4) If on land in a residential zone—must not be illuminated.
(5) Maximum height—
(a) 3m above ground level (existing) or if suspended from an awning on a public road, 2.7m above ground level (existing), or
(b) the height of the underside of any awning, whichever is greater.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Coonamble Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Coonamble in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage sustainable economic growth and development within Coonamble,
(b) to encourage and provide opportunities for local employment growth and the retention of population in Coonamble,
(c) to encourage the retention of productive rural land for agriculture,
(d) to identify, protect, conserve and enhance Coonamble’s natural assets,
(e) to identify and protect Coonamble’s built and cultural heritage assets for future generations,
(f) to allow for the equitable provision of social services and facilities for the community,
(g) to provide for future tourist and visitor accommodation in a sustainable manner that is compatible with, and will not compromise, the natural resource and heritage values of the surrounding area.
Imposes local environmental constraints and decision-making criteria across environmental matters: terrestrial biodiversity, water protection, wetlands, groundwater vulnerability, stormwater management, earthworks, flood planning and special flood considerations, cll 6.1-6.8, 5.21-5.22.
Provides targeted local provisions that interact with state instruments and other legislation: heritage conservation procedures and requirements (cl 5.10), aquaculture controls and operational standards (cl 5.19 and Schedule 6), dark-sky protections for Siding Spring Observatory with lumens thresholds and consultation/concurrence process (cl 5.14), and suspension of private covenants for development to the extent necessary (cl 1.9A).
Identifies the relevant State authority for owner-initiated acquisition of certain reserved land, and classifies or reclassifies particular parcels of public land as operational or community land, cll 5.1-5.2 and Schedule 4.
The Plan structurally sits below State environmental planning policies and the Environmental Planning and Assessment Act, and it repeatedly references external documents that define procedural or technical tests that the consent authority must apply, for example the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual for flood-related consent tests, cl 5.21-5.22.
The Plan therefore functions as both a map-based zoning instrument and a schedule of mandatory local development controls and assessment matters that the Council must apply in deciding development applications or in deciding whether development qualifies as exempt or complying development.
Main concepts
The LEP deploys standard local-planning instrument concepts with localised calibrations. Key concepts in operation and their mechanical effects in the LEP text are set out below.
Zones and Land Use Table. The Plan defines a list of zones (for example Zone RU1 Primary Production, Zone R1 General Residential, Zone E4 General Industrial) and adopts a Land Use Table that links each zone to objectives and to three categories of activity: development permitted without consent, permitted with consent, and prohibited, cll 2.1, 2.3 and Land Use Table. The consent authority must have regard to zone objectives when deciding applications, cl 2.3(2).
Development consent vs exempt and complying development. The Plan identifies classes of minimal-impact development as exempt (Schedule 2) and classes of development that may be carried out as complying development if certain standards and certificate conditions are met (Schedule 3), cll 3.1-3.2. Where development is not exempt or complying it requires development consent from the Council under the Act; the Plan specifies which categories require consent (for example subdivision cl 2.6, demolition cl 2.7).
Maps and external data layers. The Plan adopts named maps (Land Zoning Map, Lot Size Map, Natural Resource maps, Heritage Map) and makes those maps part of the instrument; references to maps include the current map and any amendments approved by the plan-making authority, cl 1.7. Decision-making frequently depends on attributes shown on those maps (for example whether land is in the “Biodiversity” area, cl 6.1(2); Lot Size Map figures in cl 4.1).
Minimum lot sizes and subdivision rules. The Plan sets minimum lot sizes that apply to subdivision outcomes in accordance with the Lot Size Map, and provides exceptions and special rules for community title schemes, strata subdivisions and rural subdivision, cll 4.1, 4.1AA, 4.1A, 4.2.
Environmental overlay controls and local assessment criteria. Rather than prescribing a single performance metric, the Plan imposes a set of matters that the consent authority must consider and tests it must be satisfied of before granting consent in relation to biodiversity (cl 6.1), water protection (cl 6.2), wetlands (cl 6.3), groundwater vulnerability (cl 6.4), earthworks (cl 6.7), stormwater management (cl 6.8) and flood planning and special flood considerations (cll 5.21-5.22). These clauses frequently require avoidance first, then minimisation, then mitigation if avoidance is not feasible, cll 6.1(4), 6.2(4), etc.
Heritage and Aboriginal cultural heritage processes. The Plan requires development consent for demolition, exterior alteration or other specified works affecting heritage items, Aboriginal objects, archaeological sites and heritage conservation areas, cl 5.10(2). It allows the consent authority to require heritage management documents and to impose conditions for conservation, cl 5.10(5)-(6), and prescribes consultation steps (Heritage Council, local Aboriginal communities) for certain categories, cll 5.10(7)-(9).
Interaction with State instruments and other Acts. The Plan is expressly subject to any State environmental planning policy that prevails under s 3.28 of the Act, cl 1.9(1). It references many external Acts, codes and guidelines which provide tests, exceptions and procedures to be applied by the consent authority; examples include the Heritage Act 1977 (heritage), Biodiversity Conservation Act 2016 (conservation areas), Rural Fires Act 1997 (fire hazard reduction), Local Government Act 1993 (public land classification), Fisheries Management Act 1994 (aquaculture industry development plans), and various State environmental planning policies noted in the Land Use Table.
Special local rules. A suite of localised controls applies by topic: prohibition of canal estates (cl 2.9) with an explicit definition, limits on temporary uses (maximum 52 days in any 12-month period, cl 2.8); controls on bed and breakfast and farm stay sizes (cl 5.4(1), (5)); detailed aquaculture site and operational requirements and exemptions in Schedule 6 and cl 5.19; and dark-sky protection for Siding Spring Observatory with hard lumens thresholds, consultation requirements and a Planning Secretary concurrence step, cl 5.14.
Suspension of restrictive covenants. The Plan contains a mechanism that, for the purpose of enabling development in accordance with the Plan or a consent under the Act, suspends private agreements and covenants to the extent necessary, subject to enumerated exceptions including covenants imposed by the Council and certain public-interest instruments, cl 1.9A.
Exceptions to development standards. The Plan includes a clause allowing the consent authority to grant consent to development that would contravene a development standard where the applicant demonstrates compliance with the 'unreasonable or unnecessary' test and provides environmental planning grounds, cl 4.6. The clause also contains express limits and records-keeping duties.
These concepts together operate as a rulebook for land-use change in the mapped area, allocating decision power to the Council, constraining private property uses via mapped zoning and specified permitted/permitted-with-consent categories, and setting process and evidence requirements for particular environmental sensitivities.
Who it affects
The Plan identifies a set of actors who are the direct decision-makers, benefiters, constrained parties and consultees. For each actor the instrument creates duties, opportunities or costs.
Landowners and prospective developers within the mapped area. The primary effect is on owners and those proposing to develop land in Coonamble because permitted uses, consent triggers and development standards are applied by zoning and local clauses, cll 2.2-2.3, 4.1. Owners pay application costs, statutory fees and compliance costs associated with development consents, heritage or biodiversity assessments, flood reports and any conditions imposed by consent. They may also benefit from exemptions and complying development pathways for lower-impact works, Schedule 2 and Schedule 3.
Council as consent authority. The Council is the consent authority for the LEP (cl 1.6) and therefore is responsible for applying the Plan, making decisions on development applications, keeping records of assessments (see cl 4.6(4)) and classifying public land (cl 5.2). The Council bears administrative costs and decision risk, including managing consultation duties set out in heritage clauses (cl 5.10) and flood and Siding Spring referrals (cll 5.14(4), 5.14(12), 5.21-5.22).
Neighbouring landowners and local residents. They are affected by development decisions through amenity impacts that the consent authority must consider, for example odour, noise and visual impacts where the Plan requires consideration (for intensive livestock cl 5.18(3)(b), farm stay cl 5.24(4)(a)), and temporary use impacts (cl 2.8(3)(b)). They may be notified or consulted through standard EA procedures under the Act.
Agricultural and aquaculture operators. The Plan expressly regulates ponds, tank-based and oyster aquaculture with site location and operational restrictions (cl 5.19 and Schedule 6). Intensive livestock enterprises are subject to thresholds and locational buffers for exempt development (cl 5.18(4)-(5)), and the Plan requires the consent authority to consider industry codes of practice and DPI guidelines, cl 5.18(3)(g)-(h).
Heritage owners and managers. Owners of heritage items listed in Schedule 5 are subject to consent requirements for demolition, alteration and subdivision (cl 5.10(2)). They must engage with heritage assessments and heritage conservation management plans where required (cl 5.10(5)-(6)).
Siding Spring Observatory and the Australian National University. The Plan creates a formalised procedural role for the observatory via required consultation with the observatory director and lumens-based development constraints for lit development within specified radii, cl 5.14(2)-(9), (12). The Planning Secretary must take observatory comments into account when deciding whether to grant concurrence for certain developments, cl 5.14(10).
State authorities and agencies. The Plan identifies State authorities as the relevant acquiring authority for specific reserved land on the Land Reservation Acquisition Map and Land Zoning Map, cl 5.1(2). Transport for NSW, the Minister for National Parks and the corporate entity under the Act are named as acquisition authorities in cl 5.1(2) table. The Plan also integrates State policies and the operation of other Acts, so State agencies may be involved in referrals and concurrence, cl 1.9, cl 5.12.
Aboriginal communities. The Plan requires notification and consideration of local Aboriginal communities before granting consent for development in Aboriginal places of heritage significance, cl 5.10(8). This creates procedural duties on the consent authority to consult and take responses into account.
Crown and public authorities. The Plan preserves the rights or interests of any public authority under any registered instrument when suspending covenants, cl 1.9A(3). The Plan also expressly permits certain infrastructure development by public authorities under the State SEPP for Transport and Infrastructure, cl 5.12(1).
Who pays and who decides. The immediate decision-maker for most development in the mapped area is the Council, cl 1.6; applicants pay the costs of preparing applications, assessments and any remedial or mitigation works required by consent conditions. Where concurrence or consultation with the Planning Secretary or other State agency is required, decision-making is shared or subject to higher-level approval for those specific matters, for example cl 5.14 (Siding Spring concurrence), cl 1.9(1) (SEPPs).
Behavioural consequences. The Plan steers private behaviour primarily by restricting permitted land uses in each zone, imposing minimum lot sizes for subdivisions, and imposing procedural thresholds and technical requirements for environmentally sensitive activities. It creates incentives for: locating certain industries in appropriate zones (via permitted uses and prohibitions in the Land Use Table), avoiding environmentally sensitive areas identified on maps, and minimising lumens from external lighting near Siding Spring Observatory.
Key duties and rights
This section sets out the principal duties the Plan imposes, and the rights it creates for applicants and third parties.
Principal duties imposed on applicants and consent authority
Obtain development consent where required. Development requires development consent where it is specified as permitted with consent in the Land Use Table or where the Plan otherwise requires consent, e.g. subdivision (cl 2.6), demolition (cl 2.7) and the many categories listed as “permitted with consent” throughout the Land Use Table.
Apply environmental tests and demonstrate compliance. For development in mapped sensitive areas, the applicant must provide sufficient information for the consent authority to be satisfied that the development is designed, sited and will be managed to avoid or minimise adverse environmental impacts, cll 6.1(3)-(4), 6.2(3)-(4), 6.3(3)-(4), 6.4(3)-(4).
Meet aquaculture and intensive livestock rules. Aquaculture proposals must comply with the site location and operational requirements in Schedule 6 and cl 5.19(2); intensive livestock proposals must meet detailed locational restrictions for exempt development and face further consideration if consent is required, cl 5.18.
For heritage-affected development supply heritage documents and consult. Consent is required for a range of works affecting heritage items and Aboriginal places, and the consent authority may require a heritage management document or heritage conservation management plan, cl 5.10(2), (5)-(6). The consent authority must notify and consider responses from the Heritage Council or local Aboriginal communities for certain types of heritage-affected development, cll 5.10(7)-(9).
For lit development near Siding Spring, consult and design to minimise light pollution. The consent authority must consider light-emission matters and consult with the observatory director for lit development within 18 kilometres; Planning Secretary concurrence is required in certain cases and the Secretary must take observatory comments and measured sky brightness into account, cl 5.14(2)-(11), (12).
For flood-affected land, satisfy flood-compatibility and evacuation criteria. The consent authority must be satisfied of compatibility with flood function and that appropriate measures for safe occupation and evacuation are incorporated, cl 5.21(2)-(3), and must consider projected climate change impacts and design for evacuation, cl 5.21(3)(a), (c).
Record-keeping obligations for exceptions. Where an exception to development standards is relied upon, the consent authority must keep a record of its assessment under cl 4.6(4).
Rights the Plan creates or recognises
Rights to carry out exempt development where Schedule 2 applies and standards are met. Exempt development is available for specified low-impact activities and is not subject to development consent, but remains subject to other approvals under other Acts and to compliance with the Building Code of Australia where applicable, cl 3.1(2)-(5) and Schedule 2 notes.
Complying development pathway where Schedule 3 applies. Certain development specified in Schedule 3 may be carried out as complying development, provided it meets the specified deemed-to-satisfy standards, cl 3.2(2)-(4).
Ability to seek an exception to development standards. Clause 4.6 permits the consent authority to grant consent despite contravention of a development standard if the applicant demonstrates the standard is unreasonable or unnecessary and provides environmental planning grounds. This creates a procedural right to argue a variation subject to evidentiary and record keeping requirements, cl 4.6(2)-(4).
Suspension of covenants to enable development consistent with the Plan. Clause 1.9A provides that agreements and covenants that restrict carrying out development do not apply to the extent necessary to enable development under the Plan, subject to specific exceptions such as covenants imposed by the Council and certain statutory instruments, cl 1.9A(1)-(3).
Conservation incentives for heritage items. The consent authority may grant development that would otherwise be inconsistent with the Plan if the proposed development facilitates conservation of a heritage item or Aboriginal place and satisfies conditions including an approved heritage management document and commitments to carry out identified conservation works, cl 5.10(10).
Who decides and procedural rights
The Council is the consent authority for the Plan, cl 1.6. For certain matters the consent authority must consult or obtain concurrence from other bodies such as the Heritage Council, local Aboriginal communities or the Planning Secretary, depending on the clause, cll 5.10(7)-(9), 5.14(4), 5.14(10).
Applicants have procedural rights to rely on exempt and complying development routes where the Plan and the NSW SEPPs allow, but are subject to notification or referral requirements under the Act and other legislation where those apply, cll 1.9, 3.1-3.2.
Finally, note that many of the Plan’s duties are framed as preconditions to consent, requiring the consent authority to be satisfied of particular facts before granting consent, rather than creating standalone offences or civil liabilities within the LEP text itself. Enforcement mechanisms and sanctions for non-compliance are matters for the Environmental Planning and Assessment Act and associated regulations rather than being set out in this LEP.
Penalties and enforcement
The LEP sets procedural and substantive consent requirements, but it does not itself set out penal sanctions. The instrument relies on the Environmental Planning and Assessment Act 1979 and associated regulations for enforcement, and it integrates statutory referral and concurrence steps that affect how enforcement and permissions are exercised. The text provides the following enforcement-relevant mechanics and triggers.
Consent as precondition. Multiple clauses make development consent a precondition for carrying out a category of development, for example subdivision (cl 2.6), demolition (cl 2.7) and most of the items in the Land Use Table which are specified as "permitted with consent". Where consent is required and development is carried out without it, liability and enforcement are governed by the Act and regulations rather than by this Plan; the Plan’s role is to set the triggers and standards that the Council must apply when exercising its powers.
Exempt and complying development carve-outs and conditions. Schedule 2 grants specific exempt development categories; Schedule 3 sets out complying development conditions. A development that meets those schedules may be carried out without a development consent, but the Plan emphasises that other statutory approvals remain necessary, Schedule 2 note 2 and cl 3.1(5). Failure to comply with the conditions of exempt or complying development typically affects the availability of that pathway and can make the works subject to enforcement under the Act and building regulation regimes.
Referral and concurrence duties create enforcement touchpoints. The Plan requires consultation or concurrence for particular matters (for example heritage notifications to the Heritage Council cl 5.10(7), Aboriginal community notification cl 5.10(8), and consultation and possible concurrence for lit development near Siding Spring Observatory cl 5.14(4), (5), (10)). These duties create procedural steps the consent authority must complete before granting consent and provide formal opportunities for other parties to influence outcomes.
Record-keeping and evidentiary obligations. When development standards are varied under cl 4.6, the consent authority must keep a record of its assessment, cl 4.6(4). That record supports internal review, administrative appeal and any enforcement action if consent conditions are later challenged.
Public land classification has legal effect. Clause 5.2 and Schedule 4 classify and reclassify public land as operational or community land under the Local Government Act 1993. These classifications change the legal status of those parcels and the Council’s ability to deal with them, subject to the Local Government Act procedural requirements, including discharge of trusts in particular circumstances cl 5.2(4)-(5).
Non-application to certain instruments or rights. The Plan preserves rights or interests of public authorities under registered instruments when it suspends other covenants, cl 1.9A(3). That provision limits the scope of any suspension and therefore constrains how enforcement and disputes over legal interests will play out.
No criminal or monetary penalty schedule in the LEP. The LEP text does not itself prescribe monetary fines, penalty units or criminal offences. Where the Plan requires consent and consent is not obtained, or where a person acts contrary to the Plan, enforcement and penalties are a matter for the Environmental Planning and Assessment Act 1979 and other relevant legislation and local council enforcement policies.
Practical enforcement risk and compliance behaviour. Because the Plan is a map-based instrument that structures consent triggers, the practical enforcement dynamic is that non-compliant activity is detectable via planning compliance inspections and third-party complaints. The Plan’s reliance on external technical guidance and State policies (for example the Considering Flooding guideline and the Flood Risk Management Manual, cl 5.21-5.22) creates evidentiary thresholds that determine whether the Council may lawfully grant consent and provide grounds for review when decisions are disputed.
For advice on specific enforcement options, remedies or sanction scales you must consult the Environmental Planning and Assessment Act 1979 and the regulations, and any Council enforcement policy. The LEP itself neither creates nor modifies statutory penalties; it defines consent gateways and substantive decision criteria that feed into the Act’s enforcement machinery.
How it interacts with other laws
The Plan is designed to operate within the hierarchical planning and legislative architecture of New South Wales. The text directly references and calibrates its operation with several state instruments and acts. Major interactions and the mechanical consequences follow.
State environmental planning policies. Clause 1.9(1) states the Plan is subject to any State environmental planning policy that prevails over it under s 3.28 of the Environmental Planning and Assessment Act 1979. The Land Use Table notes specific SEPPs that may be relevant to development including State policies on Housing 2021, Transport and Infrastructure 2021, Resources and Energy 2021, Resilience and Hazards 2021, Industry and Employment 2021, and Primary Production 2021. Where a SEPP applies and is inconsistent with the LEP, the SEPP will prevail to the extent of inconsistency as provided by the Act. This affects permitted uses, development standards and referral/concurrence obligations.
Environmental Planning and Assessment Act 1979. The Plan repeatedly presumes the operating framework of the Act. Examples: the consent authority role is “subject to the Act” (cl 1.6); a savings provision references Division 3.5 of the Act regarding applications made before commencement of a planning instrument (cl 1.8A note); and cl 1.9A was approved under s 3.16 of the Act. Procedural and enforcement aspects (notifications, public hearings, appeals) are therefore governed by the Act and the Plan sets local content for that exercise.
Heritage Act 1977. Heritage-related duties and definitions in cl 5.10 (demolition, disturbance, heritage management documents, notifications) cross-reference the Heritage Act 1977 and the State Heritage Register. The Plan requires notification to the Heritage Council and places limits on when consent may be granted for demolition of nominated State heritage items, cl 5.10(7), (9).
Local Government Act 1993. Clause 5.2 enables classification or reclassification of public land as “operational” or “community land” in accordance with Part 2 of Chapter 6 of the Local Government Act and references sections 30-33 of that Act. The Plan’s Schedule 4 implements specific reclassifications; the Local Government Act procedures for discharging trusts and classification apply where relevant.
Crown Land Management Act 2016 and associated Crown instruments. Clause 1.9A(2)(b) excludes relevant instruments within the meaning of s 13.4 of the Crown Land Management Act 2016 from the suspension-of-covenants provision, preserving Crown land instruments. The Plan also preserves rights of public authorities under registered instruments (cl 1.9A(3)).
Land Acquisition (Just Terms Compensation) Act 1991. Clause 5.1 designates relevant acquisition authorities for particular reserved land under the owner-initiated acquisition provisions of that Act, and notes the section on hardship and the requirement to acquire if delay would cause hardship, referring to s 23 of that Act.
Biodiversity and natural-resource statutes. The Plan cross-references the Biodiversity Conservation Act 2016 and the Fisheries Management Act 1994 for conservation and aquaculture matters. Schedule 6 and cl 5.19 require consistency with aquaculture industry development plans published under the Fisheries Management Act and exclude development from areas declared under the Biodiversity Conservation Act.
Rural Fires Act 1997. Clause 5.11 indicates bush fire hazard reduction work authorised by the Rural Fires Act may be carried out without development consent, aligning fire-safety powers and obligations.
Building Code of Australia and BASIX. Exempt and complying development rules require compliance with the Building Code of Australia, cll 3.1(3)(a), 3.2(3)(b), and the exceptions clause excludes development standards that would contravene a BASIX commitment, cl 4.6(8)(b). BASIX requirements may therefore constrain allowable variations and certificate pathways.
Other technical guidelines and manuals. The Plan makes specific external technical guidance normative in decision-making. Flood planning clauses require the consent authority to apply the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual, cll 5.21(4)-(5), 5.22(4).
SEPP (Exempt and Complying Development Codes) 2008. The Plan defers to that State instrument for many exempt and complying development matters, notes that the Policy has statewide application and that the Plan contains additional local exempt/compliant items, cll 3.1 note, Schedule 2 note, Schedule 3 note.
Consequences of interactions. Mechanically the Plan does not operate in isolation. Where its provisions conflict with a SEPP or other overriding State instrument, the higher instrument governs. Many Plan clauses direct the consent authority to take into account external documents and State agency comments, creating formal referral pathways that blur local-only decision autonomy. Where the Plan requires concurrence of the Planning Secretary or another State agency, the Council’s discretion is narrowed by that concurrence requirement, cl 5.14(5)-(7). Where statutes impose authorisations independent of the Plan (for example licences for aquaculture or Crown land dealings), those statutory regimes still apply and the Plan’s approval pathways do not negate the need for those authorisations (Schedule 6 notes and cl 5.19(1), (6)).
Amendment history
The LEP text contains embedded amendment annotations which record statutory changes and insertions. The instrument therefore includes a traceable chain of local amendments; the Plan text itself cites specific amendment instruments in footnotes and clause annotations. The key amendment markers and what they show in the document are set out below, based on the amendments cited in clause notes.
2011 initial and early amendments. Clause 4.1A was introduced by an amendment recorded as Am 2011 No 62, Sch 2.10, which added a restriction on strata subdivisions in Zone RU1 Primary Production, cl 4.1A, indicating an early post-enactment adjustment to prevent fragmentation that would create extra dwelling entitlements.
2012 amendment. Schedule 4 was amended by Am 2012 (163), Sch 1, reflected in changes to the schedules classifying public land.
2016 insertion. Clause 5.14 (Siding Spring Observatory,maintaining dark sky) was inserted in 2016, recorded as Ins 2016 (310), Sch 3.1. That provision adds procedural obligations, lumens thresholds and consultation requirements linked to the observatory, reflecting a locally specific environmental protection amendment.
2017 and 2018 updates. The Land Use Table annotations show Am 2017 (493), Sch 1.1 and cl 5.4 shows an amendment in 2018 Am 2018 (406), Sch 1.39 that updated floor area and activity limits (for example industrial retail outlets and home business/industry caps). Schedule 1 has an amendment Am 2018 (548), cl 4(1).
2019 amendments. Clause 1.8A (savings provision) contains an amendment footprint Am 2019 (621), Sch 5[1]; cl 1.9A also lists Am 2019 (621), Sch 5[2]-[4] as the amending authority. These insertions adjusted procedural savings and the suspension-of-covenants provision.
2021 and 2022 adjustments. Clause 3.3 and other environmental provisions show repeals or changes: cl 4.1A has earlier amendments; various clauses such as 2.1 were amended in 2022 (Am 2022 (832), Sch 1.4[1]) updating the list of land use zones and Land Use Table entries. Clause 6.8 stormwater management records an amendment Am 2022 (832), Sch 1.4[6]. Clause 4.2A on erection of dwelling houses was amended in 2022 (Am 2022 (832), Sch 1.4[3]). Schedule notes show Am 2022 (314), Sch 1 and other 2022 amendments across the Land Use Table.
2023 amendments. Multiple 2023 amendments are annotated: cl 1.8A shows an amendment in 2023 (609), Sch 1.1[1] tied to State Environmental Planning Policy Amendment (Flood Planning) 2023; cl 5.22 (special flood considerations) records Am 2023 (609), Sch 1.1[2]; cl 5.24 farm stay accommodation was substituted in 2023 (458), Sch 1[4]; other references to 2023 amendments appear in procedural clauses, illustrating continued evolution particularly around flood planning and climate change considerations.
The amending annotations included in the Plan function as the Plan’s publicly accessible legislative history within that instrument. They identify the year and statutory instrument number that made the amendment and the relevant schedule or clause. They indicate a trend toward:
stronger environmental/flood planning calibrations in 2021-2023, including integration of the Considering Flooding guideline and Flood Risk Management Manual references in cll 5.21-5.22 and insertion of flood-sensitive provisions in 2023;
targeted local protections such as the Siding Spring dark-sky protections added in 2016; and
technical and procedural adjustments to exempt and complying development pathways, subdivision controls and public land classifications across the period.
For a complete statutory history you should consult the instrument consolidation on the NSW legislation website where the LEP is published, and review the amending instruments cited in the clause annotations.
Litigation history
The instrument itself does not record any litigation or judicial decisions. There are no court cases, planning appeals or administrative tribunal decisions cited in the text.
Practical note on dispute pathways and likelihood of litigation. While the Plan does not contain litigation references, the Act under which the Plan operates provides the usual administrative review and merits-review pathways. Typical sources of dispute that frequently give rise to merits review or judicial review in the planning context, based on how the Plan is structured, would include:
challenges to council refusal or granting of consent where an affected party disputes the application of zone objectives, the interpretation of maps or compliance with environmental tests set out in cll 6.1-6.4 and cll 5.21-5.22;
disputes about whether development is properly characterised as exempt, complying or requiring development consent, given the Plan’s Schedule 2 and Schedule 3 entries and the Act’s Division 3.5 provisions referenced in cl 1.8A notes;
disputes about whether the consent authority correctly applied heritage requirements, or whether it complied with required notification and consultation steps in cl 5.10(7)-(9);
disputes concerning the exercise of discretion to grant an exception to a development standard under cl 4.6, where the consent authority’s assessment of whether compliance is “unreasonable or unnecessary” is contested and the record kept under cl 4.6(4) is tested; and
disputes over whether the suspension of covenants in cl 1.9A was lawfully applied in particular circumstances, especially where covenants were not within the enumerated exceptions.
The Plan’s procedural prescriptions such as retention of records, mandatory referrals and consultation obligations create documentary trails that are relevant in any administrative review or judicial review but the Plan does not itself describe remedies or litigation procedures. For actual litigation history you must query the NSW case law databases and council records; the LEP document does not provide such a record.
Gotchas
This LEP contains numerous points where a practitioner should not assume default outcomes. The following are concrete implementation traps, compliance pitfalls and decision frictions anchored in the instrument text.
Savings and pending applications. Clause 1.8A requires development applications lodged before the Plan’s commencement and not finally determined to be determined as if the Plan had not commenced. That means an application lodged under an old LEP remains assessable under that prior instrument even though the new zoning and controls have applied to other prospective applications, cl 1.8A(1). Practitioners must check lodgement and determination dates carefully; projects spanning commencement dates can be caught by this rule.
Suspension of covenants is limited. Clause 1.9A suspends private covenants to the extent necessary to enable development under the Plan or a consent. However there are explicit exceptions: covenants the Council imposed, relevant Crown land instruments, certain conservation agreements and planning agreements are unaffected, cl 1.9A(2)(a)-(g). This is not a blanket removal of all private encumbrances; verify whether a covenant is in the exception list before relying on the suspension.
Exempt development is not free of other approvals. Schedule 2 and cl 3.1 make clear that exempt development avoids development consent but does not avoid other statutory licences, approvals or building regulation requirements, and exempt development must still meet the Building Code of Australia and site-specific constraints (cl 3.1(3)-(5)). Adjoining owners’ rights and common law nuisance claims remain enforceable, Schedule 2 note 2.
Canal estate prohibition includes both filling and excavation. Clause 2.9’s definition of canal estate development includes raising land with fill and excavating to create waterways together with dwellings; the prohibition is broad and includes manipulations that create canals connected to surface water or groundwater. Proponents must ensure proposals do not meet the definition, cl 2.9(2).
Temporary use time limit and conditions. A temporary use can be consented for a maximum of 52 days in any 12 months (cl 2.8(2)); sales offices for new releases are an exception but other temporary uses must satisfy more exacting tests including restoration obligations at the end of the temporary use period, cl 2.8(3)-(5).
Siding Spring Observatory lighting thresholds are prescriptive and technical. For lit development within 18 km, the consent authority must not grant consent for certain outcomes such as unshielded fittings or fittings exceeding 900 or 1,800 lumens depending on distance, and a limit on the total lumens emitted is set (cl 5.14(3)-(6)). The Planning Secretary’s concurrence is required in many cases, and the Secretary must take measured sky brightness and observatory comments into account (cl 5.14(10)). Developers often overlook the need to consult the observatory director (cl 5.14(12)). The lumens figures are hard thresholds; do not treat them as mere guidance.
Flood and climate-change considerations are explicit and reference external technical manuals. Clauses 5.21 and 5.22 require the consent authority to assess flood compatibility, safe evacuation, projected climate change impacts, and to apply external guidance including the Considering Flooding Guideline and the Flood Risk Management Manual. Applicants must therefore prepare flood reports that align with those documents; failure to address these will be a refusal ground, cl 5.21(2)-(3), 5.22(3).
Minimum lot sizes and strata/community exceptions. Clause 4.1 sets minimum lot sizes per the Lot Size Map, but clauses 4.1AA and 4.1A create specific exceptions for community title schemes and strata subdivisions in RU1. Practitioners should check whether community-land or strata rules or the Part 6 exemptions under the State SEPP interact with the Plan’s minimum sizes and whether the subdivision is excluded from cl 4.1 by cl 4.1(4).
Intensive livestock thresholds create a narrow exempt category. Clause 5.18 sets capacity thresholds below which certain intensive livestock activities can proceed without consent, but adds multiple locational exclusions (environmentally sensitive areas, distance from other farms and watercourses). For example, a poultry farm with fewer than 1,000 birds may be exempt but not if it is within 500 metres of an unrelated dwelling or within specified distance of other farms, cl 5.18(4)-(5).
Heritage requirements impose procedural steps and possible conservation conditions. Before granting consent the Council must consider a proposed development’s effect on heritage significance and may require heritage management documents or conservation management plans, cl 5.10(4)-(6). Notifications and 28-day response periods to the Heritage Council or local Aboriginal communities apply for specified actions, cll 5.10(7)-(9). Heritage-related consents can therefore be delayed or conditioned heavily.
Local controls on uses and floorspace. Clause 5.4 sets specific quantitative limits on uses: home businesses 30 square metres, home industries 100 square metres, industrial retail outlets limited to 40% of gross floor area or 400 square metres, bed and breakfasts no more than six bedrooms, farm stay accommodation no more than 10 bedrooms, cl 5.4(1)-(5). These caps can change the commercial viability of proposals that otherwise might fit a zone’s permitted uses.
Signage exemptions are limited and differ by zone. Schedule 2 contains several signage exemptions with area and illumination limits that vary by zone. For example real estate signage is capped at 4.0m2 (2.5m2 in conservation zones) and must not be illuminated, sch.2 sec Signage,real estate signs. Developers should not assume large signs are permissible by default.
Clause 4.6 exceptions to development standards have express limits. The Plan permits flexibility but expressly prohibits its use where it would contravene standards for complying development, BASIX commitments or certain clauses (cl 4.6(8)). The consent authority must keep a record of the exercise, cl 4.6(4). This creates documentary obligations and limits the scope of permissible departures.
In short, do not assume that a local permissive wording or a State-level exemption will automatically authorise activity without checking the Plan’s mapped overlays, clause exceptions, consultation requirements and the specified numerical caps. Check the Lot Size Map, Natural Resource maps, Heritage Map and the Land Zoning Map early in project planning.
How to comply
A pragmatic compliance checklist follows. It prioritises steps derived from specific LEP clauses and schedules that practitioners must satisfy before lodging or pursuing development.
Identify the site attributes on the Plan’s maps.
Confirm the zoning on the Land Zoning Map and the applicable Land Use Table entries, cll 2.2-2.3. Identify whether the proposed use is permitted without consent, permitted with consent, or prohibited.
Check the Lot Size Map to determine minimum subdivision lot size rules and whether any special areas such as “Area A” or “Area B” apply for the 750 m2 sewered-lot exception, cl 4.1(4A).
Review the Natural Resource maps: Natural Resource,Biodiversity, Natural Resource,Waterways, Natural Resource,Wetlands, and Groundwater Vulnerability Map to see whether cll 6.1-6.4 apply.
Determine whether the development is exempt, complying or requires development consent.
Cross-check the proposal against Schedule 2 for exempt development requirements and limitations, cl 3.1 and Schedule 2 notes. Ensure compliance with the Building Code of Australia where relevant, cl 3.1(3)(a).
If relying on complying development, ensure the development is listed in Schedule 3 Part 1 and that it meets the specified deemed-to-satisfy provisions and certificate conditions in Schedule 3 Part 2, cl 3.2(2)-(4).
If the development is not exempt or complying, prepare a development application for Council.
For applications requiring consent prepare evidence to satisfy LEP tests.
Environmental overlays: For biodiversity, water protection, wetlands and groundwater vulnerability show avoidance first, then minimisation and mitigation options, cll 6.1(4), 6.2(4), 6.3(4), 6.4(4). Provide ecological reports, habitat assessments and connectivity analysis where cl 6.1 requires it.
Flood planning and special flood considerations: Prepare flood studies consistent with the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual, cll 5.21(4)-(5), 5.22(4). Address evacuation and flood behaviour compatibility, cl 5.21(2)-(3).
Heritage: If the site contains a heritage item or is within a heritage conservation area, prepare heritage impact statements and, if required by the consent authority, a heritage management document or conservation management plan as per cl 5.10(5)-(6). Build in time for 28-day referrals to the Heritage Council or Aboriginal communities where required, cll 5.10(7)-(9).
Siding Spring dark-sky constraints: For lit development within 18 km of Siding Spring Observatory, design lighting to meet shielded-fitting and lumens thresholds; engage with the observatory director early and be prepared for Planning Secretary concurrence where thresholds are exceeded, cl 5.14(3)-(6), (10)-(12).
Aquaculture and intensive livestock: For aquaculture follow Schedule 6 site and operational requirements and ensure species selection is consistent with aquaculture industry development plans, cl 5.19 and Schedule 6. For intensive livestock, check exempt thresholds and locational exclusions in cl 5.18(4)-(5).
Check other statutory approvals and licences.
Confirm whether other legislation requires separate licences or approvals, for example fisheries licences for aquaculture, Crown land licences for works on Crown land, or water-licensing for discharges. The Plan’s Schedule 6 notes and cl 5.19(1) state that other Acts may impose additional licensing requirements.
Confirm BASIX commitments and Building Code of Australia compliance where relevant, cll 3.1(3)(a), 3.2(3)(b), and note that clause 4.6 excludes departures that would contravene BASIX commitments, cl 4.6(8)(b).
Use the Plan’s procedural pathways correctly.
If seeking an exception to a development standard under cl 4.6 prepare a fulsome written justification that sets out why compliance is unreasonable or unnecessary and provides environmental planning grounds for the contravention; the Environmental Planning and Assessment Regulation 2021 requires a supporting document, cl 4.6(3) note. Expect the consent authority to keep a record of its assessment, cl 4.6(4).
For applications lodged before a plan change, rely on cl 1.8A savings rules if applicable. Where State policy amendments (for example State Environmental Planning Policy Amendment (Flood Planning) 2023) have recently commenced, verify whether special savings rules apply, cl 1.8A(2).
If the development involves public land classification or land reserved for acquisition, consult Schedule 4 and cl 5.1-5.2 to determine acquisition or classification consequences and the relevant State authority.
Engage early with the consent authority and stakeholders.
Pre-lodgement meetings with Council are advisable to iron out required technical studies, likely conditions and referral needs, particularly for complex matters such as heritage, biodiversity offsets or flood assessments referenced in cll 6.1-6.4 and 5.21-5.22.
Notify or consult with affected parties as required by the Act and the Plan, especially for heritage-affected development that triggers the Heritage Council or Aboriginal community notifications in cl 5.10(7)-(8).
Where the proposal is near Siding Spring Observatory, contact the observatory director early to identify lighting design expectations and the likelihood of Planning Secretary concurrence being required, cl 5.14(4), (12).
Prepare draft conditions and management documents.
Where the Plan anticipates management strategies (for example for eco-tourist facilities cl 5.13(3)(k) requires a management strategy addressing habitat maintenance, energy use, monitoring, ISO 14000 standards), prepare these documents to form part of the application and to facilitate clear consent conditions.
For heritage conservation incentives under cl 5.10(10), prepare a heritage management document that identifies conservation works and a financing and implementation strategy so that the consent authority may condition consent on the carrying out of those works.
Verify signage and minor works under Schedule 2.
For small retail, real estate or shop-window signage, check Schedule 2’s specific size, illumination and siting rules before installing signs; Schedule 2 sets strict numerical caps and illumination prohibitions that often catch businesses unaware.
Account for public land and acquisition consequences.
If the land is shown on the Land Reservation Acquisition Map or in Schedule 4, understand the identity of the relevant acquisition authority under cl 5.1 and whether owner-initiated acquisition or classification processes could affect the proposed development. If acquisition is likely, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 may require early acquisition in hardship cases; cl 5.1(1) note.
Keep documentary records.
Maintain clear records of the environmental planning grounds, heritage assessments, flood modelling, consultation correspondence (including observatory director communication), and any justification used to rely upon cl 4.6 exceptions. Clause 4.6(4) requires the consent authority to keep a record of assessments under that clause; applicants should ensure the supporting material is defensible on review.
By following these steps aligned to the Plan’s clauses, applicants can reduce uncertainty and the risk of refusal or protracted revisions. Early engagement with Council, technical advisors for heritage and environmental reports, and with external consultees (Heritage Council, observatory director, DPI for aquaculture) will reduce transaction costs and speed up decision-making.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Coonamble Local Environmental Plan 1997
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
Waterway Zones
W2 Recreational Waterways
cl 2.1: Am 2022 (832), Sch 1.4[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate