Step 1 , Identify the land and applicable maps: Begin by confirming that the subject parcel is within the Plan area via the Land Application Map (cl 1.3) and then identify the relevant Land Zoning Map, Lot Size Map, Heritage Map and any Natural Resource maps that apply to the parcel (cl 1.7; cl 2.2). The maps determine the zone, minimum lot size, whether the land is a mapped Sensitive Area for biodiversity, land or water (cls 6.1-6.3) and whether the land falls within sewage-buffer or heritage overlays (cl 6.7; cl 5.10; Schedule 5).
Step 2 , Check the Land Use Table and Schedules: Consult the Land Use Table entries for the parcel’s zone to see whether the proposed use is permitted without consent, permitted with consent or prohibited (cl 2.3(1)). If the use appears in Schedule 1 as an additional permitted use for particular land, follow Schedule 1 conditions (cl 2.5). If the developer seeks to rely on exempt development, check Schedule 2 and cl 3.1 and ensure all the exemptions’ conditions and the Building Code of Australia provisions are met (cl 3.1(2)-(5)). For complying development, confirm the development is listed in Schedule 3 and meets its development standards and conditions (cl 3.2(2)-(4)).
Step 3 , Confirm whether consent is required and which pathway applies: If the activity is permitted without consent in the Land Use Table and not excluded by Schedule 2 or cl 3.3 (sensitive areas), the proponent may proceed but must satisfy other statutory approvals (cl 3.1 note). If the activity is complying development, prepare a complying development certificate application that evidences compliance with the Building Code and any local conditions (cl 3.2(2)-(4)). If consent is required, lodge a development application with the Council and ensure the application addresses the Plan’s listed matters for the relevant clauses (for example heritage cl 5.10, flood cl 5.21, biodiversity cls 6.1-6.3, essential services cl 6.4, earthworks cl 6.6).
Step 4 , Prepare the documentation to meet clause-specific requirements:
- Where heritage is involved, prepare a heritage impact statement, and be ready for the consent authority to require a heritage management document or conservation management plan; allow time for Heritage Council or Aboriginal community notices and responses (cl 5.10(4)-(9)).
- For proposed contraventions of a development standard, prepare the justification document required under cl 4.6(3) and the Environmental Planning and Assessment Regulation 2021; the consent authority must keep a record of its assessment (cl 4.6(4)).
- For biodiversity, land and water Sensitive Areas, include ecological, geomorphological and hydrological assessments showing how the development will avoid, minimise or mitigate impacts in accordance with cls 6.1-6.3.
- For flood-prone land, address cl 5.21 matters including compatibility with flood function, evacuation safety, climate-change projections and relevant technical guidance (cl 5.21(2)-(3)).
- For intensive livestock or aquaculture proposals, ensure the proposal meets the capacity thresholds and locational exclusions in cl 5.18 and the site and operational requirements in cl 5.19 and Schedule 6, and demonstrate compliance with any aquaculture industry development plan or State strategy referenced (cl 5.19(1)-(6)).
Step 5 , Demonstrate essential services and infrastructure arrangements: For any development application, demonstrate availability or adequate arrangements to provide water supply, electricity, sewage treatment and disposal, stormwater management, and suitable road access as required by cl 6.4.
Step 6 , Engagement and consultation: For proposals affecting Aboriginal heritage or places of heritage significance, notify local Aboriginal communities in the manner appropriate and allow for the 28-day response window (cl 5.10(8)). Where required under cl 5.10(7)-(9) notify Heritage Council for archaeological sites or nominated State heritage demolition. Early engagement with Council about likely heritage or biodiversity requirements reduces the risk of later refusal or conditional approval.
Step 7 , Address noise and amenity where relevant: For licensed premises and entertainment venues, prepare a noise-management plan evidencing how noise will be managed and minimised to an acceptable level consistent with cl 5.20(2), because the Plan prevents refusal on many music-related grounds only if noise can be satisfactorily controlled.
Step 8 , Check covenant and title constraints: Review registered instruments and restrictive covenants. Clause 1.9A may suspend some covenants to the extent necessary for Plan-consistent development, but this clause excludes certain covenants and does not affect public authority interests (cl 1.9A(2)-(3)). Where covenants are in the excluded list or where public authority rights exist, address those constraints directly with the relevant bodies.
Step 9 , If intending subdivision, follow minimum lot-size and rural rules: For subdivision, follow cl 4.1 minimum lot sizes per the Lot Size Map, observe cl 4.1AA in community title contexts, and ensure strata subdivisions and rural subdivision rules in cls 4.2A-4.2D are complied with. Avoid creating additional dwelling entitlements contrary to cls 4.2-4.2B.
Step 10 , Comply with record-keeping and procedural obligations: If seeking an exception under cl 4.6, prepare the required records and anticipate that Council will keep an assessment record (cl 4.6(4)). Where the Plan requires notification (heritage cl 5.10(7)-(9)) or referral (e.g. to heritage or fisheries bodies), ensure documentary proof of compliance with those procedural steps is included in the DA.
Step 11 , Use the correct technical guidance and referenced documents: For flood planning, align evidence with the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual as cited in cl 5.21(4)-(5). For aquaculture, consult the NSW Oyster Industry Sustainable Aquaculture Strategy and the relevant aquaculture industry development plan referenced in cl 5.19.
Step 12 , Observe timing and transition rules: If a DA was lodged before the Plan’s commencement and remains undetermined, the savings provision applies , those applications are to be determined as if the Plan had not commenced (cl 1.8A). Ensure you apply the correct rules based on the relevant lodgement and determination timeline.
Step 13 , If in doubt, seek pre-lodgement advice: Given the Plan’s map-based and cross-referential nature, obtain pre-lodgement advice from the Council and, where needed, from specialist consultants (heritage, ecological, flood, traffic) to confirm likely conditions and necessary documentation.
Following these steps, and citing the relevant clauses in applications and supporting documents (for example cl 6.4 for services, cl 5.21 for flood, cl 5.10 for heritage, cl 5.19 and Schedule 6 for aquaculture), will materially reduce the risk of refusal or post-approval compliance issues.