These regulations set out detailed rules that make the Community Titles Act 2018 work in practice: how community schemes are planned and registered, how scheme plans, short‑form easements and restrictive covenants operate, what by‑laws and records are required, minimum insurance and 10‑year reserve planning, scheme manager qualifications and checks, termination procedures (trusts, independent advocates, voting) and fees. They affect developers, community corporations, scheme managers, lot owners, infrastructure owners and local governments by allocating costs, approval duties, disclosure obligations and specific timelines (see regs 75; 93–99; 142–147).
The Community Titles Regulations 2021 (WA) supply detailed procedural, evidential and technical rules that implement and give effect to multiple provisions of the Community Titles Act 2018. The regulations define approved forms and key terms (r. 4; r. 3), prescribe what must be contained in community development statements and scheme plans (rr. 13-14; 21-26), set out permitted short form easements and restrictive covenants and their default rights and obligations (Part 6, rr. 27-56), and impose operational obligations on community corporations, scheme managers and proponents of termination proposals (Parts 10-13). They also fix fees for dealings with the Registrar of Titles and local governments (rr. 179-180; Schedule 2).
Mechanically, the instrument performs three classes of work. First, it supplies technical drafting and survey standards (r. 21-26, rr. 22-24) so that scheme plans and amendments can be prepared, certified and registered in a manner consistent with the Transfer of Land Act surveying regime (Survey Regulations). Second, it prescribes default content, processes and thresholds for governance and transactional matters under the Act: insurance minima, 10‑year reserve‑fund planning, retention periods for corporate records, voting notice content and proxy limits (rr. 75-76; 81-83; 86-89). Third, it delivers procedural detail for specialised processes under the Act , notably termination proposals (Part 13: rr. 108-155), short form easements and covenants (Part 6), scheme management contracts and scheme manager qualifications and checks (Part 11), and community development statements (Part 3).
The regulations frequently operate “for the purposes of” specific Act sections (e.g. rr. 4, 20, 62), meaning their prescriptions are intended as interpretative or implementing material for Act obligations. Several provisions allocate cost responsibility explicitly: e.g. infrastructure owners bear installation and operating costs and most maintenance responsibilities for infrastructure contracts unless the contract provides otherwise (rr. 71-72). They also create payment and disclosure regimes that shift private costs: proponents of termination proposals must establish and fund trusts to reimburse owners for advisory and representation services up to guaranteed amounts (rr. 142-147).
Current sections
Direct links to the current provisions in Community Titles Regulations 2021.
30
Part 1
Preliminary
Part 1 — Preliminary
Citation 1
Commencement 1
Terms used 1
Part 2
Provisions relating to terms used in the Act
Part 2 — Provisions relating to terms used in the Act
Requirements for approved form 3
Insurable asset 3
Key document 4
Public authority 5
Type 1 notifiable variation 5
Volunteer scheme manager 6
Part 3
Planning and development
Part 3 — Planning and development
Advertisement of community development statement by local government 7
Minimum period for comments under s. 22 8
Matters to which Planning Commission must have due regard 8
Additional content to be included in statement 9
Classes of documents that may be referred to, or incorporated in, community development statement 11
Advertisement of application to extend development period for community scheme 12
Minimum period for comments under s. 26 13
Period for making decision under s. 34(5) where amendment of community development statement required 14
Registration of amendment of community development statement 15
Part 4
Scheme documents
Part 4 — Scheme documents
Naming convention for community corporations 16
Part 5
Scheme plans
Part 5 — Scheme plans
Application of Part 17
Application of Survey Regulations to scheme plans 17
Surveyor’s certificate 18
Numbering of lots and common property 18
Requirements for identification of parcel to be subdivided 19
Requirements for scheme plan for community titles (building) scheme 19
Requirements for scheme plan for community titles (land) scheme 20
Part 6
Short form easements and restrictive covenants
Part 6 — Short form easements and restrictive covenants
Terms used 21
Div 2
Description, location and identification
Division 2 — Description, location and identification
Specified easements and short form descriptions 22
Location of easement area 23
Identification of lots and common property affected by easement 24
Permitted restrictive covenants and short form descriptions 24
Identification of lots and common property affected by restrictive covenant 25
Div 3
Other requirements
Division 3 — Other requirements
Application of Division 26
Location of covenant area 26
Persons who benefit to be specified in short form documents 26
Benefit of short form easement or restrictive covenant need not attach to land 27
Short form easement or restrictive covenant binds community corporation 27
Short form documents 27
Div 4
Rights and liabilities under short form easements
Division 4 — Rights and liabilities under short form easements
General 27
Vehicle access easement 28
Light and air easement 30
Party wall easement 31
Intrusion easement 32
Pedestrian access easement 33
Easement in gross 35
Easement for utility services 36
Entry under easement 47
Rectification of damage 47
Indemnity payable by grantee 48
Payment of consideration 48
Div 5
Rights and liabilities under short form restrictive covenants
Division 5 — Rights and liabilities under short form restrictive covenants
General 49
Right of way restrictive covenant 49
Land use restrictive covenant 50
Conservation restrictive covenant 50
Building envelope restrictive covenant 51
Fire restrictive covenant 51
Part 7
Schedule of unit entitlements
Part 7 — Schedule of unit entitlements
Determining capital value of a lot 53
Certificate by licensed valuer 54
Part 8
Scheme by‑laws
Part 8 — Scheme by‑laws
Explanation of scheme by‑laws 56
Maximum penalty for contravention of scheme by‑laws 56
Part 9
Common property infrastructure easements
Part 9 — Common property infrastructure easements
Div 1
Special procedures for notice or voting
Division 1 — Special procedures for notice or voting
Special procedures for notice to apply s. 57 to infrastructure contract 57
Division 2 — Terms and conditions taken to be implied in infrastructure contract
Application of Division 57
Planning or other approval 57
Benefits of infrastructure 58
Damage to common property 58
Maintenance of common property within easement area 58
Notice of intention to terminate where no term specified 59
Division 3 — Rights and obligations of community corporation and infrastructure owner
Application of Division 59
Rights and obligations relating to required insurance 59
Rights of infrastructure owner 60
Obligations relating to certain costs and charges 60
Obligations relating to infrastructure insurance 61
Obligations relating to changes in ownership 61
Obligation relating to removal of infrastructure 62
Part 10
Community corporations
Part 10 — Community corporations
Minimum insurance for community titles scheme 63
Requirement to have 10 year plan 63
Expenditure on common property requiring special resolution 67
Budget variations that are authorised 68
Rate of interest on contributions in arrears 68
Other records required to be kept 68
Period in which records must be retained 69
Form of records 72
Person with proper interest in information 72
Fees for applications 73
Inspection of material 74
Maximum charge for copies of material 75
Voting 75
Limitations on scheme manager being appointed as proxy 76
Agenda for general meeting 76
Part 11
Scheme managers
Part 11 — Scheme managers
Terms used 78
Division 2 — Criminal record checks
Application of Division 81
Scheme manager must obtain national criminal record checks 81
Scheme manager must give criminal record statement to community corporation 83
Division 3 — Educational and experience qualifications
Application of Division 85
Prescribed educational qualifications 85
Prescribed experience qualifications 87
Division 4 — Professional indemnity insurance
Application of Division 88
Scheme manager must obtain and maintain professional indemnity insurance 88
Division 5 — Scheme management contracts
Additional matters to be included in scheme management contract 89
Div 5A
Saving and transitional provisions
Division 5A — Saving and transitional provisions
Terms used 92
101A. Transitional provisions for compliance with educational qualification requirements 92
101B. 2025 saving provision for educational qualification requirements 93
101C. 2025 transitional provision for prescribed experience qualifications 94
101D. 2025 transitional provision for scheme management contract requirements 95
Div 6
Financial provisions relating to scheme managers
Division 6 — Financial provisions relating to scheme managers
Disclosure of remuneration and other benefits 95
Scheme manager to provide periodic return 96
Part 12
Protection of buyers
Part 12 — Protection of buyers
Further information to be given before contract 98
Information may be given by electronic means 99
Information must be in prominent position 99
Particulars of notifiable variation to be provided to buyer 99
Part 13
Termination proposals
Part 13 — Termination proposals
Terms used 102
Division 2 — Outline proposal
Details of arrangements for independent advice or representation 104
Additional information for outline proposal 104
Division 3 — Independent advocate
Subdiv 1
Persons who may be independent advocates
Subdivision 1 — Persons who may be independent advocates
Level of independence of independent advocate 105
Qualifications of independent advocate 106
Subdiv 2
Review, assessment and presentation
Subdivision 2 — Review, assessment and presentation
Assessment of proposal by independent advocate 107
Presentation by independent advocate 109
Identification of vulnerable person by independent advocate 110
Division 4 — Full proposal
Notice of completion of service 110
Tenants entitled to 5 year term 111
Additional information for full proposal 111
Person who can provide report of required works 111
Valuation methodology 111
Validity period of valuation 112
Preparation and certification of reports 112
Termination valuation report to be given to Valuer‑General 112
Division 5 — Additional procedures for dealing with termination proposals
Subdivision 1 — Meetings
Consideration of proposal at joint meeting 112
Subdivision 2 — Voting
Application of Subdivision 113
Voting notice 113
Independent vote counter 114
Provision of record of votes 114
Protection of record of votes (resolution subject to confirmation) 115
Subdiv 3
Confirmation of termination resolution
Subdivision 3 — Confirmation of termination resolution
Material to accompany application by proponent for confirmation of termination resolution 116
Information community corporation must provide to Tribunal 116
Subdiv 4
Proposals that are withdrawn or not proceeding
Subdivision 4 — Proposals that are withdrawn or not proceeding
Notice of withdrawn termination proposal 117
Notice of termination proposal not proceeding 118
Division 6 — Arrangements for independent advice or representation for owners
Subdivision 1 — Preliminary
Ancillary service 118
Subdivision 2 — Identification of persons as vulnerable
Application of Subdivision 120
Vulnerable persons 120
Independent advocate to identify vulnerable persons to proponent 122
Owner of lot may apply to be recognised as vulnerable person 122
Proponent to make decision about claim of vulnerability 122
Trustee may require information from independent advocate about type of vulnerability 124
Subdivision 3 — Establishment and terms of trust
Application of Subdivision 124
Proponent to establish trust 124
Trustee of the trust 125
Services for which trust moneys are to be provided 126
No payment for services obtained after withdrawal or notice that proposal cannot proceed 127
Guaranteed payment amount 127
Method of payment under trust 129
Period of time for making claims 129
Trust account 130
Trustee records 130
Period of time for retaining trustee records 130
Owner entitled to certain information in respect of lot 131
Summary of trust records to be given to proponent on request 131
Privacy of information 131
Winding up of trust 132
Part 14
Termination by single owner
Part 14 — Termination by single owner
Term used: single owner terminating scheme 134
Application of Part 134
Division 2 — Modification of Part 11 Division 1 of the Act
Modification of application of s. 141 134
Modification of application of s. 142 134
Modification of application of s. 145 135
Modification of application of s. 146 135
Modification of application of s. 147 136
Modification of application of s. 148 137
Division 3 — Modification of these regulations
Modification of application of r. 113 137
Modification of application of r. 142 138
Part 15
Tribunal proceedings
Part 15 — Tribunal proceedings
Division 1 — Scheme disputes
Terms used 139
Application of Division 139
Disputes relating to disclosure of information 139
Occupier disputes relating to termination proposals 139
Disputes about trustee’s performance 140
Dispute about proponent’s decision 140
Division 2 — Orders of Tribunal
Orders required to be made by legally qualified member 141
Internal review of Tribunal order 141
Part 16
Termination or amendment by compulsory acquisition
Part 16 — Termination or amendment by compulsory acquisition
Application of Part 142
Modification of s. 50 142
Modification of s. 152 142
Modification of s. 153 143
Modification of s. 155 143
Part 17
Miscellaneous
Part 17 — Miscellaneous
Fees payable to Registrar of Titles 145
Fees payable to local government 145
Sch 1
Explanation of effect of section 48
Schedule 1 — Explanation of effect of section 48
Enforcement of scheme by‑laws 148
Contents of written notice 148
People who can apply for enforcement of scheme by‑laws 149
How this could affect you 150
Recovery of moneys 150
More sections below
Source text: opening excerpt
Sourced from the Western Australian Legislation website (legislation.wa.gov.au). Not the authorised version.
Western Australia
Community Titles Act 2018
Community Titles Regulations 2021
Western Australia
Community Titles Regulations 2021
Contents
Part 1 — Preliminary
Citation 1
Commencement 1
Terms used 1
Part 2 — Provisions relating to terms used in the Act
Requirements for approved form 3
Insurable asset 3
Key document 4
Public authority 5
Type 1 notifiable variation 5
Volunteer scheme manager 6
Part 3 — Planning and development
Advertisement of community development statement by local government 7
Minimum period for comments under s. 22 8
Matters to which Planning Commission must have due regard 8
Additional content to be included in statement 9
Classes of documents that may be referred to, or incorporated in, community development statement 11
Advertisement of application to extend development period for community scheme 12
Minimum period for comments under s. 26 13
Period for making decision under s. 34(5) where amendment of community development statement required 14
Registration of amendment of community development statement 15
Part 4 — Scheme documents
Naming convention for community corporations 16
Part 5 — Scheme plans
Application of Part 17
Application of Survey Regulations to scheme plans 17
Surveyor’s certificate 18
Numbering of lots and common property 18
Requirements for identification of parcel to be subdivided 19
Requirements for scheme plan for community titles (building) scheme 19
Finally, the regulations introduce compliance and administrative obligations that generate monitoring and record‑keeping burdens: scheme managers must obtain criminal record checks and provide periodic returns to the Authority (rr. 93-94; 103), community corporations must retain a wide set of documents for prescribed periods and make them available on request (rr. 80-86; Schedule to r. 81), and trustees of termination trusts must maintain ADI trust accounts and preserve records for seven years (rr. 149-151). The instrument therefore translates high‑level Act rules into enforceable, actionable steps for landowners, scheme managers, local government and infrastructure owners.
Main concepts
The regulations operationalise a small set of central concepts from the Act and add statutory detail to their meaning. Key definitional devices are “approved form” (r. 4), “key document” (r. 6), “insurable asset” (r. 5), “short form easement” and “short form restrictive covenant” (Part 6, rr. 27-38), “scheme plan” controls linked to Survey Regulations (r. 21), and procedural categories for termination proposals including “full proposal period”, “independent advocate” and “trust” (r. 108; Part 13).
Approved form and key document: The regulations give the Registrar of Titles and the Planning Commission power to approve forms and require compliance (r. 4). For community development statements, the Planning Commission approves the form (r. 4(3)). Key documents that must be kept and disclosed are defined and include construction contracts, “as‑constructed” plans, infrastructure contracts, Building Act notices and the original 10‑year plan (r. 6). Those definitions create a focused disclosure universe and dictate what community corporations must retain under section 91/related requirements (rr. 6; 80; r. 81 schedule).
Short form easements and restrictive covenants: Part 6 creates a standard catalogue of easement types (vehicle access, light and air, party wall, intrusion, pedestrian access, easement in gross, utility services) and of restrictive covenant types (right of way, land use, conservation, building envelope, fire restrictions) (rr. 28, 31). For each short form class the regulations set default rights and liabilities , e.g. who may exercise rights, maintenance cost allocations based on unit entitlements, indemnity obligations where easements are exclusive, and entry/rectification protocols (rr. 39-56, 47-50). Short form documents can modify the defaults but cannot override the mandatory identification/location/registration rules (r. 38).
Scheme governance and financial planning: The regulations specify minimum insurance ($10 million per scheme, r. 75), detailed content for 10‑year reserve plans (r. 76), conditions for expenditure requiring special resolution (r. 77), maximum penalty for by‑law breaches ($2,000, r. 60 and Sch. 1), retention periods for corporate records (r. 81), and inspection/copying fees and processes (rr. 84-86). Scheme managers are subject to criminal record checks, education and experience standards, professional indemnity insurance minima ($1,000,000 per claim with extended cover option) and additional contractual warranty requirements in scheme management contracts (rr. 93-100).
Termination proposals: The regulations create a detailed operational regime for termination proposals, including mandatory independent advocates, trustee‑administered reimbursement trusts with guaranteed payment amounts per lot and per class of vulnerable owner (rr. 134-155), voting procedures and independent vote counters (rr. 124-129), and information disclosure obligations (rr. 109-123). They define “vulnerable person” classes and impose steps for identification, eligibility and privacy (rr. 136-140; 154).
Survey and plan formality: Scheme plans and amendments must follow Survey Regulations (r. 21), must include specific identification of parcels, lots and common property, unique numbering, and, for building schemes, clarity about boundaries, offsets and internal surfaces (rr. 22-26, 23, 25). The Registrar may renumber with notice to interested persons (r. 23(8)).
Across these concepts the regulations allocate responsibilities (who does what), set default financial allocations (who pays for maintenance or indemnities), and impose procedural steps that create timing, disclosure and documentation obligations. Where the regulations say “unless the short form document provides otherwise” or “subject to the contract”, they leave scope for private ordering within those defaults (e.g. rr. 40(6)(a), 62-66).
Who it affects
The regulations create obligations and entitlements for a defined set of actors in community titles schemes: original subdivision owners, community corporations (tier 1-3), scheme managers (including principals, scheme community managers and assistant scheme community managers), lot owners and occupiers (including vulnerable persons), infrastructure owners, local governments, the Planning Commission, the Registrar of Titles, trustees of termination proposal trusts and the Tribunal. Each actor faces different legal and administrative duties.
Community corporations: They receive numerous duties. They must keep and retain specified records and key documents for periods ranging from 7 years to “the life of the scheme” for key documents (r. 81). They are obliged to ensure insurance at the minimum level set (r. 75) and produce the first 10‑year plan at the first statutory general meeting (r. 76(8)). They must manage notices, voting schedules, independent advocate engagement and maintain scheme plans and by‑laws consistent with the Act and these regulations (rr. 10-18; 59-60; 124-131). They also have powers and liabilities regarding infrastructure contracts; for instance they can terminate an infrastructure contract where damage is caused and not remedied (r. 65).
Scheme managers and their staff: Scheme managers acquire significant compliance burdens. They must obtain national criminal record checks for themselves, directors/partners and staff who will perform scheme functions, and re‑check every three years (rr. 93-94). They are required to hold professional indemnity insurance not less than $1,000,000 per claim and an option for extended cover (r. 99). Educational and experience thresholds apply to principals, scheme community managers and assistant scheme community managers (rr. 96-97), and scheme managers must include specified warranties and disclosure obligations in their contracts (r. 100). They must lodge periodic returns with the Authority covering numbers and categories of schemes managed (r. 103).
Original subdivision owners and proponents of termination proposals: Developers and proponents face obligations to provide community development statements (r. 13), to include key documents (r. 6), and, where termination proposals are advanced, to fund independent advocacy arrangements, establish and capitalise trusts for reimbursement of owners (rr. 142-147), appoint independent vote counters and supply detailed material to the Tribunal and community corporations (rr. 126-131). The proponent also bears trust accounting and record retention duties (rr. 149-151).
Lot owners and occupiers: Owners must receive statutory pre‑contract disclosure, including notifiable variation particulars and buyers’ guides (rr. 104-107). They are the beneficiaries and contributors in various regimes: unit entitlements determine cost apportionment for easements (r. 40(7)); owners may claim guaranteed payments from a trust where a termination proposal proceeds (rr. 144-147); and owners can be identified and recognised as vulnerable persons for enhanced assistance and higher guaranteed payments (rr. 136-140; 146).
Infrastructure owners and utility providers: When infrastructure is located on common property under an infrastructure contract, the regulations place primary operating, installation, maintenance and insurance costs on infrastructure owners, subject to any alternative contractual arrangement (rr. 63-74). Infrastructure owners must obtain approvals (r. 63), maintain insurance to replacement value (r. 72), and seek community corporation consent for transfers of ownership (r. 73).
Local government and Planning Commission: Local governments must publish and advertise community development statements and extension applications for minimum periods (rr. 10, 15) and may charge fees for approvals to amend planning scheme by‑laws (r. 180). The Planning Commission approves community development statement forms and determines referral periods (r. 4; rr. 11-12).
Registrar of Titles and Tribunal: The Registrar enforces form standards, applies Survey Regulations to scheme plans, may register consolidated community development statements (r. 21; r. 18), and levies fees per Schedule 2 (r. 179). The Tribunal is referenced throughout as the dispute resolution and confirmation body for termination resolutions and by‑law enforcement, and certain orders must be made by legally qualified members (rr. 172-173).
In short, the regulations touch almost every actor in the lifecycle of community titles schemes: planning, registration, everyday management, dispute resolution, termination and post‑termination accounting. The distribution of duties is detailed, with explicit record keeping, disclosure, insurance and payment obligations creating identifiable compliance workstreams for those affected.
Key duties and rights
The regulations instantiate a set of concrete duties, powers and rights for each principal actor. Many duties are expressed as mandatory requirements “for the purposes of” specific Act sections. Below are the principal duties and corollary rights in the regulations, with the relevant provisions identified.
Scheme plans and survey duties: Scheme plans and amendments must be prepared in accordance with the Survey Regulations with specific modifications (r. 21). Surveyor certifications must be in the form required by the Licensed Surveyors regulations (r. 22). Plans must uniquely number lots and common property, identify parcels, and for building schemes show internal superficies and offsets (rr. 23-26). The Registrar may renumber after notice (r. 23(8)).
Record keeping, disclosure and inspection duties: Community corporations must keep an expanded set of records, including minutes, financial statements, contracts, key documents and infrastructure contracts, with retention periods set between seven years and “the life of the scheme” (rr. 80-81). They must provide inspection, copies and certificates on application subject to fees fixed by the regulations (rr. 84-86). The regulations identify who has a “proper interest” in obtaining information (r. 83) and set maximum application and copy fees (r. 84; r. 86).
Financial and planning duties: Community corporations must hold minimum insurance cover of $10,000,000 per scheme (r. 75) and prepare a detailed 10‑year plan covering infrastructure condition reports, funding strategies and contingent expenditure (r. 76). Significant common property expenditure requires special resolution where expenditure exceeds a threshold (r. 77). The regulations fix a maximum interest rate on arrears (11% p.a., r. 79).
Scheme manager duties: Scheme managers must obtain national criminal record checks for themselves and relevant staff and repeat them every three years (r. 93), supply statutory criminal record statements to community corporations (r. 94), ensure prescribed educational and experience qualifications for specified classes of personnel (rr. 96-97, with transitional provisions rr. 101A-101D), maintain professional indemnity insurance of not less than $1,000,000 per claim with an option for extended cover (r. 99) and include enumerated warranties and disclosure obligations in their contracts (r. 100). Scheme managers must also lodge periodic returns about the scale and makeup of their business (r. 103).
Easement and restrictive covenant rights and duties: Part 6 prescribes default rights for short form easements: who may use/access, maintenance obligations, cost apportionment by unit entitlements, indemnities where easements are exclusive, and entry/rectification rules (rr. 39-50). Short form restrictive covenants have defined content (right of way, land use, conservation, building envelope, fire restrictions) and burden/benefit rules (rr. 51-56). Short form documents can modify defaults but cannot contravene registration and identification rules (r. 38).
Infrastructure contract duties and rights: Infrastructure owners are entitled to operate and maintain infrastructure (r. 70), but must pay installation, operation and maintenance costs and relevant utility charges (r. 71). They must obtain planning approvals and insurance to replacement value unless contractually varied (rr. 63; 72). Community corporations may require infrastructure owners to take steps or pay an attributable portion of insurance premiums if required insurance is unobtainable (r. 69).
Termination proposal rights and duties: The proponent must provide an outline and full proposal with specified content (rr. 109-123). Proponents must establish a trustee‑administered trust for owner reimbursement before the full proposal period begins and ensure sufficient funds to meet guaranteed payments (rr. 142-147). Independent advocates assess proposals and hold presentations; they must protect personal information but identify vulnerable owners to the proponent in a limited form (rr. 111-115; 137). Voting procedures require appointment of an independent vote counter and strict notice periods (rr. 126-129). Trustees must keep ADI trust accounts and retain records for seven years (rr. 149-151).
Rights of owners and occupiers: Owners receive pre‑contract disclosures (buyers’ guide, notifiable variation particulars) and are entitled to claim reimbursement from termination trusts up to guaranteed amounts; vulnerable persons receive higher guaranteed payments and ancillary services (rr. 104-107; 142-147). Owners and certain other persons can apply to the Tribunal to enforce by‑laws (Sch. 1).
Registrar and Tribunal powers: The Registrar may approve forms, apply Survey Regulations, register consolidated community development statements and levy fees (rr. 4; 18; 179). The Tribunal must hear scheme disputes and certain orders require legally qualified members (rr. 172-173; Part 15).
These duties create enforceable obligations with concrete operational elements: criminal checks, insurance procurement and evidence, trust formation and ADI account maintenance, detailed plan preparation to Survey Regulations, record retention schedules, and specific notice/voting mechanics.
Penalties and enforcement
The regulations interact with the Act’s enforcement architecture by setting maxima, procedural prerequisites and mandatory notice obligations that enable administrative or Tribunal enforcement. The instrument fixes a key maximum penalty, clarifies who may apply to the Tribunal in by‑law enforcement, and prescribes procedural safeguards that feed into Tribunal review and confirmation powers.
Penalties: The regulations fix the maximum penalty the Tribunal may impose for contravention of scheme by‑laws at $2,000 (r. 60), and Schedule 1 explains recovery mechanisms. Schedule 1, paragraph 4, clarifies the circumstances where a Tribunal can impose penalties and that a daily penalty may also be authorised where regulations permit. The regulations do not themselves create additional monetary penalties beyond those referenced in the Act and Schedule 1; penalties and enforcement remain Tribunal‑centred.
Enforcement process for by‑laws: Schedule 1 sets out that a community corporation, members, mortgagees, occupiers and certain owners of special lots may apply to the Tribunal to enforce by‑laws (Sch. 1 cl. 3). It also requires written notice alleging contravention to contain specific particulars (Sch. 1 cl. 2), and links the ability to recover ordered monies to the Act’s contribution recovery machinery (Sch. 1 cl. 5).
Tribunal role in termination confirmations and disputes: The regulations expand the Tribunal’s evidence base by requiring community corporations and proponents to supply documentary material on confirmation applications (r. 130-131). They designate particular kinds of disputes as “scheme disputes” for Tribunal determination (r. 168-171), including disputes over disclosure of personal information by independent advocates and trustees (r. 168), disputes about trustee performance (r. 170) and vulnerability determinations by proponents (r. 171). For certain structural element orders in building schemes an order must be made by a legally qualified Tribunal member (r. 172).
Compliance and contractual enforcement: Many obligations are backed by contractual warranties rather than by express penalty regimes. For example, scheme managers must include warranties in scheme management contracts on criminal records checks, educational qualifications, experience and insurance (r. 100). Failure of a scheme manager to honour those warranties may give rise to contractual remedies for the community corporation and may feed Tribunal disputes under governance provisions of the Act, but the regulations do not prescribe statutory fines for such breaches.
Operational enforcement: The regulations impose administrative preconditions that enable parties to seek enforcement or to withhold steps until fees are paid , for example a local government may refuse to process an application to amend planning (scheme by‑laws) until the fee estimate is paid (r. 180(9)). In termination proposals, trustees must hold monies and keep records available to the Tribunal within seven days of notice that an application for confirmation has been made (r. 150(2)), enabling Tribunal scrutiny of trust administration.
Overall, enforcement under the regulations is a mix of Tribunal remedies (orders, penalties up to $2,000, confirmations), contractual warranties in scheme management contracts, administrative withholding powers tied to fee payment and procedural gatekeeping (e.g. evidence and retention obligations). The regulations increase the information and documentation available to enforcement bodies, and they create clear procedural triggers that enable Tribunal review.
How it interacts with other laws
The regulations are explicitly drafted to operate in the statutory network affecting land, planning, surveying, building, utilities and professional regulation. Multiple cross‑references and incorporations tie the regulations to other Western Australian statutes and Commonwealth instruments, imposing duties that rest on compliance with external regimes.
Survey and land titles law: Scheme plans and amendments are required to be prepared in accordance with the Survey Regulations (r. 21), which themselves are instruments under the Transfer of Land Act 1893 and related Licensed Surveyors regulations. Surveyor certificates must align with Licensed Surveyors (General Surveying Practice) Regulations 1961 (r. 22). The Registrar of Titles is given functions to register consolidated community development statements and apply Transfer of Land Act recording mechanisms (r. 18(1)). Schedule 2 fixes fees payable to the Registrar for lodgment, amendment and termination applications (r. 179; Sch. 2).
Planning and development law: Community development statements and extensions of development periods integrate with the Planning and Development Act 2005. Regulation 13 requires community development statements to cover staging for vesting of Crown land under s. 152 and road dedication under s. 168 of the Planning and Development Act (r. 13(1)(h)-(i)). Regulation 14 expressly allows incorporation by reference of local planning schemes, structure plans and State development area declarations under the State Development Act 2025 (r. 14). Local governments have duties of advertisement and may charge fees when exercising functions under the Planning and Development Act (rr. 10-16; r. 180).
Building law and standards: Key documents include notices of completion under the Building Act 2011 s. 33 and “as constructed” plans (r. 6(e)-(c)). Termination full proposals must incorporate certified termination infrastructure and valuation reports prepared by persons registered under the Building Services (Registration) Act 2011 where relevant (r. 119). Fire restrictive covenants are tied to AS 3959 and the Building Code of Australia (r. 56). These cross‑references require proposers, valuers and contractors to comply with building registration and practice standards external to the Community Titles framework.
Utilities and energy law: The easement for utility services borrows defined terms from the Energy Operators (Powers) Act 1979 (r. 46(1)). Easements in gross and utility service easements can benefit local governments, public authorities and utility service providers, and the regulations require infrastructure owners to obtain planning and any other statutory approvals to install and operate infrastructure (r. 63). The regulations note the difference between the statutory utility service easement provided by section 56 of the Act and the optional easement created under r. 46.
Professional regulation and criminal records: Scheme managers must obtain national criminal record checks from Western Australia Police, the AFP or an approved agency (r. 93). Educational qualifications and course references map to the National Vocational Education and Training Regulator Act 2011 and the National Register for VET courses (r. 90; r. 96). Scheme managers who are real estate licensed persons are referenced to the Real Estate and Business Agents Act 1978 (r. 90). These provisions interact with professional licensing, privacy and employment law (r. 94 on statutory declaration formats and disclosure).
Tribunal and administrative law: The Tribunal’s role is integrated into disclosure, confirmation and enforcement processes (e.g. r. 131, rr. 150, 165-173). The regulations create scheme disputes that fall to the Tribunal, and they identify which orders must be made by legally qualified Tribunal members (r. 172). Privacy protections for personal information carried by independent advocates and trustees cross‑reference the Freedom of Information Act 1992 definition of personal information (r. 108; r. 154).
Heritage and Aboriginal heritage law: Community development statements must identify registered places under the Heritage Act 2018 and Aboriginal sites under the Aboriginal Heritage Act 1972 and include management plans for potential impacts (r. 13(1)(j)-(k)). This draws planning, heritage and cultural protection law into development approvals.
Taxation and GST: The regulations adopt the GST definition from the Commonwealth A New Tax System (GST) Act 1999 (r. 3). Fees that attract GST are increased by 10% per regulations where the community corporation must remit GST (rr. 84(3); 86(3)).
In sum, the regulations are not standalone; they are a node connecting the Community Titles Act to surveying and registration law, planning, building and heritage regimes, utilities and energy law, professional regulation, taxation and Tribunal processes. Compliance therefore requires attention to standards, licences and approvals outside the Community Titles framework, and activities such as preparing plans, insurance procurement and trust administration will often have parallel legal requirements from other statutes.
Amendment history
The regulations have been amended repeatedly since initial publication in 2021, with successive instruments adding fee adjustments, procedural detail and new regulatory regimes for scheme managers and state development area references. The compilation table at the end of the instrument lists the amending instruments and commencement dates (Compilation table).
Chronology and key changes documented in the regulations themselves:
Initial enactment: Community Titles Regulations 2021, SL 2021/70 (published 18 June 2021; most regs commenced 30 June 2021). The foundational regime established forms, survey requirements, short form easements/covenants and scheme governance requirements (opening provisions and Primary Parts).
Fees and charges updates: Lands Regulations Amendment (Fees and Charges) Regulations 2022 (SL 2022/62), 2023 (SL 2023/44), 2024 (SL 2024/83) and 2025 (SL 2025/85) varied fees in Schedule 2 and related fees payable to the Registrar of Titles (r. 179; Sch. 2). Schedule 2 shows itemised fees for lodgment, plan fees, per‑lot fees and other lodgment charges; these have been adjusted by those amending instruments (Sch. 2 footnote indicates several SL changes).
Legal profession cross‑reference and other amendments (SL 2022/116): Regulation 3 updated defined terms to cross‑reference the Legal Profession Uniform Law Application Act 2022 for “local legal practitioner” (r. 3; note amending SL 2022/116 r. 4).
2023 substantive additions: Community Titles Amendment Regulations 2023 (SL 2023/51) and Community Titles Amendment Regulations (No. 2) 2023 (SL 2023/171) modified community development statement content (r. 13), and updated other procedural items (noted by amendment lines in the text).
State development and survey connections (SL 2024/50; SL 2026/12): Regulation 14 was amended to allow incorporation of State development area declarations under the State Development Act 2025 (r. 14(1)(i)). The compilation table records a State Development amendment in 2026 (SL 2026/12).
2025 package on scheme managers: Lands Regulations (Community and Strata Titles) Amendment Regulations 2025 (SL 2025/182) introduced a substantial scheme manager regulatory regime: new education and experience qualifications, transitional provisions (rr. 95-101D), expanded criminal record check and disclosure requirements (rr. 92-94), professional indemnity minimums (r. 99) and contract warranty requirements (r. 100). These 2025 amendments also introduced periodic returns (r. 103) and transitional saving provisions. The text shows multiple insertions and a saving/transitional division (Division 5A, rr. 101-101D). These are among the most significant amendments in scope.
Other 2024-2026 amendments touched survey and plan formality, fees and procedural details for planning and termination processes (various amending regs referenced in the compilation table).
The compilation table lists each amending instrument with the date published and commencement dates, enabling traceability for when particular obligations took legal effect. Key takeaways for practitioners: (i) fee amounts and filing processes have changed multiple times and should be checked against the current Schedule 2; (ii) the scheme‑manager regulatory regime was layered in with transitional arrangements for existing managers and employees; (iii) content requirements for community development statements and incorporation of State development instruments have been expanded; and (iv) survey/plan rules maintain close alignment with the Survey Regulations, which themselves are subject to change.
When advising clients, verify which amending regulations have commenced for the provision at issue , the compilation table is the canonical guide within the instrument.
Litigation history
The regulations themselves do not record judicial or Tribunal decisions. The instrument references statutory dispute‑resolution routes under the Community Titles Act 2018 and delegates functions, evidentiary requirements and items that will form part of Tribunal proceedings, but it does not cite or summarise case law. For litigation and Tribunal practice, the following points in the regulations will be especially relevant to parties and counsel:
Tribunal jurisdiction and scheme disputes: The regulations identify classes of disputes that are “scheme disputes” within the meaning of the Act, for referral to the Tribunal , including disputes about disclosure of personal information by independent advocates and trustees (r. 168), occupier disputes relating to termination proposals (r. 169), disputes about trustee performance (r. 170) and disputes about a proponent’s decision to refuse recognition of a vulnerable person (r. 171). These enumerations shape the scope of Tribunal jurisdiction and timing for applications.
Evidence and procedural conditioning for Tribunal confirmation: The regulations prescribe material that must accompany a proponent’s application to the Tribunal for confirmation of a termination resolution (r. 130), and evidence that a community corporation must provide (r. 131). Counsel litigating confirmation applications will need to ensure these documentary requirements are complied with and will likely see disputes hinge on sufficiency and integrity of the information set out in r. 130-131.
Orders requiring legally qualified members: The regulations specify that certain orders , particularly those under s. 165(2)(b) requiring reinstatement of structural elements defining building scheme lots , must be made by legally qualified Tribunal members (r. 172). This affects case allocation within the Tribunal and who will determine structural remediations.
Protective procedure for voting records: The sealed record of votes (r. 129) is designed to limit premature access to voting data pending Tribunal confirmation proceedings. Litigation arising out of termination votes may involve disputes over access to the sealed record and the conditions under which the tier 1 corporation may view or disclose it (r. 129(2)-(4)).
Trustee-related disputes and disclosure: The regulations require trustees to keep records, to provide summaries to proponents, and to disclose trust account records to the Tribunal within tight timeframes on notice (rr. 150-153). Disputes about trustee performance (r. 170) will lead to Tribunal proceedings that use the trust records as primary evidence.
By‑law enforcement and penalties: Schedule 1 sets out how Tribunal proceedings for by‑law enforcement may be commenced and the remedies available (Sch. 1). Practitioners litigating by‑law enforcement will need to account for the notice content requirements (Sch. 1 cl. 2) and the specified categories of eligible applicants (Sch. 1 cl. 3).
Because the regulations define procedural and evidentiary prerequisites for Tribunal applications, litigation practice will be heavily process‑driven. Parties should expect that failures to comply with the documentary requirements in regulations (e.g. missing independent advocate assessments, failure to lodge trust records) will be used as grounds to resist confirmations or to raise admissibility objections. The regulations do not itself list cases, and counsel will need to rely on Tribunal and court decisions interpreting the Act and these regulations in concrete disputes.
Gotchas
The regulations contain multiple detail traps and areas where failure to attend to prescribed formalities can have material consequences. Below are specific “gotchas” grounded in the text.
Approved form and electronic provision (r. 4; rr. 105-106): The Registrar and Planning Commission control approved forms (r. 4). Documents “taken to be in a form approved” include those provided in accordance with Authority website requirements (r. 4(4)). Sellers may use electronic delivery for pre‑contract information only if buyers consent or the contract is electronic (r. 105), but the seller must place required information “in a prominent position” in the contract (r. 106). Failure to display statutory pre‑contract information prominently can trigger buyer avoidance rights under the Act.
Short form easement defaults and unit entitlement cost allocation (rr. 40(6)-(7); 44(6)-(7)): Short form easements default to cost apportionment based on unit entitlements, but the prescribed proportion varies depending on whether the grantor/grantee is a lot or the common property (e.g. r. 40(7)(a)-(c)). If parties rely on the defaults, unexpected cost allocations can arise; drafters should explicitly override defaults in the short form document when a different split is intended.
Exclusive easement indemnities (r. 49): If a grantee holds an exclusive easement, the grantee must indemnify the grantor against “relevant claims.” That indemnity spans loss, damage, death or injury arising from exercise of the easement (r. 49). Exclusive Annexation without explicit indemnity modification may expose new lot owners to significant civil liability.
Termination proposal timing and trust funding (rr. 142-147; r. 116): The proponent must establish the trust before the full proposal period begins and must ensure sufficient funds to meet guaranteed payments (r. 142(2); r. 146(7)). If a proponent fails to capitalise the trust, owners’ entitlements to advisory and representation reimbursements may be at risk, and trustees must not pay claims after withdrawal/termination notices (r. 145). The proponent must also provide details of trust and trustee in outline and full proposals (rr. 109-110; r. 118).
Vulnerable person identification and privacy (rr. 112-115; 136-140; 154): The independent advocate must identify vulnerable owners and provide a list to the proponent without disclosing reasons or class details (r. 137). The trustee may request class disclosure from the independent advocate to verify eligibility for payments (r. 140). Disclosure rules are tightly circumscribed, and disputes over disclosure are classified as scheme disputes for the Tribunal (r. 168). Practitioners must navigate privacy sensitivities and statutory constraints when supporting vulnerable owners.
Scheme manager transitional and qualification traps (rr. 96-101D): New educational and experience requirements apply with transitional arrangements for persons already employed or engaged (rr. 101A-101D). Misreading transitional windows could lead to breach of contract warranties (r. 100) or to improper appointment of staff without required qualifications (r. 93-99). Contracts entered during transitional periods must include specific warranties about achieving qualifications by set dates (r. 101A).
Interaction with other approvals (r. 63; r. 46): Infrastructure contracts and easements for utility services require the infrastructure owner to obtain planning or other statutory approvals (r. 63). The presence of infrastructure on common property may make required insurance unobtainable unless the infrastructure owner takes specified action or pays an attributable portion of premium (r. 69). Failure to secure approvals and insurance can permit community corporations to terminate infrastructure contracts (r. 65).
Fees and fee estimates (r. 180; Sch. 2): Local governments can require payment of estimated fees before processing applications (r. 180(9)), and fees payable to the Registrar are itemised in Schedule 2. Practitioners must budget for per‑lot fees (Sch. 2 items 1, 2, 5) and anticipate that maximum inspection and copy fees are set ($50 for electronic copy, etc., r. 86). GST adjustments may increase fees by 10% where GST is applicable (rr. 84(3); 86(3)).
Sealed record of votes (r. 129): When a termination resolution is subject to Tribunal confirmation, the independent vote counter must supply a sealed record of votes to the tier 1 corporation, which must not inspect it except where necessary to perform statutory functions or comply with law (r. 129(2)). Mishandling or premature disclosure of sealed records can create legal exposure.
Retention periods and life‑of‑scheme records (r. 81): “Key documents” and certain scheme records must be retained for the life of the scheme (r. 81 table). Practically, this requires systems to archive and preserve documents indefinitely, which is an administrative cost and risk if historical records are scarce or were not transferred at scheme establishment.
These “gotchas” highlight the need for contemporaneous documentary discipline, early planning on capital and insurance, careful drafting of easements and scheme management contracts, and strict adherence to notice and privacy rules.
How to comply
Compliance with the regulations requires practical checklists, delegation of responsibilities and documentation controls. Below are operational steps mapped to significant regulatory duties, with references to the implementing provisions.
Forms, Registrar and Planning Commission approvals (r. 4)
Confirm the required “approved form” for any document to be lodged with the Registrar or the Planning Commission. Check the Authority’s website for Registrar‑approved formats and the Planning Commission for community development statement forms (r. 4(2)-(4)).
Maintain templates and version control for certificates, notices and scheme management contracts in the forms specified.
Survey and scheme plan preparation (rr. 21-26)
Engage licensed surveyors familiar with the Survey Regulations and the specified modifications (r. 21).
For building schemes ensure continuous lines denote structural boundaries, offsets for buildings within 2m of tier parcel boundaries, and clear statements about internal surfaces where applicable (r. 25).
Obtain the surveyor’s certificate in the prescribed form (r. 22) and prepare numbering to ensure unique lot numbers and CP numbers (r. 23).
Record keeping and information access (rr. 80-86; r. 81)
Implement a records retention system mapping documents to the retention table in r. 81, with special handling for key documents and documents required to be kept for the life of the scheme.
Establish inspection procedures, specify “specified requirements” for copying and extracts, and set fees and electronic delivery options consistent with r. 85 and r. 86.
Insurance and 10‑year planning (rr. 75-76)
Secure at least $10,000,000 per scheme for required insurance (r. 75).
Prepare a 10‑year plan that includes condition reports, funding strategy and contingency budgets following the detail in r. 76. Place the first plan before the first statutory general meeting (r. 76(8)).
Put in place a recruitment and compliance framework to obtain national criminal record checks for principals, directors and relevant staff and re‑check every three years (r. 93).
Verify and document prescribed educational and experience qualifications for staff and use transitional provisions where applicable (rr. 96-97; rr. 101A-101D).
Maintain professional indemnity insurance at $1,000,000 per claim with an option to extend cover (r. 99).
Ensure scheme management contracts incorporate the warranties and disclosure provisions listed in r. 100, and maintain documentary proof to produce on request.
Easements and restrictive covenants (Part 6)
When creating short form easements or restrictive covenants, use the specified short form descriptions and ensure the scheme plan delineates the area and identifies benefited and burdened lots in Registrar‑approved manner (rr. 28-32).
If departing from defaults (maintenance apportionment, exclusivity indemnities), record explicit contractual terms in the short form document, but ensure identification and registration requirements are met (r. 38).
Infrastructure contracts (rr. 61-74)
Infrastructure owners must obtain planning approvals and insurance, pay installation/operation costs and seek community corporation consents before transfers (rr. 63; 71-73).
Community corporations should require copies of infrastructure contracts and accompanying materials in the notice of proposed resolutions (r. 61).
Termination proposals and trust establishment (Part 13)
Proponents must prepare outline and full proposals with required content (rr. 109-123), establish a trustee and a trust account in an ADI before the full proposal period (r. 142(2); r. 149(1)).
Trustees must keep full records, make timely payments per the guaranteed payment amounts (r. 146), and retain records for seven years after winding up (rr. 150-151).
Independent advocates must be engaged independent of the proponent and referring corporation (rr. 111-112); ensure presentations are recorded and made available as required (r. 114).
Voting, meetings and independent vote counters (rr. 124-129)
Tier 1 corporations should appoint an independent vote counter before issuing voting notices (r. 127) and follow prescribed timing , voting notice at least 14 days before voting opens (r. 126(2)), and ensure voting notices contain required information (r. 126(3); r. 87 for broader voting notices).
Preserve sealed records of votes when required (r. 129), and limit access to these records strictly to the lawful grounds provided.
Fees, GST and local government charging (rr. 179-180; Sch. 2)
Budget for Registrar lodgment fees and per‑lot fees in Schedule 2, and confirm current fee levels given multiple amendments.
For local government approval fees, use the staff‑hour and operating cost methodology set out in r. 180 and obtain an estimate up front.
Privacy and information handling (rr. 112-115; r. 154)
Adopt privacy protocols for personal information handled by independent advocates and trustees, comply with consent and disclosure limitations, and treat disputes over disclosure as scheme disputes capable of Tribunal resolution (r. 168).
Practical program: build compliance checklists mapped to the regulations, assign ownership (Registrar filings, plan preparation, scheme manager HR compliance, trust administration), keep a statutory deadline calendar (advertisement and comment periods, retention start/end dates, periodic return lodgment dates), and maintain evidence bundles for Tribunal or Registrar review. Where the regulations leave space for contract variation (e.g. modification of maintenance obligations), capture agreed deviations in signed short form documents or infrastructure contracts to avoid reliance on defaults.
If advising clients, confirm which amending regulations have commenced for the relevant provision, obtain the latest Authority/Registrar instructions on approved forms, and recommend professional advisers (licensed surveyors, registered valuers, registered building service contractors, legal practitioners) as required by particular regulations (e.g. r. 119; r. 57-58).
Part 6Short form easements and restrictive covenants
Requirements for scheme plan for community titles (land) scheme 20
Part 6 — Short form easements and restrictive covenants
Division 1 — Preliminary
Terms used 21
Division 2 — Description, location and identification
Specified easements and short form descriptions 22
Location of easement area 23
Identification of lots and common property affected by easement 24
Permitted restrictive covenants and short form descriptions 24
Identification of lots and common property affected by restrictive covenant 25
Division 3 — Other requirements
Application of Division 26
Location of covenant area 26
Persons who benefit to be specified in short form documents 26
Benefit of short form easement or restrictive covenant need not attach to land 27
Short form easement or restrictive covenant binds community corporation 27
Short form documents 27
Division 4 — Rights and liabilities under short form easements
General 27
Vehicle access easement 28
Light and air easement 30
Party wall easement 31
Intrusion easement 32
Pedestrian access easement 33
Easement in gross 35
Easement for utility services 36
Entry under easement 47
Rectification of damage 47
Indemnity payable by grantee 48
Payment of consideration 48
Division 5 — Rights and liabilities under short form restrictive covenants
General 49
Right of way restrictive covenant 49
Land use restrictive covenant 50
Conservation restrictive covenant 50
Building envelope restrictive covenant 51
Fire restrictive covenant 51
Part 7 — Schedule of unit entitlements
Determining capital value of a lot 53
Certificate by licensed valuer 54
Part 8 — Scheme by‑laws
Explanation of scheme by‑laws 56
Maximum penalty for contravention of scheme by‑laws 56
Part 9 — Common property infrastructure easements
Division 1 — Special procedures for notice or voting
Special procedures for notice to apply s. 57 to infrastructure contract 57
Division 2 — Terms and conditions taken to be implied in infrastructure contract
Application of Division 57
Planning or other approval 57
Benefits of infrastructure 58
Damage to common property 58
Maintenance of common property within easement area 58
Notice of intention to terminate where no term specified 59
Division 3 — Rights and obligations of community corporation and infrastructure owner
Application of Division 59
Rights and obligations relating to required insurance 59
Rights of infrastructure owner 60
Obligations relating to certain costs and charges 60
Obligations relating to infrastructure insurance 61
Obligations relating to changes in ownership 61
Obligation relating to removal of infrastructure 62
Part 10 — Community corporations
Minimum insurance for community titles scheme 63
Requirement to have 10 year plan 63
Expenditure on common property requiring special resolution 67
Budget variations that are authorised 68
Rate of interest on contributions in arrears 68
Other records required to be kept 68
Period in which records must be retained 69
Form of records 72
Person with proper interest in information 72
Fees for applications 73
Inspection of material 74
Maximum charge for copies of material 75
Voting 75
Limitations on scheme manager being appointed as proxy 76
Agenda for general meeting 76
Part 11 — Scheme managers
Division 1 — Preliminary
Terms used 78
Division 2 — Criminal record checks
Application of Division 81
Scheme manager must obtain national criminal record checks 81
Scheme manager must give criminal record statement to community corporation 83
Division 3 — Educational and experience qualifications
Application of Division 85
Prescribed educational qualifications 85
Prescribed experience qualifications 87
Division 4 — Professional indemnity insurance
Application of Division 88
Scheme manager must obtain and maintain professional indemnity insurance 88
Division 5 — Scheme management contracts
Additional matters to be included in scheme management contract 89
Division 5A — Saving and transitional provisions
Terms used 92
101A. Transitional provisions for compliance with educational qualification requirements 92
101B. 2025 saving provision for educational qualification requirements 93
101C. 2025 transitional provision for prescribed experience qualifications 94
101D. 2025 transitional provision for scheme management contract requirements 95
Division 6 — Financial provisions relating to scheme managers
Disclosure of remuneration and other benefits 95
Scheme manager to provide periodic return 96
Part 12 — Protection of buyers
Further information to be given before contract 98
Information may be given by electronic means 99
Information must be in prominent position 99
Particulars of notifiable variation to be provided to buyer 99
Part 13 — Termination proposals
Division 1 — Preliminary
Terms used 102
Division 2 — Outline proposal
Details of arrangements for independent advice or representation 104
Additional information for outline proposal 104
Division 3 — Independent advocate
Subdivision 1 — Persons who may be independent advocates
Level of independence of independent advocate 105
Qualifications of independent advocate 106
Subdivision 2 — Review, assessment and presentation
Assessment of proposal by independent advocate 107
Presentation by independent advocate 109
Identification of vulnerable person by independent advocate 110
Division 4 — Full proposal
Notice of completion of service 110
Tenants entitled to 5 year term 111
Additional information for full proposal 111
Person who can provide report of required works 111
Valuation methodology 111
Validity period of valuation 112
Preparation and certification of reports 112
Termination valuation report to be given to Valuer‑General 112
Division 5 — Additional procedures for dealing with termination proposals
Subdivision 1 — Meetings
Consideration of proposal at joint meeting 112
Subdivision 2 — Voting
Application of Subdivision 113
Voting notice 113
Independent vote counter 114
Provision of record of votes 114
Protection of record of votes (resolution subject to confirmation) 115
Subdivision 3 — Confirmation of termination resolution
Material to accompany application by proponent for confirmation of termination resolution 116
Information community corporation must provide to Tribunal 116
Subdivision 4 — Proposals that are withdrawn or not proceeding
Notice of withdrawn termination proposal 117
Notice of termination proposal not proceeding 118
Division 6 — Arrangements for independent advice or representation for owners
Subdivision 1 — Preliminary
Ancillary service 118
Subdivision 2 — Identification of persons as vulnerable
Application of Subdivision 120
Vulnerable persons 120
Independent advocate to identify vulnerable persons to proponent 122
Owner of lot may apply to be recognised as vulnerable person 122
Proponent to make decision about claim of vulnerability 122
Trustee may require information from independent advocate about type of vulnerability 124
Subdivision 3 — Establishment and terms of trust
Application of Subdivision 124
Proponent to establish trust 124
Trustee of the trust 125
Services for which trust moneys are to be provided 126
No payment for services obtained after withdrawal or notice that proposal cannot proceed 127
Guaranteed payment amount 127
Method of payment under trust 129
Period of time for making claims 129
Trust account 130
Trustee records 130
Period of time for retaining trustee records 130
Owner entitled to certain information in respect of lot 131
Summary of trust records to be given to proponent on request 131
Privacy of information 131
Winding up of trust 132
Part 14 — Termination by single owner
Division 1 — Preliminary
Term used: single owner terminating scheme 134
Application of Part 134
Division 2 — Modification of Part 11 Division 1 of the Act
Modification of application of s. 141 134
Modification of application of s. 142 134
Modification of application of s. 145 135
Modification of application of s. 146 135
Modification of application of s. 147 136
Modification of application of s. 148 137
Division 3 — Modification of these regulations
Modification of application of r. 113 137
Modification of application of r. 142 138
Part 15 — Tribunal proceedings
Division 1 — Scheme disputes
Terms used 139
Application of Division 139
Disputes relating to disclosure of information 139
Occupier disputes relating to termination proposals 139
Disputes about trustee’s performance 140
Dispute about proponent’s decision 140
Division 2 — Orders of Tribunal
Orders required to be made by legally qualified member 141
Internal review of Tribunal order 141
Part 16 — Termination or amendment by compulsory acquisition
Application of Part 142
Modification of s. 50 142
Modification of s. 152 142
Modification of s. 153 143
Modification of s. 155 143
Part 17 — Miscellaneous
Fees payable to Registrar of Titles 145
Fees payable to local government 145
Schedule 1 — Explanation of effect of section 48
Enforcement of scheme by‑laws 148
Contents of written notice 148
People who can apply for enforcement of scheme by‑laws 149
How this could affect you 150
Recovery of moneys 150
Schedule 2 — Fees payable to Registrar of Titles
Notes
Compilation table 155
Defined terms
Community Titles Act 2018
Community Titles Regulations 2021
Part 1 — Preliminary
1. Citation
These regulations are the *Community Titles Regulations 2021*.
2. Commencement
These regulations come into operation as follows —
(a) regulations 1 and 2 — on the day on which these regulations are published in the Gazette;
(b) the rest of the regulations — on the day on which the Community Titles Act 2018 section 187 comes into operation.
3. Terms used
In these regulations —
administrator has the meaning given in the Guardianship and Administration Act 1990 section 3(1);
calendar year means a period of 12 months beginning on 1 January;
commencement day means the day on which the Community Titles Act 2018 section 187 comes into operation;
easement area has the meaning given in regulation 30(2);
guardian has the meaning given in the Guardianship and Administration Act 1990 section 3(1);
GST has the meaning given in the A New Tax System (Goods and Services Tax) Act 1999 (Commonwealth) section 195‑1;
independent advocate has the meaning given in section 146(1);
local legal practitioner has the meaning given in the Legal Profession Uniform Law Application Act 2022 section 3(1);
section means a section of the Act;
Survey Regulations means —
(a) the Licensed Surveyors (General Surveying Practice) Regulations 1961; and
(b) the Licensed Surveyors (Transfer of Land Act 1893) Regulations 1961; and
(c) the Transfer of Land (Surveys) Regulations 1995; and
(d) any other rules or regulations, including any directions, instructions or guidelines issued under any of those rules or regulations, for the time being in force for the guidance of surveyors when practising under the Transfer of Land Act 1893;
termination proposal process has the meaning given in regulation 108;
vulnerable person has the meaning given in regulation 136(1).
[Regulation 3 amended: SL 2022/116 r. 4.]
Part 2 — Provisions relating to terms used in the Act
4. Requirements for approved form
(1) This regulation applies for the purposes of the definition of approved form in section 3(1).
(2) Except as provided in subregulation (3), a document, evidence or information is in a form approved under these regulations if the document, evidence or information is in a form approved by the Registrar of Titles.
(3) A community development statement or an amendment of a community development statement is in a form approved under these regulations if the statement or amendment is in a form approved by the Planning Commission.
Note for this subregulation:
The requirement for a community development statement or an amendment of a community development statement to be in an approved form is set out in section 25(4)(a).
(4) For the purposes of subregulation (2), a document, evidence or information is taken to be in a form approved by the Registrar of Titles if it is provided in accordance with requirements specified in relation to that document, evidence or information on the website of the Authority.
5. Insurable asset
(1) For the purposes of paragraph (a)(iii) of the definition of insurable asset in section 3(1), the following are insurable assets —
(a) carpet and floor coverings that are not temporary on and within common property;
(b) buildings on the tier parcel of a community titles (building) scheme (whether or not shown on the scheme plan).
(2) For the purposes of paragraph (b)(iv) of the definition of insurable asset in section 3(1), temporary wall, floor and ceiling coverings on common property are excluded from that definition.
6. Key document
For the purposes of paragraph (l) of the definition of key document in section 3(1), the following are key documents —
(a) any contract relevant to the design or construction of buildings and improvements on the tier parcel affected by the subdivision entered into by the original subdivision owner or an associate of the original subdivision owner, including any variation to the contract;
(b) all plans and specifications relating to the contract or any variation to the contract referred to in paragraph (a);
(c) “as constructed” plans and diagrams for buildings, improvements and utility conduits on the tier parcel affected by the subdivision;
(d) any infrastructure contract or variation to an