Commercial Television Conversion Scheme 1999
107Considering the implementation plan
Start here
Get a plain-English read of 107
Turn the raw legal text into a practical explanation grounded in Commercial Television Conversion Scheme 1999.
107 Considering the implementation plan
(1) the ACMA must consider whether an implementation plan is suitable for approval, having regard to:
(2) The application must be in strict compliance with the approved application form and must have been made by the date specified under section 106.
(3) The application must deal adequately with the matters with which the holder was required to deal by the application form.
(4) Subject to subsection (8), the implementation plan must be consistent with the policy objectives in section 90 and, in particular, the policy object in paragraph 90 (i).
(5) the ACMA must have regard to the following matters in considering the policy objectives in section 90, and the proposed commercial television broadcasting service in SDTV digital mode:
(a) the technical assumptions published for subsection 91 (1);
(b) whether the proposed emission characteristics of the service are consistent with the technical specifications set out in the digital channel plan for the relevant licence area or part of the licence area;
(c) whether the proposed emission characteristics of the service are satisfactory to ensure that the median field strength of transmission beyond the licence area does not exceed the ACMA’s requirements;
(d) whether the service is likely to interfere with other services;
(e) whether the service will start on or before the start of the simulcast period;
(f) whether the policy objective will be met as soon as practicable after the start of the simulcast period;
(g) whether the holder proposes to transmit commercial television broadcasting services in analog and SDTV digital modes for the entire simulcast period;
(h) whether the holder has consulted other holders about the co‑location of the holders’ transmitters;
(i) whether the holder proposes to co‑locate its own transmitters for transmitting commercial television broadcasting services in analog and SDTV digital modes;
(j) whether the holder has access to each site and broadcasting transmission tower it is proposing to use.
Note Section 108 sets out an additional matter that applies in specific circumstances.
(6) However, if a holder has approval to submit a series of implementation plans for a licence area:
(a) the ACMA must also be satisfied that, if a plan in the series expressly or impliedly varies an earlier approved plan in the series, the variation is suitable for approval under Subdivision E of this Division; and
(b) the ACMA must have regard to the matters in subsection (5) for the whole licence area and for the part of the area to which a plan in the series relates.