10ALimitation on claims if pre-mining inspection was required
Start here
Get a plain-English read of 10A
Turn the raw legal text into a practical explanation grounded in Coal Mine Subsidence Compensation Act 2017.
#### 10A Limitation on claims if pre-mining inspection was required
10A Limitation on claims if pre-mining inspection was required
> > (1) A person is not entitled to compensation for subsidence damage to improvements or goods if—
> >
> > > (a) before the subsidence occurred, the Chief Executive required a pre-mining inspection to be carried out on the land on which the improvements or goods are located, and
> >
> > > (b) the person refused to allow the pre-mining inspection to be carried out.
>
> > (2) Subsection (1) does not apply if, on application to the Chief Executive by the person, the Chief Executive is satisfied in all the circumstances that the person should be entitled to compensation.
>
> **s 10A:** Ins 2024 No 48, Sch 1\[11\].