sch.3-sec-oc.7 Inspections during construction
Inspections during construction
If the Council is the principal certifying authority, the person having the benefit of the complying development certificate must notify the Council at least 48 hours (in writing) or 24 hours (by telephone) before an inspection is required for any of the following—
(a) erosion controls, site works and site set out, before building starts,
(b) placement of piers or foundation before placing footings,
(c) steel reinforcing before pouring concrete,
(d) framework of structure before lining or cladding is fixed,
(e) stormwater drainage and on-site detention before backfilling,
(f) wet areas treated before lining or tiling,
(g) if the development is located in an area not serviced by a reticulated sewerage system, the following additional inspections—
(i) internal and external drainage,
(ii) hot and cold water.