This local environmental plan sets zoning, permitted/prohibited land uses, subdivision rules and development consent requirements for land in Carrathool. It establishes minimum lot sizes, exempt and complying development categories, environmental overlays (biodiversity, groundwater, riparian, wetlands, flood), heritage controls and industry-specific rules for agriculture and aquaculture. It affects landowners, developers, the Council (as consent authority) and State agencies by defining what development can occur, what needs consent, and the environmental and service standards required.
Mechanically, the instrument establishes a local environmental plan for the Carrathool area by: (a) declaring the Plan’s name and commencement (it commences on publication on the NSW legislation website, cl 1.1AA); (b) identifying the land to which it applies by reference to a Land Application Map and a suite of named maps (cl 1.3; cl 1.7); (c) creating zones and a Land Use Table that specify, for each zone, objectives, development that is permitted without consent, development that is permitted only with consent, and prohibited development (Part 2, cl 2.1, cl 2.3 and the Land Use Table); (d) setting principal development standards for subdivision and dwelling entitlements (Part 4, notably cl 4.1, cl 4.1AA, cl 4.1B, cl 4.2, cl 4.2A, cl 4.2B, cl 4.2C); (e) identifying exempt and complying development and the conditions that attach to them (Part 3, cl 3.1-3.3 and Schedules 2-3); and (f) imposing a series of site- and use-specific controls in Parts 5 and 6 and in Schedules, covering heritage, biodiversity, groundwater, riparian land, wetlands, aquaculture, earthworks and other matters (for example cl 5.10 heritage, cl 6.3 terrestrial biodiversity, cl 6.4 groundwater vulnerability, cl 6.5 riparian land and watercourses, cl 5.19 and Sch 6 aquaculture).
The Plan expressly sets who decides and how decision-making is constrained. The Council is the consent authority "subject to the Act" (cl 1.6). The consent authority must have regard to zone objectives in deciding development applications (cl 2.3(2)) and must be satisfied of a number of technical matters before granting consent for particular development types (for example, cl 5.21 flood planning, cl 6.3 terrestrial biodiversity, cl 6.4 groundwater vulnerability, cl 6.5 riparian land). Where State environmental planning policies (SEPPs) prevail over the Plan, the Plan defers to the SEPP as provided by section 3.28 of the Act (cl 1.9(1)).
Current sections
Direct links to the current provisions in Carrathool Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (314), Sch 1; 2022 (596), Sch 1[2]; 2022 (830), Sch 1.8[2]; 2023 (458), Sch 2.17.
Zone RU1 Primary Production
Zone RU3 Forestry
Zone RU5 Village
Zone R5 Large Lot Residential
Zone E1 Local Centre
Zone E4 General Industrial
Zone SP2 Infrastructure
Zone C1 National Parks and Nature Reserves
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm stay accommodation; Flood mitigation works; Forestry; Freight transport facilities; Group homes; Heavy industrial storage establishments; Heavy industries; Helipads; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Jetties; Landscaping material supplies; Mooring pens; Moorings; Open cut mining; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Research stations; Roadside stalls; Rural industries; Rural workers’ dwellings; Sewerage systems; Timber yards; Transport depots; Truck depots; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note 1.
At the time this Plan was made no land in the zones listed in the Table to subclause (2) was included on the Land Reservation Acquisition Map.
Note 2.
At the time this Plan was made it did not include Zone RE1 Public Recreation.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objectives of this clause are as follows—
(a) to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land,
(b) to allow earthworks of a minor nature without requiring separate development consent.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to other development for which—
(i) development consent has been given, or
(ii) for which development consent is not required.
(3) Before granting development consent for earthworks, the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, existing drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
| Suburb | Item | Address | Property description | Significance | Item no |
| Carrathool | St. David’s Presbyterian Church | Cambridge Street | Lot 5, Section 7, DP 758231 | Local | I7 |
| Carrathool | Schoolmaster’s residence | Herriot Street | Lot 1, Section 10, DP 758231 | Local | I6 |
| Carrathool | St. George’s Anglican Church | 8 Herriot Street | Lot 3, Section 9, DP 758231 | Local | I8 |
| Carrathool | Carrathool Bridge | Main Road 244 | | State | I1 |
| Carrathool | Carrathool Cemetery | Murrumbidgee River Road | Lot 7029, DP 1054471; Lot 1, DP 668507 | Local | I2 |
| Carrathool | Groongal Homestead, water | Murrumbidgee River Road | Lot 3, DP 756 041 | Local | I3 |
| Carrathool | Howlong Homestead | Murrumbidgee River Road | Lot 4, DP 756050 | Local | I9 |
| Carrathool | Post Office (former) | Wade Street | Lot 1, Section 3, DP 517061 | Local | I4 |
| Carrathool | Railway Hotel (former) | Wade Street | Lot 6, Section 1, DP 758231 | Local | I5 |
| Erigolia | Erigolia Post Office (former) | Erigolia Road | Lot 10, Section 14, DP 758391 | Local | I10 |
| Goolgowi | Royal Mail Hotel | 1–3 Cobram Street | Lots 5 and 6, Section 5, DP 758461 | Local | I17 |
| Goolgowi | Post Office (former) | 5–7 Combo Street | Lots 3 and 4, Section 4, DP 758461 | Local | I16 |
| Goolgowi | Goolgowi Cemetery | Mid Western Highway | 33°59′15.48265″S / 145°41′54.59356″E | Local | I13 |
| Goolgowi | Goolgowi Public School | 32–48 Moira Street | Lot 1, DP 820515 | Local | I15 |
| Goolgowi | Goolgowi General Store | 3 Stipa Street | Lot 7, Section 5, DP 758461 | Local | I14 |
| Goolgowi | Council Chambers (former) | 5 Stipa Street | Lot 9, Section 5, DP 758461 | Local | I12 |
| Goolgowi | Butcher’s Shop (former) | 9 Stipa Street | Lot 11, Section 5, DP 758461 | Local | I11 |
| Groongal | Groongal Cemetery | Murrumbidgee River Road | Lot 3, DP 756041 | Local | I18 |
| Gunbar | Gunbar Station and outbuildings | Gunbar Road | Lot 1, DP 755173; Lot 7, DP 755173 | Local | I22 |
| Gunbar | Gunbar Community Hall | King Street | Lot 60, DP 905896 | Local | I20 |
| Gunbar | Gunbar Pioneer Memorial | King Street | Lot 2, Section 12, DP 759145 | Local | I21 |
| Gunbar | Gunbar Cemetery | Whealbah Road | Lots 7012 and 7013, DP 1001095; Lot 7015, DP 1001096 | Local | I19 |
| Hillston | Claremont Private Hospital | 2 Charles Street | Lot 20, Section 23, DP 257 | Local | I27 |
| Hillston | Cordatos Building | 127–129 High Street | Lot 12, Section 7, DP 257 | Local | I30 |
| Hillston | Roxy Theatre (former) | 140–144 High Street | Lot 6, Section 6, DP 257 | Local | I41 |
| Hillston | J. G. Rose and Sons Store | 146–152 High Street | Lot 1, DP 577383; Lot 2, Section 6, DP 257 | Local | I36 |
| Hillston | Club House Hotel | 147 High Street | Lot 1, DP 508224 | Local | I28 |
| Hillston | Clubhouse Dance Hall (former) | 149 High Street | Lot 2, DP 508224 | Local | I29 |
| Hillston | Morgan’s Store | 156–160 High Street | Lot 18, Section 8, DP 275 | Local | I37 |
| Hillston | Brasington’s Cash Store (former) | 161–163 High Street | Lot 23, DP 667342 | Local | I25 |
| Hillston | Nel’s Gifts and Homewares | 167 High Street | Lot 2, DP 409124 | Local | I38 |
| Hillston | Bank of New South Wales (former) | 174 High Street | Lot 10, Section 8, DP 257; Lot 10, DP 667969 | Local | I24 |
| Hillston | Hillston Municipal Chambers | 176–178 High Street | Lot 52, DP 620312 | Local | I33 |
| Hillston | Brian Lloyd Motors | 177 High Street | Lot 2, DP 105459 | Local | I26 |
| Hillston | Montague A. Hart Wool Merchants | 179 High Street | Lot 1, DP 982313 | Local | I35 |
| Hillston | Hillston Pastures Protection Board | 180 High Street | Lot 4, DP 220206 | Local | I34 |
| Hillston | Tattersalls Hotel | 185 High Street | Lot 2, DP 817810 | Local | I42 |
| Hillston | Australian Bank of Commerce | 192 High Street | Lot 20, Section 19, DP 257 | Local | I23 |
| Hillston | Nulla Nulla Homestead | 21 Keats Street | Lot 11, DP 883026 | Local | I39 |
| Hillston | Hillston Cemetery | Kidman Way | Lot 1, DP 1145024; Lot 1, DP 1149848; Lot 1, DP 1145017; Lot 1, DP 1145011; Lot 1, DP 1145036; Lot 7310, DP 1149812 | Local | I31 |
| Hillston | Old Gallery | 28 Molesworth Street | Lot 8, Section 9, DP 257 | Local | I40 |
| Hillston | Hillston Central School | 62–80 Moore Street | Lots 1–20, Section 8, DP 758521 | Local | I32 |
| Merri Merrigal | Merri Merrigal Homestead | Lachlan Valley Way | Lot 9, DP 1094023 | Local | I43 |
| Merriwagga | Blue Bird Cafe | Aix Street | Lot 4, Section 3, DP 758673 | Local | I45 |
| Merriwagga | Downey’s Black Stump Trading | Aix Street | Lot 5, Section 3, DP 758673 | Local | I46 |
| Merriwagga | Black Stump Hotel | 9 Aix Street | Lots 1 and 2, Section 4, DP 758673 | Local | I44 |
| Merriwagga | Merriwagga Cemetery | Black Stump Road | Lot 7004, DP 1115915 | Local | I47 |
| Merriwagga | St. Therese Catholic Church | Charney Street | Lots 1–9, Section 9, DP 758673 | Local | I49 |
| Merriwagga | Post Office (former) | 1 Charney Street | Lot 7, Section 5, DP 758673 | Local | I51 |
| Merriwagga | Merriwagga Public School | Marne Street | Lot 1, Section 11 DP 758673 | Local | I48 |
| Merriwagga | Uniting Church | 12–14 Marne | Lots 13–14, Section 2, DP 758673 | Local | I50 |
| Rankins Springs | Railway Station House | Bales Avenue | Lot 1, DP 809213 | Local | I55 |
| Rankins Springs | Railway turntable and water tank | | 33°50′32.17322″S / 146°15′48.52419″E; 33°50′31.91584″S / 146°15′50.22508″E | Local | I56 |
| Rankins Springs | Pioneer’s Hall | Boomerang Street | Lot 97, DP 751690 | Local | I53 |
| Rankins Springs | Rankins Springs War Memorial Hall | Boomerang Street | Lot 97, DP 751690 | Local | I60 |
| Rankins Springs | Rankins Springs Public School | Boree Street | Lot 1, Section 27, DP 758868 | Local | I59 |
| Rankins Springs | Rankins Springs Hotel Ruins | Lake Cargellico Road | Lot 1, DP 659839 | Local | I58 |
| Rankins Springs | Racecourse | Mid Western Highway | Lot 50, DP 751690 | Local | I54 |
| Rankins Springs | Rankins Springs Cemetery | Rankins Springs Road | Lot 7012, DP 1025220 | Local | I57 |
| Rankins Springs | Bush Nursing Association (former) | Urabba Street | Lots 11 and 12, Section 18, DP 758868 | Local | I52 |
| Roto | Coombie Station Homestead | Coombie Road | Lot 4574, DP 767708; Lot 2, DP 754730 | Local | I61 |
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
7
Conservation exclusion zones
7 Conservation exclusion zones
7 Conservation exclusion zones
(1) Must not be carried out on the following land, except to the extent necessary to gain access to water—
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Carrathool Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Carrathool in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to promote development that is ecologically sustainable,
(b) to promote the orderly and economic use and development of land within Carrathool,
(c) to conserve and protect rural lands which are the economic base of Carrathool and resulting rural activities and rural industries,
(d) to encourage the proper management of the natural and human-made resources of Carrathool,
(e) to minimise land use conflicts and adverse environmental impacts,
(f) to strengthen the local economic base by encouraging a range of employment-generating activities, including rural industries, which respond to emerging markets and changes in technology, whilst protecting local amenity, character and environmental values,
(g) to protect and promote the use of rural resources for agricultural and primary production and related processing services and value-adding industries,
(h) to provide a range of housing choices that match the needs of the local community,
(i) to allow for the equitable provision of social services and facilities for the community, including open space,
Several provisions change the legal effect of other instruments. Clause 1.8 repeals earlier local environmental plans that apply solely to the Plan area and ceases the application of any LEP that applied to the Plan area where those instruments also apply elsewhere (cl 1.8). Clause 1.8A preserves any development application made before the Plan’s commencement by requiring it to be determined as if the Plan had not commenced (cl 1.8A). Clause 1.9A suspends private covenants and similar instruments to the extent necessary to enable development authorised by the Plan or by consent, subject to a list of statutory exceptions and protections for public authorities’ interests (cl 1.9A(1)-(3)).
The Plan includes both positive rights (permitted uses, both without consent and with consent, in each zone) and regulatory constraints (prohibitions; development standards such as minimum lot sizes, controls on secondary and rural workers’ dwellings; heritage consent requirements). It also creates procedural and evidentiary demands: many consents must be accompanied by statements of environmental effects or heritage management documents, and certain categories require consultation with heritage or Aboriginal stakeholders (cl 5.10(5)-(9)). The Plan delegates detailed operational requirements to schedules and external instruments (for example Sch 6 for pond- and tank-based aquaculture, references to the Building Code of Australia in cl 3.1).
The Plan therefore structures land use in Carrathool by defining zones, conditioning the availability of uses, establishing technical gates for consent, and embedding cross-references to State policies and other Acts that govern specialist matters. Its mechanical effect is to replace prior local instruments for the area, impose the listed land-use and environmental controls, and make the Council the primary decision-maker under the Act’s framework.
Main concepts
The plan adopts the standard instruments and concepts used in NSW local environmental planning, with some local calibrations. Key concepts and their mechanical treatment in the text are:
Zoning and the Land Use Table: The Plan lists zones (RU1, RU3, RU5, R5, E1, E4, SP2, C1) (cl 2.1) and ties permitted/permitted-with-consent/prohibited uses to those zones through a Land Use Table (cl 2.3). The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)).
Maps as legal ascription: The Plan relies on multiple named maps (Land Zoning Map, Lot Size Map, Land Application Map, Heritage Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Wetlands Map, Groundwater Vulnerability Map, Land Reservation Acquisition Map). Those maps are adopted by the Plan and are authoritative for zone and overlay identification (cl 1.7; cl 2.2; various clauses referencing maps). Maps are to be made publicly available on the NSW Planning Portal (cl 1.7(3) and Note).
Development categories: The Plan distinguishes exempt development (Schedule 2, cl 3.1), complying development (Part 1 of Schedule 3, cl 3.2), development that requires consent, and prohibited development. Exempt and complying development remain subject to other Acts and approvals (Schedule 2 note; cl 3.1(5), cl 3.2(3)).
Subdivision and minimum lot sizes: The Plan imposes minimum lot sizes via the Lot Size Map and restricts subdivision in many circumstances to prevent fragmentation of agricultural land (cl 4.1(3); cl 4.2 rural subdivision; cl 4.2C strata subdivision prohibition). It also contains special rules for community title schemes (cl 4.1AA) and split-zone lots (cl 4.1B). Area A on the Lot Size Map contains a connection-to-sewer/water condition (cl 4.1(4A)).
Flexibility and exceptions: Clause 4.6 allows the consent authority to grant consent to developments that contravene development standards where the applicant demonstrates compliance with the "unreasonable or unnecessary" and "sufficient environmental planning grounds" tests and the consent authority records its assessment (cl 4.6(3)-(4)). The clause contains exclusions and limits about subdivisions that produce multiple undersized lots and prevents using clause 4.6 to contravene certain standards (cl 4.6(6), (8)).
Environmental overlays and site-specific controls: Parts 5 and 6 impose substantive gates by overlay: terrestrial biodiversity (cl 6.3), groundwater vulnerability (cl 6.4), riparian land and watercourses (cl 6.5), wetlands (cl 6.6), flood planning (cl 5.21). For each, the consent authority must consider listed matters and must not grant consent unless satisfied that impacts are avoided, minimised, or mitigated (standard tripartite test in cl 6.3(4), cl 6.4(4), cl 6.5(4), cl 6.6(4)).
Heritage: The Plan lists heritage items and areas (Schedule 5) and requires consent for demolition, alteration, excavation and subdivision in heritage contexts, with mandatory notification to the Heritage Council or local Aboriginal communities in particular circumstances (cl 5.10(2), (4)-(9)).
Interplay with State policy and other Acts: The Plan expressly submits to SEPPs that prevail (cl 1.9(1)), and repeatedly cross-references other NSW Acts (Heritage Act 1977, National Parks and Wildlife Act 1974, Crown Land Management Act 2016, Rural Fires Act 1997, Fisheries Management, Water Management Act 2000, Local Government Act 1993 and others) for jurisdictional overlaps and procedural requirements (various clauses).
Specific use controls: The Plan establishes use-specific quantitative limits and local definitions for bed and breakfast rooms, home business/industry floor area, industrial retail outlet retail floor area, neighbourhood shop floor area and secondary dwelling floor area (cl 5.4). There are also aquaculture design and operational constraints in Sch 6, and an express prohibition on canal estate development (cl 2.9).
Protection of musical performance at licensed premises: Clause 5.20 prevents consent authorities from refusing development for licensed premises on the basis of the genre, live/amplified nature, number of performers, dancing or stage orientation, and prevents refusal on noise grounds if noise can be managed to an acceptable level, thereby importing an operational constraint on amenity-based refusal grounds for licensed premises.
These concepts combine zoning, mapped overlays, prescriptive technical gates for environmental, heritage and infrastructure issues, and a mixture of prohibitions and quantified local limits. The Plan thereby establishes the rules of the local land-use game: what uses are possible, where, when a discretionary gate must be cleared, and which external approvals remain relevant.
Who it affects
The Plan affects a variety of actors in Carrathool and the state agencies that interact with land use:
Landowners and occupiers in the Carrathool area: Every parcel shown on the Land Application Map (cl 1.3) will have its permitted uses, subdivision potential and constraints determined by the Plan’s zoning and mapping. Owners contemplating subdivision must deal with the Lot Size Map and minimum lot-size rules (cl 4.1), special Area A sewer/water connection requirement (cl 4.1(4A)), and the strata subdivision prohibition for particular rural/residential lands (cl 4.2C).
Developers and agriculture operators: Activities such as intensive livestock agriculture, pond-based/tank-based aquaculture and rural industries are regulated by specific clauses. Intensive livestock agriculture is permitted with consent but has assessment thresholds and a limited set of small-scale activities that may be carried out without consent if located and sited appropriately (cl 5.18(3)-(5)). Pond- and tank-based aquaculture have site location and operational requirements in Sch 6 and different treatment for extensive aquaculture (cl 5.19, Sch 6). The RU1 Primary Production zone and other rural zones set the distribution of agricultural uses (cl 2.1; Land Use Table entries).
Small business and retail operators: The Plan establishes where local commercial centres and industrial land uses may be located (zones E1, E4), includes floor-area caps for neighbourhood shops and industrial retail outlets (cl 5.4(4), (7)), and permits certain retail and hospitality uses subject to zone-specific lists in the Land Use Table.
Licensed premises and live‑music operators: Clause 5.20 specifically constrains decision-makers from refusing development for licensed premises on the basis of genre, live/amplified character or associated features such as dance floors, subject to noise being manageable. This affects pubs, clubs and venues seeking changes or new licences.
Local Council: The Council is the consent authority subject to the Act (cl 1.6). The Plan defines the Council’s duties to consider overlay matters, require heritage management documents or conservation plans, and to keep records (e.g., cl 4.6(4) requires the consent authority to keep a record of its assessment when development contravenes a development standard).
Public authorities and State agencies: The Plan recognises that certain State environmental planning policies prevail (cl 1.9(1)) and that specific State agencies are the relevant acquisition authorities for certain reservation types listed on the Land Reservation Acquisition Map (cl 5.1(2) table). It also protects Crown uses (cl 5.12) and preserves public authority rights under registered instruments (cl 1.9A(3)).
Aboriginal communities, Heritage Council and other consultees: Heritage and Aboriginal places are subject to required notifications and consultations (cl 5.10(7)-(9)). For eco-tourist facilities and other developments the consent authority must consider connection to ecological/cultural values and may require management strategies (cl 5.13).
Neighbouring landowners and the community: The Plan contains multiple amenity- and risk-based protections where development could affect adjoining land, including flood planning (cl 5.21), riparian protection (cl 6.5), terrestrial biodiversity (cl 6.3) and limitations on temporary uses (cl 2.8). Residents are affected by the Plan’s floor-area caps and controls on noise/nuisance conflicts.
Holders of private agreements and covenants: Clause 1.9A suspends covenants and similar instruments to the extent necessary to enable development in accordance with the Plan or a consent granted under the Act, subject to a list of exclusions (cl 1.9A(1)-(2)). Owners with covenants (other than those carved out by the clause) should note the limited suspension and the exceptions.
Utilities and infrastructure providers: Essential services conditions (cl 6.7) require the consent authority to be satisfied that water, electricity, sewerage disposal, stormwater management and road access are available or adequate arrangements exist. This affects the delivery timetable and costs of proposed development.
Each of these groups will face different compliance issues and siloed costs. For example, an agricultural operator seeking to scale an intensive enterprise must navigate cl 5.18’s siting limits, statement-of-effects expectations and potential need for consents, whereas a licensed premises seeking to add live music has a statutory protection in cl 5.20 but will still need to demonstrate noise can be managed.
Key duties and rights
The Plan assigns duties primarily to the consent authority (the Council) and prescribes obligations and entitlements for applicants and landowners. The key duties and rights include:
Duties on the consent authority (Council)
Apply zone objectives: The consent authority must have regard to the objectives for development in a zone when determining a development application (cl 2.3(2)). This is a mandatory evaluative obligation that structures discretionary decision-making.
Assess environmental overlays: For land identified on overlay maps, the consent authority must consider specified criteria and may not grant consent unless satisfied that impacts are avoided, minimised or mitigated (examples: cl 6.3 terrestrial biodiversity(3)-(4); cl 6.4 groundwater vulnerability(3)-(4); cl 6.5 riparian land(3)-(4); cl 6.6 wetlands(3)-(4)).
Keep records where standards are varied: Where the consent authority relies on cl 4.6 to permit a contravention of a development standard, it must keep a record of its assessment (cl 4.6(4)).
Notify statutory bodies in heritage contexts: For archaeological sites not on the State Heritage Register, the consent authority must notify the Heritage Council and consider any response within 28 days (cl 5.10(7)). For Aboriginal places of heritage significance, Aboriginal communities must be notified and responses considered (cl 5.10(8)). For nominated State heritage items, the Heritage Council must be notified prior to any consent to demolition (cl 5.10(9)).
Test consents against specific controls: The consent authority must satisfy statutory gates for special uses: e.g., it must not grant consent for temporary use beyond the 52-day cap unless satisfied of certain matters (cl 2.8(2)-(3)); it must be satisfied about flood compatibility before consenting in a flood planning area (cl 5.21(2)).
Duties on applicants and proponents
Provide technical documentation: Exempt/compliant development and development that may contravene standards require supporting evidence, including compliance with the Building Code of Australia (cl 3.1(3)(a)), statements of environmental effects for artificial waterbodies (cl 5.17(4)(a)) and sufficient information for intensive livestock agriculture proposals (cl 5.18(3)(a)).
Observe local quantitative limits: Applicants for uses such as bed and breakfast, home business, home industry, industrial retail outlets, kiosks, neighbourhood shops and secondary dwellings must design proposals within the specified room/area caps (cl 5.4(1)-(9)).
Comply with heritage constraints: Any proposal involving a heritage item, Aboriginal object, archaeological site or heritage conservation area must secure consent for demolition, major alteration, excavation or subdivision unless the consent authority advises that the work is minor or maintenance (cl 5.10(2)-(3)).
Rights and entitlements for landowners
Entitlement to permitted uses: Where a use is listed as "permitted without consent" in the Land Use Table, it can be carried out without development consent, subject to other legal requirements (cl 2.3(1)(b) and the note to Schedule 2).
Exemption and complying development: Where development meets the criteria in Schedule 2 (exempt) or Part 1 of Schedule 3 (complying), applicants can proceed without a development consent, although other statutory approvals may still be required (cl 3.1(2)-(5); cl 3.2(2)-(4); Schedule 2 note).
Right to temporary use: The Plan allows development consent to be granted for temporary uses up to 52 days per 12 months (cl 2.8(2)), with specific satisfactions the consent authority must have (cl 2.8(3)).
Protection for live music at licensed premises: The Plan prohibits refusal of consent to licensed premises on enumerated grounds related to the playing/performance of music, dancing or stage orientation, and forbids refusal on noise grounds if noise can be managed (cl 5.20(1)-(2)). This is an entitlement that removes certain grounds of refusal.
Other procedural duties and limits
Suspension of covenants subject to carve-outs: Clause 1.9A duty-mechanism suspends private instruments to the extent necessary to permit Plan-consistent development, but preserves Council-imposed covenants and a list of statutory instruments and public authority rights (cl 1.9A(1)-(3)).
Deference to State instruments: The Plan is subject to any SEPP that prevails under section 3.28 of the Act (cl 1.9(1)). Practically, this means some consents, development types or standards may be governed by higher-order SEPP rules.
Overall, duties fall heavily on the consent authority to exercise judgment informed by the Plan’s objectives, overlay tests and external statutory triggers. Applicants carry the burden of satisfying technical and documentary requirements and of designing within specified quantitative caps. The Plan both limits and enables rights: it creates entitlements to certain permitted uses, but it also imposes procedural gates and overlay constraints that condition the exercise of those rights.
Penalties and enforcement
The Plan itself sets out regulatory gates (consent requirements, prohibitions, overlay tests) but does not specify monetary penalties or enforcement mechanics in the text provided. Instead, enforcement and sanctioning rely on the framework of the Environmental Planning and Assessment Act and associated regulations, which the Plan repeatedly references as the governing Act for consent processes (for example, the Plan repeatedly uses "with development consent under the Act" and refers to the Act in cl 1.6 and elsewhere). The Plan therefore creates the legal preconditions that activate the Act’s enforcement machinery rather than specifying penalties or enforcement procedures directly.
What the Plan does specify that is relevant to enforcement:
Prohibition of certain acts without consent: Several activities are expressly made consent-triggering or prohibited without consent (for example demolition of a building or work may be carried out only with development consent, cl 2.7; subdivision requires consent, cl 2.6; canal estate development is prohibited, cl 2.9).
Conditions and caps that, if breached, change the legal status of development: Development listed as "permitted without consent" is nonetheless subject to Part 5 of the Act for environmental assessment and approval requirements (note to cl 2.3 and Schedule 2 note). Exempt or complying development must meet specified standards; failure to comply will remove the exemption and trigger the need for consent and the Act’s enforcement options (cl 3.1(2)-(5); cl 3.2(2)-(4)).
Duty of consent authority to keep records and make assessments when standards are varied: The consent authority must keep a record when it permits a contravention under cl 4.6(4); failure to properly record or apply the statutory test could be relevant in any subsequent compliance action or review.
Enforcement mechanisms that will therefore be relevant in practice (but are properties of the Act and regulations rather than of the Plan text):
Administrative remedies under the Act (orders to remediate or to stop development, refusal to accept or to grant consent where prerequisites are not met).
Judicial review: Decisions of the consent authority may be susceptible to review under the Act’s judicial review or merits review paths (the Plan requires record-keeping and prescribes mandatory matters for assessment that are common grounds for administrative review).
Civil remedies and private law claims: Development undertaken inconsistent with statutory consent or in breach of covenants (subject to cl 1.9A exceptions) may expose landowners to private claims or enforcement by other agencies.
Practical enforcement risks and compliance friction, as drawn from the Plan:
Overlap of statutes and approvals: Multiple other Acts are referenced (Heritage Act 1977, National Parks and Wildlife Act 1974, Crown Land Management Act 2016, Local Land Services Act 2013, Water Management Act 2000, Protection of the Environment Operations Act 1997, Rural Fires Act 1997, Fisheries Management Act 1994). Failure to secure a licence, approval or authority under those Acts can render a development non-compliant even if the Plan’s permissions are satisfied (e.g., cl 5.17(4)(b)).
Procedural non-compliance: Many provisions require consultation and statutory waiting periods (e.g., the 28-day period for Heritage Council or Aboriginal community responses, cl 5.10(7)-(9)). Failure to follow those steps exposes an application to challenge.
Variations from development standards (cl 4.6): The clause creates flexibility but also requires the consent authority to be satisfied on specified tests and to keep records; inadequate reasoning or record-keeping increases the risk of successful challenge.
In short, the Plan sets the substantive and procedural regime; enforcement is exercised under the Act and other statutory regimes. Practitioners should therefore treat the Plan as defining what approvals and procedural steps are necessary, and expect enforcement to flow from non‑observance of those consents and conditions via the primary environmental planning framework.
How it interacts with other laws
The Plan is interwoven with multiple State-level instruments and specific Acts. The text repeatedly delegates or defers to external laws for particular functions and safeguards. The key interaction mechanisms and consequences are:
Supremacy of State environmental planning policies (SEPPs): Clause 1.9(1) expressly provides that the Plan is subject to any SEPP that prevails over it under section 3.28 of the Act. Mechanically, where a SEPP contains a provision that operates to the contrary of this Plan and is applied via s 3.28 of the Act, the SEPP will prevail. The Plan therefore operates within a hierarchy that can override or modify local rules.
Interlocking with the Environmental Planning and Assessment Act: The Plan is framed as an environmental planning instrument made under the Act. Consent processes, the categories of exempt and complying development, and the role of the consent authority are governed by the Act and its regulations. For example, the Plan notes that exempt development is still subject to the environmental assessment and approval requirements of Part 5 of the Act (cl 2.3 note).
Heritage law: The Plan adopts heritage procedural duties that interact with the Heritage Act 1977 and the Heritage Council’s role. Clause 5.10 requires notification to the Heritage Council in specified circumstances (cl 5.10(7), (9)) and allows the consent authority to condition consent in ways that require heritage conservation management plans (cl 5.10(5)-(6)). This creates a statutory bridge between the local approval and State heritage processes.
Crown land and public authority instruments: Clause 1.9A suspends private covenants to allow Plan-consistent development but expressly excludes instruments within the meaning of s 13.4 of the Crown Land Management Act 2016, conservation agreements under the National Parks and Wildlife Act 1974, Trust agreements, property vegetation plans, biobanking agreements and planning agreements (cl 1.9A(2)). It also preserves the rights of public authorities under registered instruments (cl 1.9A(3)). Thus the Plan will not displace many statutory landholding constraints.
Local Government Act classification: Clause 5.2 uses the Local Government Act 1993 to enable the Council to classify or reclassify public land as operational or community land, and notes that reclassification may discharge trusts under section 30 of the Local Government Act (cl 5.2(1)-(5)). Clause 5.1 uses the Land Acquisition (Just Terms Compensation) Act 1991 to identify acquisition authorities for various reserve types (cl 5.1).
Sectoral Acts and regulation of specific activities: The Plan cross-references the Fisheries Management Act, Water Management Act, Rural Fires Act, Protection of the Environment Operations Act and the Local Land Services Act among others when imposing development gates. Clauses such as cl 5.17 (artificial waterbodies) and cl 5.19 (aquaculture) explicitly require the consent authority to consider licences, approvals, or exemptions under other legislation (cl 5.17(4)(b)-(c); cl 5.19(2)(a)).
BASIX and building regulation: Clause 4.6(8)(b) excludes BASIX commitment-related development standards from the clause’s capacity to be varied, linking the Plan to the State’s building sustainability scheme. Additionally, cl 3.1 ties exempt development to the Building Code of Australia requirements.
Exempt/compliant development policy linkages: The Plan’s Schedules 2 and 3 are explicitly supplementary to the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 which has state-wide application (SCHEDULE 2 note; cl 3.2 note; Sch 3 general conditions referencing the Policy’s Schedule 6). This requires practitioners to consult the SEPP alongside the local Schedules.
Mechanically, where the Plan is silent, the Act and SEPPs fill the gaps. Where the Plan imposes additional constraints, those constraints must be met in addition to any State obligations. Practically, this necessitates a multi‑instrument clearance path for many developments: local Plan compliance, SEPP compliance (or application of SEPP where it prevails), compliance with broader Acts (heritage, water, fisheries, bushfire), and building code compliance. The Plan therefore functions within a layered legal environment rather than in isolation.
Amendment history
The instrument contains several recorded amendments and repeals within the text. The text itself records the following local amendment notes and repeals (these are the citations that appear in the Plan):
Clause 1.8A (Savings for development applications) , the clause carries the amendment note: "cl 1.8A: Am 2019 (621), Sch 5[1]". This indicates the savings provision was inserted or amended by an instrument in 2019 (No. 621), Schedule 5 item [1].
Clause 1.9A (Suspension of covenants, agreements and instruments) , the clause carries the amendment note: "cl 1.9A: Am 2019 (621), Sch 5[2]-[4]". This shows the suspension measure was amended or added by the same 2019 instrument, Schedule 5 items [2]-[4].
Clause 2.1 (Land use zones) , the clause records multiple amendments: "cl 2.1: Am 2022 (596), Sch 1[1]; 2022 (830), Sch 1.8[1]; 2024 (42), Sch 1.11." This indicates iterative amendments to the list or categories of zones across 2022 and 2024 instruments.
The Land Use Table overall carries an amendment note listing several instruments and years: "Land Use tbl: Am 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (314), Sch 1; 2022 (596), Sch 1[2]; 2022 (830), Sch 1.8[2]; 2023 (458), Sch 2.17." This demonstrates multiple adjustments to permissible uses and zone entries across 2017-2023.
Clause 4.6 (Exceptions to development standards) , has the amendment note "cl 4.6: Am 2022 (830), Sch 1.8[3]." This reflects a substantive amendment to the clause in 2022.
Clause 5.3 (Development near zone boundaries) , includes the note "cl 5.3: Am 2022 (830), Sch 1.8[3]."
Clause 5.4 (Controls relating to miscellaneous permissible uses) , includes "cl 5.4: Am 2018 (406), Sch 1.30 [1] [2]." That captures amendments to the local numeric caps and definitions.
Clause 6.2 is recorded as repealed: "cl 6.2: Rep 2021 (225), Sch 1." The Plan therefore had a clause 6.2 that was repealed in 2021 by instrument 225, Schedule 1.
Clause 6.7 (Essential services) , includes "cl 6.7: Am 2022 (830), Sch 1.8[4]."
Clause 6.8 (Location of sex services premises) , includes "cl 6.8: Am 2017 (493), Sch 1.2 [1]."
Clause 1.7 and other mapping provisions include notes referencing Standard technical requirements for LEP maps which are external documents available on the Department’s website (cl 1.7 Note). These are not amendments of the Plan itself but indicate external technical standards that maps must meet.
Several clauses are marked as "[Not adopted]" (for example cl 4.3 height of buildings; cl 4.4 floor space ratio; cl 4.5 calculation of FSR and site area; cl 5.6 architectural roof features; cl 5.7 development below mean high water mark) indicating the Plan elects not to adopt certain model clauses and that these remain absent rather than amended.
These amendment notes function as the Plan’s in-text amendment history. They identify the amending instrument (by year and schedule citation) and therefore provide the primary breadcrumb trail for identifying how the Plan’s content changed over time. Practitioners wanting the full statutory history would need to consult the amending instruments referred to in the schedule citations (for example, the 2019 (621) amending instrument, the 2022 (830) instrument and the 2024 (42) instrument) and the legislative database for the actual texts of those amending instruments.
No other historical detail, such as explanatory memoranda or second-reading speeches, is included in the Plan text provided. The Plan does, however, note where particular parts of its content interact with State policies or external technical documents that also evolve (for example the Department’s map technical requirements, the Considering Flooding in Land Use Planning Guideline referenced in cl 5.21(4), and the NSW Oyster Industry Sustainable Aquaculture Strategy referenced in cl 5.19(5)). Those external documents should be checked for contemporaneous updates when assessing compliance.
Litigation history
The Plan text contains no citations to cases, tribunal decisions, or judicial determinations. There is therefore no litigation history recorded in the instrument itself. That said, the Plan creates multiple decision points and prescribed satisfactions that, in general planning practice, can be the subject of merits or judicial review in the proper forum under the Act. The Plan’s text indicates several loci where disputes are most likely to arise or where legal challenge risk is heightened:
Discretionary variations to standards: Clause 4.6 permits contraventions of development standards where the consent authority is satisfied of specified tests and requires the authority to keep a record of the assessment (cl 4.6(3)-(4)). In analogous planning contexts, such discretionary exercises are commonly litigated on grounds of error of law, failure to apply the statutory test, or inadequate reasons. The Plan’s requirement to record the assessment is a procedural control intended to reduce such risk; failure to record or to articulate proper reasoning could increase vulnerability to challenge.
Interpretation and application of mapped overlays: The Plan makes maps operational (cl 1.7; cl 2.2) and ties obligations to mapped labels such as "Biodiversity", "Wetland", "Watercourse", "Groundwater vulnerable" and "Area A" on the Lot Size Map (multiple clauses). Disputes frequently arise over map interpretation, the sufficiency of mapping evidence, or the unintended application of overlays to particular parcels. Any disagreement about the application of overlay controls (for example cl 6.3-6.6) may lead to review of the consent authority’s exercise.
Heritage and Aboriginal consultation obligations: The Plan imposes mandatory notification duties for archaeological sites and nominated State heritage items (cl 5.10(7), (9)) and requires consideration of Aboriginal community responses where Aboriginal places of heritage significance are affected (cl 5.10(8)). Inadequate consultation or procedural defects in engaging the Heritage Council or Aboriginal communities could be a ground of review.
Suspension of private covenants: Clause 1.9A suspends covenants “to the extent necessary” to enable Plan-consistent development, but excludes certain covenants and statutory instruments (cl 1.9A(1)-(3)). Conflicts between private covenant holders, landowners and the consent authority’s application of cl 1.9A could produce litigation, particularly around the scope of "to the extent necessary" and the carve-outs (Council-imposed covenants and particular statutory instruments).
Flood, biodiversity and water management assessments: The Plan requires the consent authority to consider projected climate-change impacts on flood behaviour (cl 5.21(3)(a)), cumulative groundwater impacts (cl 6.4(3)(c)), and other scientifically inflected matters. Litigation risk can turn on whether the consenting authority applied the correct scientific standard, had adequate evidence, or took required matters into account.
Although the Plan itself does not record litigation, any review of its application would occur within the Act’s dispute and review channels. Practitioners should therefore anticipate that decisions involving discretionary exercise (cl 4.6), mapping disputes, complex environmental science (cl 6.3-6.6; cl 5.21), heritage consultation (cl 5.10), or the operation of cl 1.9A (suspension of covenants) are the likely focal points of legal challenge.
Gotchas
The Plan contains several provisions that commonly produce practical surprises for practitioners, and which warrant careful attention before lodging applications or taking steps on-the-ground:
Maps are determinative and technical: Multiple rights and constraints flow from maps (Land Zoning Map, Lot Size Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Wetlands Map, Groundwater Vulnerability Map, Heritage Map, Land Reservation Acquisition Map). A proposal’s permissibility can turn on minor mapped distinctions. Practitioners must check the precise map layers on the NSW Planning Portal rather than rely on general descriptions (cl 1.7; cl 2.2; various overlay clauses).
Area A sewer/water connection requirement: Clause 4.1(4A) prevents consent for subdivision on land identified as "Area A" on the Lot Size Map unless the consent authority is satisfied that all lots will be connected to reticulated sewerage and water. This is a binary, dispositive requirement for subdivisions in that area and can block otherwise compliant plans if services are not demonstrably secured.
Savings provision for pending DAs: Clause 1.8A requires that development applications made before the Plan’s commencement and not finally determined must be determined as if the Plan had not commenced. This preserves the earlier regulatory regime for those applications and can produce mismatches between contemporaneous applications and newly lodged ones (cl 1.8A).
Suspension of covenants with many carve-outs: Clause 1.9A suspends private covenants only to the extent necessary for Plan-consistent development but explicitly excludes Council-imposed covenants and several statutory instruments (cl 1.9A(1)-(2)). Practitioners should not assume private covenants will automatically be displaced; there are several exemptions and public authority rights are preserved (cl 1.9A(3)).
No adopted building height, FSR or calculation clauses: Several model clauses are marked "[Not adopted]" including building height (cl 4.3), floor space ratio (cl 4.4) and calculation of FSR and site area (cl 4.5). Where the Plan is silent, the consent authority will rely on other instruments or discretionary assessment. This can produce uncertainty for developers used to precise local numeric controls.
Exempt or complying development still requires other approvals: Schedule 2 note and cl 3.1 emphasise that exempt development is not exempt from other statutory approvals or private law obligations (Schedule 2 note; cl 3.1(5)). Practitioners must check licences and permits under other Acts (heritage, fisheries, water, local government approvals) even where the Plan calls a development exempt.
Music and licensed premises protection is conditional: Clause 5.20 prevents refusal on enumerated musical and dancing grounds, but does not absolve an applicant of the need to show that noise can be managed to an acceptable level (cl 5.20(2)). The protection reduces one category of amenity objection as a basis for refusal but creates a converse obligation to demonstrate acceptable noise management.
Heritage notification timeframes can delay consent: For archaeological sites the consent authority must notify the Heritage Council and consider responses within 28 days (cl 5.10(7)). Similarly, Aboriginal community notification is required with a 28‑day consideration period (cl 5.10(8)). These mandatory waits can extend application timelines.
Intensive livestock and aquaculture small-scale "exempt" windows are location-dependent: Clause 5.18 permits some small-scale intensive livestock agriculture without consent only if the site is not in environmentally sensitive areas or other excluded locations and subject to minimum separation distances (cl 5.18(4)-(5)). Aquaculture Schedule 6 imposes further site and operational exclusions (Sch 6 Divisions 1-2). Practitioners must square capacity thresholds with overlay constraints.
Exceptions to standards with subdivision ceilings: Clause 4.6 allows flexibility in development standards but explicitly disallows consent under cl 4.6 where a subdivision would create two or more undersized lots or create a lot less than 90% of the minimum area specified by a standard in certain zones (cl 4.6(6)). Practitioners should not assume clemency for subdivision outcomes.
Essential services test in certain zones: Clause 6.7 prevents consent unless the consent authority is satisfied that essential services are available or adequate arrangements exist (cl 6.7(2)). This can be a practical bottleneck in RU5 Village, R5 Large Lot Residential and E4 General Industrial zones where physical services are limited.
Attention to these "gotchas" at pre‑lodgement and feasibility stages,especially careful map checks, infrastructure confirmations, heritage and Aboriginal consultation strategies, and alignment with other statutory licences,is necessary to avoid costly rework or refusal.
How to comply
To comply with the Plan’s requirements and minimise risk, adopt a staged, map‑driven, documentation-centred approach. Below is a practical compliance checklist, mapped to the Plan’s provisions:
Identify precise parcel zoning and overlays
Consult the Land Zoning Map, Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Wetlands Map and Groundwater Vulnerability Map on the NSW Planning Portal (cl 1.7; cl 2.2; overlay clauses such as cl 6.3-6.6). Confirm whether the subject land is within "Area A" on the Lot Size Map (cl 4.1(4A)), or is affected by any conservation exclusion zones in Sch 6 (Sch 6 Div 1 cl 1).
Confirm use permissibility and development pathway
Check the Land Use Table for the zone to determine if the proposed use is permitted without consent, permitted with consent, or prohibited (cl 2.3 and the Land Use Table). If the use is a candidate for exempt or complying development, confirm the exact Schedule 2 or Schedule 3 entries and any State SEPP that may apply (cl 3.1-3.2; Schedule 2 note).
For applications requiring consent, assemble required technical materials
Prepare a statement of environmental effects addressing the overlay tests and the matters listed in the Plan: biodiversity impacts (cl 6.3(3)), groundwater impacts (cl 6.4(3)), riparian impacts (cl 6.5(3)), wetlands (cl 6.6(3)), flood planning (cl 5.21(2)-(3)), and intensive livestock considerations (cl 5.18(3)).
If development involves heritage items, prepare heritage management documentation or a heritage conservation management plan if required (cl 5.10(5)-(6)); account for required notifications to the Heritage Council or Aboriginal communities (cl 5.10(7)-(9)).
For aquaculture proposals consult Sch 6 and ensure pond design, species selection and outlet screening requirements are satisfied and documented (Sch 6 Div 2 cl 2-5, cl 10-11).
Check and secure essential services and infrastructure
For zones where cl 6.7 applies (RU5, R5, E4), secure evidence that water, electricity, sewerage disposal, stormwater management and suitable road access are available or that adequate arrangements will be made (cl 6.7(2)). For subdivisions in "Area A" demonstrate reticulated sewerage and water connectivity (cl 4.1(4A)).
Pre-lodgement engagement with Council and relevant State agencies
Use pre-lodgement meetings to confirm mapping, clarify whether the proposal triggers heritage/Aboriginal notifications (cl 5.10), and whether the development is affected by SEPPs that prevail (cl 1.9).
Where cl 5.17, cl 5.19 or other clauses cross-reference licences under other Acts (Water Management Act, Fisheries, Local Land Services), identify and start any parallel licence application processes (cl 5.17(4)(b); cl 5.19(2)(a)).
Plan for mandatory consultation periods and record-keeping
Build in 28-day response windows where the Plan requires notification to the Heritage Council or local Aboriginal communities (cl 5.10(7)-(9)). If relying on a clause permitting a contravention of a development standard (cl 4.6), be prepared to provide the necessary grounds and expect the consent authority to keep a record of its assessment (cl 4.6(3)-(4)).
Design to the quantitative caps and operational controls
Ensure that bed and breakfast rooms, home-business/industry floor areas, industrial retail outlet retail area, kiosk/nbrhd shop sizes and secondary dwelling floor area are within the set limits (cl 5.4(1)-(9)). For licensed premises wishing to include live or amplified music, prepare a noise management plan demonstrating that noise will be managed to an acceptable level to rely on cl 5.20 protections.
Consider alternative compliance tracks if relevant
If the proposal contravenes a development standard, prepare an exceptions justification under cl 4.6 demonstrating that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds. Ensure documentation satisfies the requirements of the Act’s regulations for such applications (cl 4.6(3) and the note referring to the Regulation).
Respect other statutory approvals and private instruments
Confirm whether any conservation agreements, biobanking agreements, property vegetation plans, Crown instruments or planning agreements displace cl 1.9A’s suspension of covenants (cl 1.9A(2)). Even where exempt development under the Plan or a SEPP is claimed, ensure compliance with other Acts (Schedule 2 note).
Prepare for post-approval compliance
If consent is granted subject to conditions, ensure systems are in place to meet on-going management obligations (heritage conservation work, environmental monitoring required under eco‑tourism management plans cl 5.13(3)(k), monitoring under aquaculture operational requirements, cl 5.19(3) and Sch 6). Non-compliance with conditions will engage the enforcement provisions of the Act.
Practical advice for the consenting process
Start with a pre-lodgement meeting with Council supported by a map-based brief.
Commission the relevant technical studies early (flooding, biodiversity, groundwater, heritage, noise).
If the proposal sits near zone boundaries, consider cl 5.3 and prepare a cross‑zone compatibility case (cl 5.3(4)).
Where complex State licences are needed, run parallel applications and cross-check conditions (for aquaculture, water or biosecurity approvals).
For subdivision, verify existing dwelling/secondary dwelling rules and the restrictions on creating lots with existing secondary dwellings (cl 2.6(2)).
Following the Plan’s mapped rules, the specific overlay tests, the quantified use caps and the documentary tests will materially reduce the risk of refusal or post-approval compliance action. In all cases, check for prevailing SEPPs and the latest versions of the external guidance documents referenced by the Plan (for example the Considering Flooding guideline referenced in cl 5.21(4)).
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Interim Development Order No 1—Shire of Carrathool
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in sub
This is an opening excerpt, not the complete document.
Carrathool Local Environmental Plan 2012 (New South Wales) | Zoe