Carbon Credits (Carbon Farming Initiative—Reforestation and Afforestation 2.0) Methodology Determination 2015
88Calculating uncertainty for net abatement amount
Start here
Get a plain-English read of 88
Turn the raw legal text into a practical explanation grounded in Carbon Credits (Carbon Farming Initiative—Reforestation and Afforestation 2.0) Methodology Determination 2015.
88 Calculating uncertainty for net abatement amount
(1) Uncertainty for the net abatement amount for a project must be calculated as a 90% confidence interval in accordance with this section.
(2) The size of the 90% confidence interval for the net abatement amount for a project is to be calculated for the reporting period using the following formula:
| | Equation 1c |
| = | half the width of the 90% confidence interval for net abatement amount for a project for the reporting period in tonnes of CO2‑e (t CO2‑e). |
|---|---|
| = | standard error for net abatement amount for a project for the reporting period in tonnes of CO2‑e (t CO2‑e), calculated in accordance with Equation 1d. |
| = | two‑sided students t‑value for the 90% confidence level at the appropriate degrees of freedom ( ‑1), where n is the number of plots in stratum assessed during the reporting period, calculated in accordance with Equation 1e. |