Carbon Credits (Carbon Farming Initiative—Reforestation and Afforestation 2.0) Methodology Determination 2015
77Compatibility checks
Start here
Get a plain-English read of 77
Turn the raw legal text into a practical explanation grounded in Carbon Credits (Carbon Farming Initiative—Reforestation and Afforestation 2.0) Methodology Determination 2015.
77 Compatibility checks
If an allometric function is to be applied to a project tree within a stratum, the project proponent must confirm that:
(a) subject to subsection 60(3), predictor measures collected from the project tree during the full inventory or PSP assessment do not exceed the allometric data range; and
(b) the species and status of the project tree assessed during the full inventory or PSP assessment are consistent with the tree type referenced by the allometric function; and
(c) the measurement procedures used to collect predictor measures from the project tree during the full inventory or PSP assessment are the same as those used to develop the allometric dataset; and
(d) if a stratum specific function is to be applied—the project tree occurs within the same stratum from which the stratum specific function was developed.
Note: If predictor measures collected from the project tree during the full inventory or PSP assessment exceed the allometric data range, the allometric function is applicable and satisfies the compatibility checks in this section if trees above the allometric domain are treated in accordance with subsection 60(3).