Carbon Credits (Carbon Farming Initiative—Reforestation and Afforestation 2.0) Methodology Determination 2015
58How to proceed if target probable limit of error not met
Start here
Get a plain-English read of 58
Turn the raw legal text into a practical explanation grounded in Carbon Credits (Carbon Farming Initiative—Reforestation and Afforestation 2.0) Methodology Determination 2015.
58 How to proceed if target probable limit of error not met
(1) If, after conducting a full inventory, the requirement of subsection 52(2) is not met, the project proponent must:
(a) select sufficient additional TSPs to ensure that the requirements can be met, by:
(i) if there are sufficient potential plot locations left in the set from which the TSPs were drawn—selecting the additional TSPs as a subset of those locations in accordance with section 33; and
(ii) otherwise:
(A) developing and documenting an appropriate sampling plan, in accordance with Subdivision 3; and
(B) establishing an additional set of potential plot locations and selecting the additional TSPs from it in accordance with Subdivision 5; and
(b) establish plots at the associated intended location coordinates in accordance with Subdivision 6; and
(c) visit those sites and collect data in accordance with Subdivision 7; and
(d) proceed in accordance with paragraphs 23(1)(f) to (i).
(2) If, after conducting a PSP assessment, the requirement of subsection 52(2) is not met, the project proponent must conduct a full inventory in accordance with this Division.
(3) When conducting the full inventory, the project proponent:
(a) may use the PSPs as TSPs; and
(b) may use the data collected in relation to those PSPs for the full inventory.