Carbon Credits (Carbon Farming Initiative—Industrial and Commercial Emissions Reduction) Methodology Determination 2021
59Determination of certain factors and parameters
Start here
Get a plain-English read of 59
Turn the raw legal text into a practical explanation grounded in Carbon Credits (Carbon Farming Initiative—Industrial and Commercial Emissions Reduction) Methodology Determination 2021.
59 Determination of certain factors and parameters
(1) If, in the circumstances described in paragraph 11(2)(b), a factor or parameter is defined or calculated for a reporting period by reference to an instrument or writing as in force from time to time, the offsets report about the project for the reporting period must include the following information for the factor or parameter:
(a) the versions of the instrument or writing used;
(b) the start and end dates of each use;
(c) the reasons why it was not possible to define or calculate the factor or parameter by reference to the instrument or writing as in force at the end of the reporting period.
(2) If, in the circumstances described in subsection 37(3), a parameter is not worked out for a reporting period using the version of an NGER method as in force at the end of the reporting period, the offsets report about the project for the reporting period must include the following information for the parameter:
(a) the versions of the NGER method used;
(b) the start and end dates of each use;
(c) the reasons why it was not possible to use the version of the NGER method as in force at the end of the reporting period.
(3) If a parameter is determined under section 69 for the purpose of working out the carbon dioxide equivalent net abatement amount for the project for a reporting period, the offsets report about the project for the reporting period must include the following information for the parameter:
(a) the name of the parameter;
(b) the start and end dates of the non‑monitored period for which the parameter was determined;
(c) the value of the parameter and how that value was calculated;
(d) the reasons why the project proponent failed to monitor the parameter as required by the monitoring requirements.