Carbon Credits (Carbon Farming Initiative—Domestic, Commercial and Industrial Wastewater) Methodology Determination 2015
45Requirement to monitor certain parameters
Start here
Get a plain-English read of 45
Turn the raw legal text into a practical explanation grounded in Carbon Credits (Carbon Farming Initiative—Domestic, Commercial and Industrial Wastewater) Methodology Determination 2015.
45 Requirement to monitor certain parameters
(1) The project proponent must monitor all of the variable parameters used to calculate the carbon dioxide equivalent net abatement amount for a reporting period for a wastewater project, and the equipment or devices used to determine or measure those parameters, in accordance with this section`.
<table cellspacing="0" cellpadding="0" style="width:462.1pt; border-collapse:collapse"><thead><tr style="height:20.8pt"><td colspan="6" style="border-top:2.25pt solid #000000; border-bottom:2.25pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span style="font-weight:bold">Monitored Parameters</span></p></td></tr><tr style="height:54.55pt"><td style="border-top:2.25pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span style="font-weight:bold"></span></p></td><td style="border-top:2.25pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span style="font-weight:bold">Parameter</span></p></td><td style="border-top:2.25pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span style="font-weight:bold">Description</span></p></td><td style="border-top:2.25pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span style="font-weight:bold">Unit</span></p></td><td style="border-top:2.25pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span style="font-weight:bold">Measurement procedure (including frequency as required)</span></p></td><td style="border-top:2.25pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span style="font-weight:bold">Determination of parameter from measurements</span></p></td></tr></thead><tbody><tr><td style="border-top:1.5pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>1</span></p></td><td style="border-top:1.5pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; text-indent:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">Mat,w,t</span></p></td><td style="border-top:1.5pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Volume of material type w treated in anaerobic digesters at project treatment facility t</span></p></td><td style="border-top:1.5pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Kilolitres</span></p></td><td style="border-top:1.5pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Project proponent may choose from the following measurement options:</span></p><p style="margin-top:2pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>the volume of wastewater received during the reporting period as evidenced by invoices;</span></p><p style="margin-top:2pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>in accordance with appropriate measuring requirements relevant to the measurement of the material.</span></p><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—daily.</span></p></td><td style="border-top:1.5pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>2</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">Mat,t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Total volume of material treated in anaerobic digesters at project treatment facility t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Kilolitres</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Project proponent may choose from the following measurement options:</span></p><p style="margin-top:2pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>the volume of material received during the reporting period as evidenced by invoices;</span></p><p style="margin-top:2pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>in accordance with appropriate measuring requirements relevant to the measurement of the amount of the material.</span></p><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—daily.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>3</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">BG t, h</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Biogas from project treatment facility t sent to combustion device or biogas upgrading system h</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cubic metres</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Estimated under Division 2.3.6 of the NGER (Measurement) Determination.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">BG t, h</span><span> must be measured at a point at which the biogas flow is entirely biogas from project treatment facility t.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuous.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>For equation 9 (section 30), if parameter W</span><span style="font-size:6.67pt; vertical-align:sub">BG,CH4 t,h</span><span> is measured on a continuous basis, cumulative values for a time interval not greater than 1 minute must be paired to measurements of W</span><span style="font-size:6.67pt; vertical-align:sub">BG,CH4 t,h</span><span> for the same time interval.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Otherwise, cumulative measurements must be paired to measurements of W</span><span style="font-size:6.67pt; vertical-align:sub">BG,CH4t,h</span><span> that correspond to the same measurement interval.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>4</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>W</span><span style="font-size:6.67pt; vertical-align:sub">BG,CH4</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Proportion of the volume of biogas from project treatment facility</span><span style="font-style:italic"> t</span><span> sent to combustion device or biogas upgrading system </span><span style="font-style:italic">h</span><span> that is methane</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Fraction</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Estimated under Subdivision 2.3.3.2, or Division 2.3.6, of the NGER (Measurement) Determination.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuous or at least monthly.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>If monitored continuously:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>for equation 9 (section 30)—the average value for a time interval not greater than 1 minute must be paired to measurements of parameter Q</span><span style="font-size:6.67pt; vertical-align:sub">BG t, h</span><span> </span><span>for the same time interval; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>for equation 15 (section 36)—the average value for the period of 7 days before a major venting event.</span></p><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>If not monitored continuously:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>for equation 9 (section 30)—the value from the sample must be paired to the cumulative value of parameter Q</span><span style="font-size:6.67pt; vertical-align:sub">BG t, h</span><span> that is determined in the period between when the sample is taken and immediately before the next sample is taken; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>(b) for equation 15 (section 36)—the value for the most recent sample taken before the period of 7 days before a major venting event.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>5</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">EG,h</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Electricity (supplied to the electricity grid or used on site) produced by internal combustion engine h</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Megawatt hours</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Estimated under Part 6.1 of the NGER (Measurement) Determination.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuous.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Measure only the electricity produced from the combustion of wastewater biogas (not from the combustion of other fuel types).</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>6</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">F,i,t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Amount of fuel type </span><span style="font-style:italic">i</span><span> used at project treatment facility t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Tonnes, kilolitres, cubic metres or gigajoules</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Project proponent may choose from the following:</span></p><p style="margin-top:4pt; margin-left:17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:7.05pt; display:inline-block"> </span><span>estimated in accordance with Division 2.2.5, 2.3.6 or 2.4.6 of the NGER (Measurement) Determination (as appropriate to the fuel type);</span></p><p style="margin-top:4pt; margin-left:17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.49pt; display:inline-block"> </span><span>evidenced by invoices, contractual arrangements or industry metering records.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Measure only the fuel used to operate the project.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuous.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>7</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">EP</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Amount of purchased electricity used</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; line-height:115%; font-size:10pt"><span>Kilowatt hours</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Evidence by invoices, contractual arrangements or industry metering records.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>If Q</span><span style="font-size:6.67pt; vertical-align:sub">EP</span><span> is measured in gigajoules, the amount of kilowatt hours must be calculated by dividing the amount of gigajoules by the conversion factor of 0.0036.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Measure only the electricity used to operate the project.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuous.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p><p style="margin-top:4pt; margin-left:38.85pt; line-height:115%; font-size:10pt"><span></span></p><p style="margin-top:4pt; margin-left:38.85pt; line-height:115%; font-size:10pt"><span></span></p><p style="margin-top:4pt; margin-left:38.85pt; line-height:115%; font-size:10pt"><span></span></p><p style="margin-top:4pt; margin-left:38.85pt; line-height:115%; font-size:10pt"><span></span></p><p style="margin-top:4pt; margin-left:38.85pt; line-height:115%; font-size:10pt"><span></span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>8</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:3.95pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">Dig,t, n</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:3.95pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Wet weight of digestate from project treatment facility </span><span style="font-style:italic">t</span><span> treated using treatment type n</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:3.95pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Tonnes</span></p><p style="margin-top:4pt; margin-left:3.95pt; line-height:115%; font-size:10pt"><span></span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:3.95pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Measurements are undertaken in accordance with appropriate measuring requirements.</span></p><p style="margin-top:4pt; margin-left:3.95pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—when digestate is treated using treatment type n.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:3.95pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p><p style="margin-top:4pt; margin-left:3.95pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span></span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>9</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>M</span><span style="font-size:6.67pt; vertical-align:sub">Max,Dig, t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Maximum methane</span></p><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>producing capacity of digestate from project treatment facility</span><span style="font-style:italic"> t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Tonnes of methane per tonne of volatile solids</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The estimation must be made by a laboratory in accordance with </span><span style="font-style:italic">Method 6211 (2000) </span><span>or </span><span style="font-style:italic">Method 2720 (1997)</span><span> of the American Public Health Association Method or an equivalent Australian or international standard.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Samples from composite of amounts of digestate collected before being sent to an open lagoon.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Enough samples must be collected to produce a representative sample.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The samples of digestate used for the measurement must be delivered to a laboratory within 24 hours of collection and analysed in triplicate.</span></p><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>at least once a month; or</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>(b) if less frequent than once a month—on each occasion the digestate is treated in an open lagoon.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Average of all measurements made during the reporting period.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>10</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>M</span><span style="font-size:6.67pt; vertical-align:sub">Max,w</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Maximum methane producing capacity of material type w treated in anaerobic digesters</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cubic metres of methane per kilogram of volatile solids</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The estimation must be made by a laboratory in accordance with </span><span style="font-style:italic">Method 6211 (2000)</span><span> or </span><span style="font-style:italic">Method 2720 (1997) </span><span>of the American Public Health Association Method or an equivalent Australian or international standard.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The samples of material type w used for the measurement must be:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>taken concurrently with each time material type w is being treated in an anaerobic digester; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>taken before being combined with other material types and entering an anaerobic digester; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(c)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>sufficient in number to produce a representative sample.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—at least once for each month that material type w is treated in an anaerobic digester.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Average of all measurements made during the reporting period for material type w.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>11</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>VS</span><span style="font-size:6.67pt; vertical-align:sub">w,t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Amount of volatile solids from material type w treated in anaerobic digesters at project treatment facility t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Kilograms</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The estimation must be made by a laboratory in accordance with </span><span style="font-style:italic">Method 2540E</span><span> of the American Public Health Association Method or an equivalent Australian or international standard.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The samples of material type w used for the measurement must be:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>taken concurrently with each time material type w is being treated in an anaerobic digester; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>taken before being combined with other material types and entering an anaerobic digester; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(c)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>sufficient in number to produce a representative sample.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—at least once for each month that material type w is treated in an anaerobic digester.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The total amount of volatile solids of material type w treated in the reporting period must be derived by extrapolating the amount of volatile solids in the sample to the volume of material type w (see parameter Q</span><span style="font-size:6.67pt; vertical-align:sub">Mat,w</span><span>) that was treated in the time between the sample measurements.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>12</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>VS</span><span style="font-size:6.67pt; vertical-align:sub">Dig,t,q</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Volatile solids discharged from an anaerobic digester at project treatment facility </span><span style="font-style:italic">t </span><span>into open lagoon </span><span style="font-style:italic">q</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Tonnes</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Volatile solids must be measured under </span><span style="font-style:italic">Method 2540E</span><span> of the American Public Health Association Method or an equivalent Australian or international standard.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Samples from composite of amounts of digestate collected before being sent to an open lagoon.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Enough samples must be collected to produce a representative sample.</span></p><p style="margin-left:1.4pt; margin-bottom:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>at least once a month; or</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>if less frequent than once a month—on each occasion the digestate is treated in an open lagoon.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The total amount of volatile solids of digestate treated in the reporting period must be derived by extrapolating the amount of volatile solids in the sample to the wet weight of digestate material (see parameter Q</span><span style="font-size:6.67pt; vertical-align:sub">Dig,t,n</span><span>) that was treated in the lagoon in the time between the sample measurements.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>13</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>FR</span><span style="font-size:6.67pt; vertical-align:sub">q</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Average total daily flow of biogas from an anaerobic digester for the 7 days before major venting event q</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cubic metres per day</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Calculated from Q</span><span style="font-size:6.67pt; vertical-align:sub">BG t, h</span><span>, as monitored in accordance with item 3.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value of biogas sent to combustion devices in the 7 days before each major venting event, divided by 7</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>14</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>MS</span><span style="font-size:6.67pt; vertical-align:sub">BCS</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Maximum biogas storage capacity of an anaerobic digester</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cubic meters</span></p><p style="margin-top:9pt; margin-left:38.85pt; line-height:115%; font-size:10pt"><span></span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Either:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>measured directly; or</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>calculated using the manufacturer’s specifications for the anaerobic digester.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>At the following times:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>when the anaerobic digester is installed;</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>when the anaerobic digester is upgraded in a way that changes the storage capacity.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>15</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>t</span><span style="font-size:6.67pt; vertical-align:sub">q</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Number of days for all or part of which major venting event q is uncontrolled</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Whole days</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—for each major venting event.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span></span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>16</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>COD</span><span style="font-size:6.67pt; vertical-align:sub">In,Tot,l</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Total amount of chemical oxygen demand in eligible wastewater for the project entering anaerobic digesters at project treatment facility t</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Tonnes</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>For domestic or commercial wastewater—estimated consistently with determining parameter COD</span><span style="font-size:6.67pt; vertical-align:sub">wz</span><span> under Division 5.3.3 of the NGER (Measurement) Determination, with the following modifications:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>paragraphs 5.28(1)(c) and (2)(c) of that Determination are taken to be omitted;</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>parameter COD</span><span style="font-size:6.67pt; vertical-align:sub">wz</span><span> applies as if:</span></p><p style="margin-top:9pt; margin-left:23.5pt; text-indent:-5.65pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(i)</span><span style="width:8.71pt; text-indent:0pt; display:inline-block"> </span><span>a reference to “the sub facility during the year” were a reference to “the anaerobic digesters at project treatment facility</span><span style="font-style:italic"> t</span><span> in the reporting period”; and</span></p><p style="margin-top:9pt; margin-left:23.5pt; text-indent:-5.65pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(ii)</span><span style="width:5.93pt; text-indent:0pt; display:inline-block"> </span><span>a reference to “facility operating data” were a reference to “data about the operation of the anaerobic digesters at project treatment facility</span><span style="font-style:italic"> t</span><span>”.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>For industrial wastewater—estimated consistently with determining parameter COD</span><span style="font-size:6.67pt; vertical-align:sub">w,i</span><span> under Division 5.4.3 of the NGER (Measurement) Determination, with the following modifications:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>paragraphs 5.45(1)(c) and (2)(c) of that Determination are taken to be omitted;</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>parameter COD</span><span style="font-size:6.67pt; vertical-align:sub">w,i</span><span> (as described in subsection 5.43(2) of the NGER (Measurement) Determination) applies as if:</span></p><p style="margin-top:9pt; margin-left:24.95pt; text-indent:-5.65pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(i)</span><span style="width:7.26pt; text-indent:0pt; display:inline-block"> </span><span>a reference to “the plant” were a reference to “the anaerobic digesters at project treatment facility </span><span style="font-style:italic">t</span><span> in the reporting period”; and</span></p><p style="margin-top:9pt; margin-left:24.95pt; text-indent:-5.65pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(ii)</span><span style="width:4.48pt; text-indent:0pt; display:inline-block"> </span><span>a reference to “facility operating data” were a reference to “data about the operation of the anaerobic digesters at project treatment facility</span><span style="font-style:italic"> t</span><span>”.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span></span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>17</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">BM, h</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Volume of biomethane sent out by biogas upgrading system h</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>m</span><span style="font-size:6.67pt; vertical-align:super">3</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Estimated under Division 2.3.6 of the NGER (Measurement) Determination using measurement criteria AAA.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuously.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">BM, h </span><span>is to be measured at a point that is after the biomethane leaves the biogas upgrading system and at which the biomethane is suitable for combustion as a natural gas substitute.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>18</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>W</span><span style="font-size:6.67pt; vertical-align:sub">BM, CH4, h</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Proportion of the volume of biomethane from biogas upgrading system k, W</span><span style="font-size:6.67pt; vertical-align:sub">BM, h</span><span>, that is methane</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Fraction</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Measured:</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>using an inline gas analyser that analyses gas composition at a point after biogas upgrading is complete; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>to an accuracy of +/ 3% absolute; and</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(c)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>in accordance with the instrument manufacturer’s instructions and the relevant Australian and New Zealand standards.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>The measurements must be paired to measurements of Q</span><span style="font-size:6.67pt; vertical-align:sub">BM, h</span><span> for the same measurement interval.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>19</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">BG, g</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Volume of biogas sent to a project biomethane facility from biogas source facility g</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>m</span><span style="font-size:6.67pt; vertical-align:super">3</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Estimated under Division 2.3.6 of the NGER (Measurement) Determination using measurement criteria AAA.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuously.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span></span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>20</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">BG, El, g</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Volume of eligible biogas sent to a project biomethane facility from biogas source facility g</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>m</span><span style="font-size:6.67pt; vertical-align:super">3</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Estimated under Division 2.3.6 of the NGER (Measurement) Determination using measurement criteria AAA.</span></p><p style="margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuously.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">BG, El, g</span><span> must only be measured in accordance with this item if it is possible to directly measure the volume of eligible biogas sent to a project biomethane facility from biogas source facility g.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>21</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">F, displacement, m, i</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Quantity of each fuel type used by project biomethane facility </span><span style="font-style:italic">m</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; line-height:normal; font-size:10pt"><span>Either:</span></p><p style="margin-left:17.85pt; text-indent:-17.85pt; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span style="font-style:italic">t</span><span> (for solid fuel); or</span></p><p style="margin-left:17.85pt; text-indent:-17.85pt; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>m</span><span style="font-size:6.67pt; vertical-align:super">3</span><span>(for gas fuel); or</span></p><p style="margin-left:17.85pt; text-indent:-17.85pt; line-height:normal; font-size:10pt"><span>(c)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>kL (for liquid fuel); or</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(d)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>GJ</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(a)</span><span style="width:6.75pt; text-indent:0pt; display:inline-block"> </span><span>monitored in accordance with section 2.25, 2.36 or Division 2.4.6 of the NGER (Measurement) Determination (as applicable to the fuel type); or</span></p><p style="margin-top:4pt; margin-left:17.85pt; text-indent:-17.85pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>(b)</span><span style="width:6.19pt; text-indent:0pt; display:inline-block"> </span><span>evidenced by invoices, contractual arrangements or industry metering records.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuous.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p></td></tr><tr><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.55pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>22</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Q</span><span style="font-size:6.67pt; vertical-align:sub">PE, displacement, m</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Quantity of electricity purchased by project biomethane facility </span><span style="font-style:italic">m</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>kWh or GJ</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Evidenced by invoices, contractual arrangements or industry metering records.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>If Q</span><span style="font-size:6.67pt; vertical-align:sub">PE, displacement, m</span><span> is measured in gigajoules, the quantity of kilowatt hours must be calculated by dividing the amount of gigajoules by the conversion factor of 0.0036.</span></p><p style="margin-top:4pt; margin-left:1.4pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Frequency—continuous.</span></p></td><td style="border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top"><p style="margin-top:4pt; margin-left:1.35pt; page-break-inside:avoid; line-height:normal; font-size:10pt"><span>Cumulative value for the reporting period.</span></p></td></tr></tbody></table> ```