Carbon Credits (Carbon Farming Initiative—Aggregated Small Energy Users) Methodology Determination 2015
64Offsets report requirements
Start here
Get a plain-English read of 64
Turn the raw legal text into a practical explanation grounded in Carbon Credits (Carbon Farming Initiative—Aggregated Small Energy Users) Methodology Determination 2015.
64 Offsets report requirements
(1) If the offsets report about the project is for the first reporting period for the project, the report must include:
(a) the number of relevant populations in the project in the reporting period; and
(b) a description of each of those populations; and
(c) for each site in a control group or treatment group in one of those populations:
(i) an address, in the form approved by the Regulator; and
(ii) which of the control group and treatment group the site was selected for; and
(iii) which population the site is in; and
(d) a description of the goods or services that were targeted to each treatment group in one of those populations during the measurement periods in the reporting period as part of the treatment under the project.
(2) If the offsets report about the project is for the second, or a subsequent, reporting period for the project, the report must include:
(a) the following for each new site:
(i) an address, in the form approved by the Regulator;
(ii) which of the control group and treatment group the site was selected for;
(iii) which population the site is in; and
(b) a description of the goods or services that:
(i) were targeted to each treatment group in a relevant population in the project during the measurement periods in the reporting period as part of the treatment under the project; and
(ii) are different from the goods or services described in previous offsets reports for the project.
(3) If a site in a control group or treatment group in a relevant population in the project in a reporting period is affected by attrition during the reporting period, the offsets report for the reporting period must include:
(a) the address of the site; and
(b) which of the control group and treatment group the site was selected for.
(4) If the value of an explanatory variable is determined under section 74 for the purpose of working out the carbon dioxide equivalent net abatement amount for the project for a reporting period, the offsets report about the project for the reporting period must include the following information:
(a) the start and end of the non‑monitored period for which the value of the explanatory variable was determined;
(b) the reasons why the project proponent for the project failed to monitor the explanatory variable as required by the monitoring requirements;
(c) the value of the explanatory variable and how that value was determined.
(5) In this section: