Mechanically, this local environmental plan sets the zoning, permitted/prohibited uses, and development‑consent rules for land in Cabonne using maps and schedules. It prescribes minimum lot sizes, exemptions and complying development, and overlay controls for heritage, water, biodiversity, stormwater and specific industries (eg. aquaculture, intensive livestock).
The plan’s stated aims (protecting heritage, water and agricultural values while enabling arts, tourism and economic uses) shape who pays, who decides and what approvals are required: landowners and developers face consent and compliance obligations; the Council is the primary consent authority.
This instrument is a local environmental plan (Cabonne Local Environmental Plan 2012) that sets the land use framework, mapped controls and local development rules for the Cabonne local government area. Mechanically it:
Establishes the operative environmental planning instrument for the land identified on the Land Application Map (cl 1.1; cl 1.3).
Creates a zoning system and Land Use Table that specifies for each zone the objectives, uses permitted without consent, uses permitted with development consent and prohibited uses (cl 2.1; cl 2.3; Land Use Table).
Requires development consent for activities specified by the Plan, prescribes exempt or complying development where identified (Part 3, cl 3.1-3.3), and imposes principal development standards, notably minimum lot sizes for subdivisions (Part 4, cl 4.1 and related clauses).
Maps and schedules underpin the Plan: Land Zoning Map, Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map and others are referenced and declared integral to the Plan (cl 1.7; cl 1.3; multiple clauses referencing maps).
Allocates the Council as the consent authority subject to the Act (cl 1.6) and identifies state SEPP primacy where applicable (cl 1.9).
Contains a package of site-specific and use-specific rules: e.g. temporary uses capped at 52 days (cl 2.8), prohibition of canal estate development (cl 2.9), controls for aquaculture (cl 5.19 and Schedule 6), heritage controls (cl 5.10 and Schedule 5) and flood planning requirements (cl 5.21).
Includes procedural and legal bridging provisions: savings for pre-commencement development applications (cl 1.8A), suspension of covenants for development consistent with the Plan subject to listed exceptions (cl 1.9A), and rules on classification/reclassification of public land (cl 5.2; Schedule 4).
Current sections
Direct links to the current provisions in Cabonne Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (830), Sch 1.7[2]; 2023 (458), Sch 2.14.
Zone RU1 Primary Production
Zone RU2 Rural Landscape
Zone RU3 Forestry
Zone RU5 Village
Zone R1 General Residential
Zone R5 Large Lot Residential
Zone E1 Local Centre
Zone E3 Productivity Support
Zone E4 General Industrial
Zone E5 Heavy Industrial
Zone SP2 Infrastructure
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
Zone C2 Environmental Conservation
Zone W1 Natural Waterways
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Business identification signs; Camping grounds; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Function centres; Helipads; Home-based child care; Home businesses; Home industries; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Moorings; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Research stations; Restaurants or cafes; Roads; Roadside stalls; Rural industries; Truck depots; Veterinary hospitals; Water recreation structures; Water storage facilities
4
Prohibited
4 Prohibited
4 Prohibited
Stock and sale yards; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone SP2 Infrastructure and marked “Rail infrastructure facilities” | Transport for NSW |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for that land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Cabonne Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Cabonne in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage development that complements and enhances the unique character and amenity of Cabonne, including its settlements, localities, and rural areas,
(b) to provide for a range of development opportunities that contribute to the social, economic and environmental resources of Cabonne in a manner that allows present and future generations to meet their needs by implementing the principles of ecologically sustainable development,
(c) to facilitate and encourage sustainable growth and development that achieves the following—
(i) contributes to continued economic productivity, including agriculture, business, tourism, industry and other employment opportunities,
(ii) allows for the orderly growth of land uses while minimising conflict between land uses within the relevant zone and land uses within adjoining zones,
(iii) encourages a range of housing choices and densities in planned urban and rural locations that is compatible with the residential and rural environment and meets the diverse needs of the community,
(iv) promotes the integration of land uses and transport to improve access and reduce dependence on private vehicles and travel demand,
Contains a local list of heritage items and two heritage conservation areas in Schedule 5; a number of local additional permitted uses in Schedule 1; Schedule 2 and Schedule 3 are present for exempt and complying development respectively, though they are largely not populated in the printed text.
The Plan also retains a discretion architecture: many approvals “must not be granted” unless the consent authority is satisfied of a number of matters (for example flood-compatibility in cl 5.21; biodiversity considerations in cl 6.3; riparian protections in cl 6.6; groundwater vulnerability in cl 6.4). The statutory aims set out in cl 1.2 state the Plan’s policy purpose (ecologically sustainable development, protecting agricultural land, heritage and environmental values) but the operative content is the combination of mapped zones, the Land Use Table and the clause-specific consent tests and limits.
The Plan does not itself specify criminal penalties or infringement amounts; enforcement of unauthorised development and imposition of penalties is a function of the Environmental Planning and Assessment Act 1979 and associated regulations (the Plan repeatedly operates “subject to the Act”, e.g. cl 1.6; cl 1.9). The Plan is amended from time to time; amendment notes are embedded in the text (see “Am” and “Ins” references in many clauses).
Main concepts
The Plan rests on a small set of organising legal tools and maps. These are the main concepts that govern development under the Plan:
Zoning and objectives: zones (cl 2.1) , RU, R, E, SP, RE, C and W categories , each carries objectives and a Land Use Table entry that categorises development as permitted without consent, permitted with consent or prohibited (cl 2.3 and the Land Use Table). The consent authority is required to have regard to zone objectives when determining applications (cl 2.3(2)).
Mapped controls: the Plan’s maps (Land Zoning Map, Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Groundwater Vulnerability Map, Drinking Water Catchment Map and others) are operative and integrated into the decision-making rules for minimum lot sizes (cl 4.1), biodiversity (cl 6.3), riparian setbacks (cl 6.6) and similar provisions. Clause 1.7(1)(a)-(b) requires named maps to be those approved when the map was adopted and as amended.
Development consent architecture: the Plan distinguishes three procedural pathways:
Exempt development (cl 3.1): development of minimal environmental impact specified in Schedule 2 and meeting the Schedule’s standards is exempt; exempt development remains subject to other statutes and approvals (cl 3.1(2) and Note 2).
Complying development (cl 3.2): specified in Schedule 3 and in the State SEPP governing exempt/complying development; permitted where the development complies with development standards and other statutory requirements.
Development requiring consent: the Land Use Table and numerous clauses make particular uses consent-required (cl 2.3(1)(c)).
Development standards and exceptions: Principal standards include minimum subdivision lot sizes (cl 4.1 and related clauses 4.1AA, 4.1A). Clause 4.6 allows limited flexibility to grant consent where a development would contravene a development standard, but imposes a procedural requirement: the applicant must demonstrate compliance with the “unreasonable or unnecessary” test and provide sufficient environmental planning grounds; the consent authority must keep a record of the assessment (cl 4.6(3)-(4)). The clause also excludes some standards from variation (cl 4.6(8)).
Special local controls: the Plan has many use-specific rules,heritage (cl 5.10, Schedule 5), biodiversity and terrestrial conservation (cl 6.3), riparian land (cl 6.6), drinking water catchments (cl 6.5), flood planning (cl 5.21) and aquaculture (cl 5.19 and Sch 6). These clauses operate as both substantive and procedural tests: consent cannot be granted unless the consent authority is satisfied a list of matters is addressed.
Interaction with State instruments and other Acts: the Plan is expressly subject to State environmental planning policy that prevails by s 3.28 of the Act (cl 1.9(1)). It references multiple external statutes and policies , Heritage Act 1977, Biodiversity Conservation Act 2016, Local Government Act 1993, Crown Land Management Act 2016, Fisheries Management Act 1994, Rural Fires Act 1997, Land Acquisition (Just Terms Compensation) Act 1991, and SEPPs, among others , and imports duties and exceptions (for example, cl 1.9A limits suspension of covenants where subject to Crown or conservation instruments).
Maps and schedules dependency: many operative rules depend on mapped categories and Schedules. For example, minimum lot sizes are determined by the Lot Size Map (cl 4.1(3)); terrestrial biodiversity and groundwater vulnerability are map-defined (cl 6.3(2); cl 6.4(2)); Schedule 5 lists heritage items and conservation areas (cl 5.10 Note).
Discretion and evidentiary thresholds: in many places the Plan places matters to be “satisfied” to the consent authority (e.g. cl 5.21(2), cl 6.3(4), cl 6.6(4)). The Plan therefore entrusts evaluative judgements and evidence verification to the consent authority (the Council), and imposes document requirements where relevant (e.g. heritage management document under cl 5.10(5), or heritage conservation management plan under cl 5.10(6)).
These concepts combine to create a local planning regime built on mapped definitions, use lists, discretionary consent tests and targeted local controls (heritage, biodiversity, flood, aquaculture). Several clauses also carve-in or carve-out State or Commonwealth processes; the Plan is not a stand-alone code but a locally calibrated instrument intended to work with the Act and other instruments (cl 1.9; cl 1.6).
Who it affects
The Plan creates rights, duties and procedural steps that affect several identifiable groups. Who pays and who decides follows from the Plan’s structure.
Landowners and prospective purchasers within the mapped area: subject to zoning, lot size and mapped constraints (cl 1.3; cl 2.2; cl 4.1). Owners who propose subdivision, change of use, demolitions, new buildings, aquaculture, or heritage-related works must follow the Plan’s consent or exempt/compliant pathways (cl 2.6; cl 2.7; Part 3; Part 4; cl 5.19).
Developers, builders and consultants: must prepare information and evidence required by the consent authority for matters such as heritage impact statements (cl 5.10(5)), heritage conservation management plans (cl 5.10(6)), flood compatibility assessments (cl 5.21(2)-(3)), biodiversity assessments for land identified on the Terrestrial Biodiversity Map (cl 6.3(2)-(4)), groundwater impact statements (cl 6.4), riparian impact assessments (cl 6.6), and aquaculture operational compliance with Schedule 6 and relevant aquaculture industry development plans (cl 5.19; Sch 6). They bear the cost of technical studies and changes to design to satisfy consent authority requirements.
Cabonne Council (consent authority): designated as the consent authority “subject to the Act” (cl 1.6). The Council makes discretionary decisions under many clauses, assesses compliance with standards, receives and is obliged to consider notices and submissions where the Plan requires consultation (for example heritage notifications to Heritage Council or local Aboriginal communities under cl 5.10(7)-(9)). The Plan requires the Council to keep records of certain assessments (cl 4.6(4)), and to be satisfied on specified matters before granting consent in many contexts (scattered throughout Parts 3-6).
State agencies and the Minister: several clauses allocate specific roles to State authorities. State SEPPs prevail where applicable (cl 1.9). The Plan identifies acquiring authorities for owner-initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 via the Land Reservation Acquisition Map and a table in cl 5.1(2). The Plan preserves rights of public authorities under registered instruments (cl 1.9A(3)) and does not restrict development by public authorities where SEPP Transport and Infrastructure applies (cl 5.12(1)).
Aboriginal communities and the Heritage Council: cl 5.10(7)-(9) imposes consultation duties prior to consent being granted for works affecting archaeological sites, Aboriginal places of heritage significance, and nominated State heritage items. Local Aboriginal communities must be notified and their responses considered, which gives them procedural leverage in consent decisions.
Occupiers and neighbours: public amenity protections are embedded , the Plan contains numerous clauses (e.g. temporary use cl 2.8, intensive livestock cl 5.18, riparian cl 6.6, flood planning cl 5.21) that require the consent authority to consider impacts on adjoining land, water quality, odour, noise and amenity. Neighbours can participate in the planning process under the Act; the Plan’s tests shape the issues the consent authority must assess.
Specific industry operators: aquaculture operators are tightly regulated by cl 5.19 and Schedule 6 (species selection, pond design, discharge rules, priority oyster aquaculture areas). Licensed premises and entertainment operators are protected from refusal on the grounds of music genre or whether dancing occurs (cl 5.20), subject to management of noise. Intensive livestock operations are regulated with capacity thresholds below which consent is not required (cl 5.18(4)-(5)), but larger operations require full assessment.
Lenders, buyers and investors: subdivision and minimum lot size rules (cl 4.1 and related clauses) materially affect development potential and title fragmentation, which in turn affects financing, valuation and transferability of land. The Plan’s rules on classification/reclassification of public land (cl 5.2; Schedule 4) can affect parcels previously held for public reserves.
Who pays and who decides: The principal decision-maker for development consent is Cabonne Council (cl 1.6). Costs fall to applicants and landowners in the form of application fees, preparation of technical reports and any required mitigation works. State agencies pay those costs where they act as proponents under their own SEPPs, but the Plan preserves the primacy of SEPPs where they have effect (cl 1.9). Neighbouring landholders may incur opportunity costs from constrained uses nearby (e.g. intensive livestock proximity controls in cl 5.18).
Key duties and rights
The Plan allocates duties to the consent authority and rights/conditions for applicants and other stakeholders. These are the operative duties and rights most likely to be relied upon or enforced.
Consent authority duties and procedural obligations
To apply zone objectives: the consent authority must have regard to the objectives for development in a zone when determining applications (cl 2.3(2)). This gives the Council a duty to evaluate proposals against the stated objectives in the Land Use Table.
To be satisfied on specific matters before granting consent: the Plan repeatedly requires the consent authority to be “satisfied” the development meets enumerated tests. Examples include:
Temporary use: cl 2.8(3)(a)-(d) , must be satisfied that temporary use will not prejudice future development, will not adversely impact adjoining land or the environment, and that the land will be restored after the temporary period.
Heritage: cl 5.10(4) requires the consent authority to consider the effect of proposed development on heritage significance; cl 5.10(5)-(6) permits requiring heritage management documents or conservation management plans.
Flood planning: cl 5.21(2) prevents granting consent unless the development is compatible with flood function and behaviour and addresses life-safety and evacuation matters.
Terrestrial biodiversity, groundwater vulnerability, drinking water catchments, riparian land, karst land: each of cl 6.3-6.7 imposes both matters to be considered and a satisfaction threshold before consent may be granted (see cl 6.3(3)-(4), cl 6.4(3)-(4), cl 6.5(3)-(4), cl 6.6(3)-(4), cl 6.7(3)-(4)).
Record-keeping: cl 4.6(4) requires the consent authority to keep a record of its assessment where development would contravene a development standard and the applicant seeks consent under the exceptions clause.
Applicant duties and rights
Information and evidence obligations: applicants must present the evidence necessary to demonstrate compliance with the Plan’s requirements and to satisfy the consent authority on the enumerated matters. The Plan explicitly contemplates the consent authority requiring a heritage management document or conservation plan (cl 5.10(5)-(6)) and requires conformity with industry guidance for intensive livestock (cl 5.18(3)(h)).
Right to seek consent and to use exceptions: applicants may seek development consent where development would otherwise contravene development standards under clause 4.6 by making the necessary demonstration that compliance is “unreasonable or unnecessary” and that there are sufficient environmental planning grounds (cl 4.6(3)). The Plan also allows specified exceptions in other clauses (e.g. cl 4.2 allows primary production subdivisions less than minimum size in certain circumstances).
Exempt and complying pathways: developers may carry out exempt development specified in Schedule 2 (cl 3.1) or complying development specified in Schedule 3 (cl 3.2) if the relevant conditions and Building Code requirements are met. Exempt and complying development remain subject to other Acts and approvals (cl 3.1(2) Note 2; cl 3.2(3)(b)-(c)).
Specific rights and constraints
Suspension of private covenants: cl 1.9A(1) provides that, to enable development in accordance with the Plan or a consent, an agreement or covenant that restricts carrying out that development does not apply to the extent necessary. However cl 1.9A(2) lists exceptions (covenants imposed by the Council; certain Crown or conservation instruments; planning agreements), and cl 1.9A(3) preserves public authority rights under registered instruments.
Music and licensed premises: cl 5.20 creates a constraint on the consent authority’s reasons for refusing consent to licensed premises. The authority may not refuse consent on grounds about the genre of music, whether music is live or amplified, whether dancing occurs, presence of a dance floor, stage orientation or decorative/lighting features (cl 5.20(1)-(2)). The authority also may not refuse on noise grounds if satisfied noise can be managed to an acceptable level (cl 5.20(2)). This reduces the discretionary grounds a consent authority may invoke in licensing-related land use decisions.
Minimum lot sizes and subdivision rights: cl 4.1 sets the default minimum lot sizes from the Lot Size Map, with two mapped exceptions where serviced by sewer (4.1(4A)). Clause 4.2 enables limited rural subdivisions for primary production smaller than the minimum where no dwelling will be created (4.2(3)-(5)). Clause 4.2A restricts erection of new dwellings in certain rural zones unless lots meet minimum sizes or fall into specified exceptions (4.2A(3)). Boundary adjustments in rural zones are authorised under cl 4.2B provided no increase in dwelling opportunities arises.
Public land and acquisition
Relevant acquisition authority: cl 5.1 identifies specific State authorities as the acquiring authority for particular reserved land types (e.g. Council for RE1 marked “Local open space”; the corporation under s 2.5 of the Act for “Regional open space”), guiding owner-initiated acquisition processes under the Land Acquisition (Just Terms Compensation) Act 1991.
Classification/reclassification: cl 5.2 authorises Council to classify or reclassify specified public land as operational or community land consistent with the Local Government Act 1993; Schedule 4 lists specific parcels reclassified.
Rights to challenge decisions and procedural protections
The Plan embeds procedural steps that, if not observed, may become grounds for challenge. For example, cl 5.10(7)-(9) requires notification to the Heritage Council or local Aboriginal communities before certain consents; cl 4.6(4) requires the consent authority to keep a record of its assessment under the exceptions clause. The Plan does not itself state appeal rights; appeals and legal remedies are those available under the Act and general administrative law.
Collectively, the Plan delegates evaluative duties to the Council and creates contingent rights for applicants (exempt/compliant paths, exceptions to standards, ability to seek consent where mapped criteria are satisfied) while embedding substantive local protections for heritage, biodiversity, water resources and flood safety.
Penalties and enforcement
The Plan itself does not enumerate fines, infringement notices or a dedicated enforcement schedule. Instead it operates within the enforcement framework of the Environmental Planning and Assessment Act (the Act) and related regulations and statutes that the Plan cites. The text makes the Plan’s relationship to the Act explicit: the Council is “the consent authority for the purposes of this Plan… subject to the Act” (cl 1.6), and multiple clauses reference statutory processes under the Act (for example Division 3.5 is referenced in the savings note to cl 1.8A).
Consequences of non-compliance and enforcement pathways (drawing only on what the Plan itself indicates)
Unauthorised development: the Plan makes clear which development is exempt (cl 3.1), complying (cl 3.2) or requires development consent (cl 2.3; cl 2.6; cl 2.7). Carrying out development without required consent would therefore be unauthorised under the Act; the Plan does not specify penalty quantum but, by operating under the Act, disputes and enforcement actions are dealt with through the Act’s regulatory enforcement and penalties (the Plan’s frequent “subject to the Act” linkage implies this operational path).
Consent conditions and compliance: where consent is granted subject to conditions, compliance with conditions is enforceable under the Act. The Plan provides numerous grounds and tests that consent authorities will incorporate into conditions (heritage protections cl 5.10(10), aquaculture operational conditions in Sch 6, flood-adaptive measures in cl 5.21). Breach of such conditions typically gives rise to regulatory enforcement under the Act.
Procedural non-compliance: the Plan imposes procedural duties on the consent authority in certain contexts, notably notification requirements in cl 5.10(7)-(9) (Heritage Council or local Aboriginal communities). Failure to follow a procedure required by the Plan, where that procedure is mandated as a precondition to consent, may give rise to administrative remedies under the Act or judicial review in the relevant courts or tribunals , the Plan itself does not specify remedy mechanisms, but it embeds the procedural facts that would feed into a statutory appeal or judicial review under the Act.
Record-keeping obligations and transparency: cl 4.6(4) requires the consent authority to keep a record of its assessment under the exceptions to development standards regime. That record is an evidentiary asset for later scrutiny; its absence could be relevant to a challenge of the decision-making process.
Enforcement actors and practical mechanisms
The Plan identifies the key decision-maker as Cabonne Council (cl 1.6). Practical enforcement typically occurs through Council compliance teams and through the statutory mechanisms under the Act (investigations, show-cause notices, orders, court applications), though the Plan does not set out those mechanisms itself.
State agencies retain rights where legislative instruments or registered instruments exist: cl 1.9A(3) preserves rights or interests of any public authority under any registered instrument; cl 5.12(1) ensures the Plan does not restrict development by or on behalf of public authorities where State SEPP Transport and Infrastructure applies.
Acquisition and classification laws: cl 5.1 deals with owner-initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 and identifies the authority to acquire for mapped land types. That statutory regime has its own enforcement and remedy mechanisms (e.g. s 23 of the Land Acquisition Act is referenced in the cl 5.1 Note), but these lie outside the Plan.
Limitations and practical notes
The Plan repeatedly defers to the Act and other instruments for enforcement detail: it sets substance and process but not fixed penalty amounts. Anyone seeking the quantum of penalties or the precise enforcement procedure must consult the Act and the Regulations rather than the Plan text.
The Plan introduces procedural gates that have enforcement consequences (e.g. consent required for demolition cl 2.7; heritage consents cl 5.10; flood suitability cl 5.21). Non-observance of these gates is actionable under the Act.
In short, enforcement and penalties are not self-contained within the Plan. The Plan creates the substantive permissions and prohibitions and identifies the Council as the primary decision-maker; enforcement, sanctions and specific monetary penalties are provided by the Act and related legislation to which the Plan is expressly subject.
How it interacts with other laws
The Plan is written as a local instrument that operates in a networked legal environment. It repeatedly cross-references the Environmental Planning and Assessment Act 1979 (the Act) and a range of State laws and SEPPs. The Plan’s own clauses establish specific interactions and carve-outs; those modulate how state and local rules interrelate.
Primary statutory interactions and hierarchy
State environmental planning policies (SEPPs): cl 1.9(1) states the Plan is subject to any State environmental planning policy that prevails under s 3.28 of the Act. The Plan’s Land Use Table notes list specific SEPPs that may be relevant (for housing, transport and infrastructure, resources and energy, resilience and hazards, industry and employment, primary production). Where a SEPP or its provision has express primacy, that SEPP governs instead of a conflicting Plan provision (cl 1.9(1)).
The Act: numerous references anchor the Plan to the Act. For example, cl 1.2 states the Plan is made in accordance with the relevant standard environmental planning instrument under s 3.20 of the Act; cl 1.6 makes the Council the consent authority “subject to the Act”; the savings provision cl 1.8A explicitly references Division 3.5 of the Act and its requirements for development applications and draft environmental planning instruments. The Plan’s consent architecture must therefore be undertaken within the procedural and appeal frameworks established by the Act.
Specific cross-Act interactions called out in the Plan
Heritage Act 1977: heritage items and processes refer to the Heritage Act and the State Heritage Register. Clause 5.10 requires notification to the Heritage Council and sets procedural requirements when development affects archaeological sites, Aboriginal places of significance, or nominated State heritage items (cl 5.10(7)-(9)).
Local Government Act 1993: cl 5.2 enables Council to classify or reclassify public land in accordance with Part 2 of Chapter 6 of the Local Government Act 1993; the Plan also references section 30 of that Act on discharge of trusts.
Land Acquisition (Just Terms Compensation) Act 1991: cl 5.1 aligns with the owner-initiated acquisition provisions under that Act and identifies the State authority that will acquire land of different reservation types shown on the Land Reservation Acquisition Map.
Crown Land Management Act 2016 and National Parks and Wildlife Act 1974: cl 1.9A(2) specifically excludes from the Plan’s covenant-suspension provision any “relevant instrument” within the meaning of s 13.4 of the Crown Land Management Act 2016 and any conservation agreement within the meaning of the National Parks and Wildlife Act 1974.
Fisheries, Biodiversity and Aquaculture laws: aquaculture provisions cross-reference the Fisheries Management Act 1994, the Biodiversity Conservation Act 2016 and the Fisheries Management (Aquaculture) Regulation 2017. Clause 5.19 and Schedule 6 impose site and operational requirements that must be consistent with aquaculture industry development plans and relevant NSW strategies (cl 5.19(2)-(6)).
Rural Fires Act 1997: cl 5.11 states bush fire hazard reduction authorised under that Act may be carried out without development consent. This cross-reference preserves the separate statutory authority for fire hazard work.
BASIX and Building Code of Australia: exempt and complying development clauses require compliance with the Building Code of Australia (cl 3.1(3)(a)), and cl 4.6(8)(b) excludes contraventions of BASIX commitments forming part of a BASIX certificate from being permitted under the exceptions to development standards provision.
Practical interaction consequences
Where the Plan and a SEPP conflict, the SEPP may prevail (cl 1.9(1)). Applicants and consent authorities must check both the Plan and the relevant SEPPs listed in the Land Use Table notes and elsewhere.
The Plan’s covenant-suspension clause (cl 1.9A) interacts with private property rights and registered instruments but expressly protects certain statutory instruments and public authority rights. Practically, this means private instruments may be overridden to the extent necessary to give effect to the Plan, but covenants required by Council, Crown instruments, conservation agreements and planning agreements are preserved from that suspension.
The Plan’s heritage and Aboriginal consultation obligations interact with statutory consultation duties under the Heritage Act and Native Title/Aboriginal Heritage frameworks. The Plan prescribes local notification duties that run alongside statutory processes.
Planning approvals for infrastructure or Crown works may be governed by SEPP (Transport and Infrastructure) and the Plan expressly does not restrict such development (cl 5.12).
Matters of state environmental significance and mapped environmental protections (biodiversity areas, drinking water catchments, riparian zones, karst risks) bring other statutory regimes into the decision mix (Biodiversity Conservation Act, Water/ Catchment laws) as the Plan requires consent authorities to consider overlapping environmental impacts and compliance with external licences or approvals.
In sum, the Plan is an instrument that sets local development rules while repeatedly deferring to, complementing and interacting with State instruments and other statutes. The precise legal effect of any decision requires reading the Plan together with the Act, applicable SEPPs and the substantive statutes cross-referenced throughout the Plan.
Amendment history
The Plan text contains embedded amendment notations indicating specific changes over time. Those notes identify which clauses were inserted, amended or repealed and give a short reference to the amending instrument (year and schedule). The Plan therefore carries a visible amendment trail in its text. Key amendments and inserted clauses in the printed text include the following (quoted clause citations and amendment notes come from the instrument as printed):
2014: Schedule 4 was amended , sch 4: Am 2014 (670), cl 4 (1) (2). Schedule 4 lists land reclassified or classified as operational or community land and the 2014 amendment adjusted Part 1 and Part 2 entries.
2016-2023 Land Use Table amendments: The Land Use Table carries a history note: "Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2019 (137), Sch 6 [1]; 2022 (830), Sch 1.7[2]; 2023 (458), Sch 2.14." These entries indicate iterative adjustments to permitted uses and prohibitions in the Land Use Table across several years.
2017 insertions: clause 4.2B (Boundary adjustments in certain rural zones) was inserted , cl 4.2B: Ins 2017 (12), Sch 1. This clause provides a pathway for boundary adjustments where resultant lots do not meet minimum lot sizes but the number of opportunities for dwellings is not increased and agricultural viability is preserved.
2018 amendments: cl 5.4 (Controls relating to miscellaneous permissible uses) was amended , cl 5.4: Am 2018 (406), Sch 1.25 [1] [2]; and Schedule 1 had an amendment , sch 1: Am 2018 (430), cl 4. Clause 5.4 contains detailed floorspace and room number caps (bed and breakfast, home business, industrial retail outlet, farm stay, kiosks, neighbourhood shops, and more).
2019 amendments: clause 1.8A (Savings provision relating to development applications) was added , cl 1.8A: Am 2019 (621), Sch 5[1]. Clause 1.9A (Suspension of covenants, agreements and instruments) was also amended in 2019 , cl 1.9A: Am 2019 (621), Sch 5[2]-[4]. These changes introduced the savings provision and the covenant suspension provision with expressly listed exceptions.
2020 amendment: clause 5.1 (Relevant acquisition authority) updated , cl 5.1: Am 2020 No 30, Sch 2.5. This modifies the table identifying the State authority that would acquire land under owner-initiated acquisition provisions.
2021 insertions: clause 5.9 (Dwelling house or secondary dwelling affected by natural disaster) was inserted , cl 5.9: Ins 2021 (302), Sch 1.4. Clause 6.1 was repealed , cl 6.1: Rep 2021 (225), Sch 1.
2022 amendments: cl 2.1 (Land use zones) was amended , cl 2.1: Am 2022 (830), Sch 1.7[1]; cl 4.6 (Exceptions to development standards) was amended , cl 4.6: Am 2022 (830), Sch 1.7[3]; cl 5.3 (Development near zone boundaries) amended , cl 5.3: Am 2022 (830), Sch 1.7[3]; cl 6.2 (Stormwater management) amended , cl 6.2: Am 2022 (830), Sch 1.7[4]. These changes reflect ongoing refinement of zone definitions, exception procedures and local environmental requirements.
2023 amendment: Land Use Table adjusted in 2023 as noted above (2023 (458), Sch 2.14).
2025 amendments: Schedule 1 (Additional permitted uses) shows amendments , sch 1: Am 2018 (430), cl 4; 2025 (46), Sch 1; 2025 (93), Sch 1. Those 2025 references indicate continued site-specific changes to permitted uses (e.g., the use clauses for particular lots in Schedule 1).
Other notes in the text indicate that many clauses have been left “Not adopted” (for example cl 4.3 Height of buildings; cl 4.4 Floor space ratio; cl 4.5 Calculation of floor space ratio and site area; several local provisions labelled “Not adopted”). These markers demonstrate the Plan’s modularity and the ability to leave certain standard clauses as not operative locally.
The Plan also signals that maps are subject to amendment and updating and are to be made available on the NSW Planning Portal per cl 1.7(3) and accompanying notes about technical requirements for maps. Amendment history within the text is partial (the Plan itself records the amendment instrument references) but for the full statutory amendment record an analyst must consult the NSW legislation database and the Cabinet or Parliamentary records of the specific amending instruments cited (the short-form references in the Plan indicate the primary amending instruments and schedule references).
Litigation history
The Plan as printed does not reference any judicial decisions or cases. It names no judicial authorities. Therefore there is no litigation history recorded within the Plan text itself. The Plan, however, contains procedural gates and discretionary assessments that create potential legal vectors for challenge under the Act and administrative law. The Plan’s provisions suggest a set of predictable dispute points that commonly form the subject-matter of litigation or review in planning contexts. The Plan’s text identifies the procedural steps and records that would be focal points in any legal challenge:
Exceptions to development standards and record-keeping (cl 4.6): the exceptions mechanism requires applicants to demonstrate that compliance is unreasonable or unnecessary and to provide environmental planning grounds (cl 4.6(3)). The consent authority must keep a record of its assessment (cl 4.6(4)). Challenges could focus on whether the consent authority properly applied the test and whether its record adequately documents the reasoning. Given the Plan’s express record-keeping requirement, absence of an adequate record could be a procedural weakness in a decision.
Heritage notification and consultation duties (cl 5.10(7)-(9)): the Plan requires notification to the Heritage Council and to local Aboriginal communities and that responses be considered within 28 days. Failure to notify or to consider responses could be alleged procedural unfairness or non-compliance with the Plan before consent is granted. Any decision to grant consent where the Plan mandates notification may be exposed to review if the process was not followed.
Flood, biodiversity and water protection tests (cl 5.21; cl 6.3; cl 6.5): these clauses require the consent authority to be satisfied that developments will not adversely affect flood behaviour, biodiversity, groundwater or drinking water catchments and to consider specific enumerated matters. Litigation could challenge whether the authority properly took into account projected climate change impacts on flood behaviour (cl 5.21(3)(a)), or whether assessments adequately addressed cumulative impacts on groundwater (cl 6.4(3)(c)). The Plan explicitly references external guidelines (the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual) which feed into the standards the consent authority must use; disputes could hinge on which guideline versions were applied and whether the required professional evidence supports the authority’s satisfaction.
Covenant suspension (cl 1.9A) and private rights: the Plan allows, to the extent necessary, suspension of private covenants that would restrict development consistent with the Plan. Litigation could arise where a third party claims the Plan’s suspension improperly affects property rights. The Plan mitigates this by enumerating exceptions (cl 1.9A(2)) and preserving public authority rights (cl 1.9A(3)), but disputes could concern whether an instrument falls within an exception.
Procedural interface with State instruments: because the Plan is expressly subject to SEPPs (cl 1.9(1)), litigation could concern whether a decision properly applied the primacy of a SEPP or misinterpreted a SEPP’s application given the Plan’s local controls.
The Plan embeds remedies indirectly by setting procedural rules and satisfaction thresholds which, if not observed, leave decisions open to statutory appeal or judicial review under the Act. The Plan’s legislative references to Division 3.5 of the Act in the savings note to cl 1.8A show awareness that planning applications and draft instruments may be considered together, a procedural architecture that can itself be litigated if the statutory notice requirements in the Act are not met.
Because the Plan does not list cases, an analyst wishing to explore litigation arising from this Plan should search judicial and tribunal databases for cases that reference “Cabonne Local Environmental Plan 2012” or the clause numbers of interest (for instance cl 4.6 exceptions), and should review decisions that interpret SEPPs that operate in Cabonne. The Plan’s internal record-keeping and notification duties (cl 4.6(4); cl 5.10(7)-(9)) will be starting points in assessing the procedural vulnerabilities of administrative decisions.
Gotchas
Practical traps and frequently overlooked consequences are concentrated where the Plan defers to maps, leaves common controls “not adopted”, or imposes procedural obligations. The following are concrete “gotchas” drawn directly from the Plan text:
Heavy reliance on maps: Many operative controls are map-dependent. Minimum lot sizes (cl 4.1) are set by the Lot Size Map; biodiversity protections reference the Terrestrial Biodiversity Map (cl 6.3); riparian protections attach to the Riparian Lands and Watercourses Map (cl 6.6). Applicants who fail to check the relevant maps risk misclassifying the status of their land. The Minister-approved map arrangements (cl 1.7(3)) and the Plan’s instructions to consult the NSW Planning Portal mean up-to-date maps are essential.
“Not adopted” clauses create local gaps: clauses that commonly carry numeric standards in other LEPs (for example cl 4.3 Height of buildings; cl 4.4 Floor space ratio; cl 4.5 Calculation of floor space ratio and site area) are marked “[Not adopted]”. That absence means there may be no local numeric height or FSR cap in the Plan; consent authorities will therefore need to rely on zone objectives, other clauses, and state controls. Applicants should not assume default numerical limits apply unless they are set by other instruments or maps.
Covenant suspension is limited: cl 1.9A suspends private covenants “to the extent necessary” to enable development in accordance with the Plan but specifically excludes covenants imposed by Council, Crown instruments, conservation agreements, Trust agreements, property vegetation plans, biobanking agreements and planning agreements (cl 1.9A(2) a-g). Practitioners cannot rely on cl 1.9A to remove covenants that fall within these exceptions.
Music protections narrow refusal grounds for licensed premises: cl 5.20 prevents the consent authority from refusing licensed premises on a broad set of attributes related to music and dancing (genus, live/amplified, dancing, stage direction, decorations). While this protects operators, it also places the onus on applicants to demonstrate noise management to an “acceptable level” (cl 5.20(2)). Noise management plans and evidence will therefore be required in contentious contexts.
Temporary use timeframe and exceptions: cl 2.8 caps temporary uses at 52 days in any 12 months. The exception for the temporary use of a dwelling as a sales office for a new release area may exceed 52 days (cl 2.8(4)). Applicants who assume an extended temporary use without checking the sales office exception risk noncompliance.
Subdivision and secondary dwelling interactions: cl 2.6(2) forbids granting consent for subdivision of land with a secondary dwelling where the subdivision would result in principal and secondary dwellings being on separate lots, unless the resulting lots meet mapped minimum sizes. The definition of secondary dwelling requires it to be on the same lot as the principal dwelling (cl 2.6 note referring to Dictionary). Overlooking this will jeopardise subdivision outcomes.
Boundary adjustments are constrained by dwelling opportunities: cl 4.2B allows boundary adjustments that create lots below minimum size only where no additional dwelling opportunities are created and agricultural viability is not adversely affected. Applicants seeking boundary adjustments must demonstrate there is no increase in dwelling opportunities (cl 4.2B(3)(a)-(d)). This is narrower than typical boundary adjustment expectations.
Exceptions to development standards require a written justification: cl 4.6(3) requires an applicant to demonstrate the test (unreasonable or unnecessary compliance plus sufficient environmental planning grounds). The Environmental Planning and Assessment Regulation 2021 requires a supporting document for such contraventions. Absent a rigorous written case, consent will likely be refused.
Heritage and Aboriginal consultation timing: where the Plan requires notification to the Heritage Council or local Aboriginal communities (cl 5.10(7)-(9)), those notifications must occur before consent is granted and consideration must be given to any responses within 28 days. Failure to observe these timing requirements may render a decision procedurally vulnerable.
Aquaculture operational limits: cl 5.19 and Schedule 6 impose operational limits (no freshwater discharge to natural waterbodies except from open flow-through systems (Sch 6 Div 2, item 4); pond design requirements for intensive aquaculture; priority oyster aquaculture area exceptions). Aquaculture proposals must align with aquaculture industry development plans and NSW Oyster Industry guidance (cl 5.19(2)-(6)). Operators failing to align with these mapped and plan-based requirements risk refusal.
Essential services precondition: cl 6.8 makes the availability of essential services (water, electricity, sewage, stormwater drainage, vehicular access) a precondition for consent. Applications that presuppose later provision of services without demonstrating “adequate arrangements” risk refusal.
Suspension of land-specific exemptions: cl 1.8A (savings provision) directs that a development application made before the Plan commenced and not finally determined must be determined as if the Plan had not commenced. Practitioners should not assume post-Plan rules automatically apply to pre-existing applications.
Each of these “gotchas” flows directly from an operative clause and illustrates points where an applicant or adviser might be surprised unless the Plan’s text and maps are carefully checked.
How to comply
Compliance under the Plan is procedural and substantive: applicants must (i) identify the relevant map-based classifications and zone rules, (ii) follow exemptions/compliance pathways where available, (iii) prepare the evidence required by the Plan’s specific clauses and the Act, and (iv) design proposals to meet the satisfaction thresholds the consent authority must apply. Practical steps follow from the Plan’s clauses.
Confirm maps and zoning first (cl 1.3; cl 2.2; cl 1.7)
Check the Land Zoning Map, Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Riparian Lands and Watercourses Map, Groundwater Vulnerability Map, Drinking Water Catchment Map, and Land Reservation Acquisition Map on the NSW Planning Portal as these maps trigger many of the Plan’s operational rules (cl 1.3; cl 1.7(3)).
Confirm whether your land is in a zone that permits the proposed use without consent, requires consent or is prohibited by consulting the Land Use Table (cl 2.3 and Land Use Table).
Determine pathway: exempt, complying, or development consent (Part 3)
If the activity is listed as exempt in Schedule 2 and meets the Schedule standards (cl 3.1(2)), confirm it also meets Building Code deemed-to-satisfy provisions and is not designated, not on land with State Heritage Register items, and does not require other statutory approvals.
If the activity is complying development under Schedule 3 and the State SEPPs, ensure that it satisfies the prescribed development standards and the Building Code (cl 3.2(2)-(4)).
For development requiring consent, prepare clause-specific evidence
Heritage items or areas (cl 5.10): prepare heritage impact statements and be ready to supply a heritage management document or heritage conservation management plan if the Council requests one (cl 5.10(4)-(6)). Provide evidence addressing effects on heritage significance and contact local Aboriginal communities where the Plan requires (cl 5.10(8)).
Flood planning (cl 5.21): supply flood impact and evacuation analysis consistent with the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual referenced in cl 5.21(4); design measures to manage flood risk to life and property (cl 5.21(2)-(3)).
Terrestrial biodiversity and riparian land (cl 6.3; cl 6.6): commission ecological assessments addressing impacts on condition, habitat, connectivity and propose avoidance/minimisation/mitigation measures (cl 6.3(3)-(4); cl 6.6(3)-(4)).
Groundwater vulnerability and drinking water catchments (cl 6.4; cl 6.5): provide hydrogeological assessments addressing contamination risk, groundwater-dependent ecosystems and cumulative impacts on extraction (cl 6.4(3); cl 6.5(3)).
Aquaculture (cl 5.19 and Sch 6): ensure the proposal complies with Part 1 or Part 2 of Schedule 6 as applicable: site exclusion zones, pond design, freshwater discharge rules and screening of outlets (cl 5.19(2)-(6); Sch 6 Divisions 1-2).
Intensive livestock agriculture (cl 5.18): for large operations, prepare statements of environmental effects addressing odour, water pollution, soil degradation, and compliance with industry codes and Department of Primary Industries guidelines (cl 5.18(3)(a)-(h)). For small operations within capacity thresholds, confirm location constraints to qualify for development without consent under cl 5.18(4)-(5).
Use the exceptions clause properly if needed (cl 4.6)
If the proposal would contravene a development standard, prepare the statutory exception justification required by cl 4.6(3): demonstrate compliance with the “unreasonable or unnecessary” test and provide sufficient environmental planning grounds. Attach the required document for contraventions as required by the Environmental Planning and Assessment Regulation 2021. Keep in mind cl 4.6(6) prohibits certain subdivisions being consented under this clause.
Meet essential services and servicing tests (cl 6.8)
Demonstrate availability or adequate arrangements for water supply, electricity, sewerage disposal and stormwater management and vehicular access. Where on-site effluent is required by Local Government Act planning, obtain Council approvals before relying on a complying development pathway (cl 3.2(3)(c)).
Address procedural obligations
If the Plan requires notification to the Heritage Council or local Aboriginal communities (cl 5.10(7)-(9)), ensure those notifications are done and responses are considered within the stated periods. Maintain records of all notifications and responses.
For contravention assessments under cl 4.6, ensure the consent authority is provided with the documents it needs so it can make the required record (cl 4.6(4)).
For proposed subdivisions, check minimum lot size and special rural rules
Use the Lot Size Map to confirm minimum lot sizes (cl 4.1(3)). For sewered areas, note the relaxed minimums for Areas A and B if the consent authority is satisfied the lots will be serviced by sewer (cl 4.1(4A)).
For rural primary production subdivisions that seek to create lots below minimums for primary production purposes, check cl 4.2(3)-(5) restrictions (no dwelling to be created) and cl 4.2B if proposing boundary adjustments.
Pre-lodgement practice and Council engagement
Given the discretionary nature of many clauses and the Plan’s requirement that the consent authority be “satisfied” on various matters, practitioners should use pre-lodgement meetings with Council to identify required studies, potential conditions and procedural expectations. Early engagement reduces the risk of refusal or requests for further information.
Records and documentation
Keep comprehensive records because the Plan makes record-keeping a statutory requirement in contexts such as exceptions to development standards (cl 4.6(4)). Retain and provide all technical reports, management plans, notifications and communications used to support the application.
Consider concurrent State approvals and SEPPs
Check whether an applicable SEPP prevails (cl 1.9). Where State policies apply (for example certain transport or infrastructure works under SEPP Transport and Infrastructure), coordinate parallel or dominant approvals accordingly. For BASIX commitments or building sustainability measures, ensure compliance because cl 4.6(8)(b) excludes BASIX-related development standards from the exceptions procedure.
Following these steps aligns the practical application process with the Plan’s operative clauses. The consistent theme in the Plan is documentation and evidence: the consent authority must repeatedly be “satisfied” on enumerated matters. Applicants who provide clear, guideline-aligned technical evidence and who engage early with Council reduce the risk of procedural failures or refusals.
(v) protects, enhances and conserves agricultural land and the contributions that agriculture makes to the regional economy,
(vi) avoids or minimises adverse impacts on drinking water catchments to protect and enhance water availability and safety for human consumption,
(vii) protects and enhances places and buildings of environmental, archaeological, cultural or heritage significance, including Aboriginal relics and places,
(viii) protects and enhances environmentally sensitive areas, ecological systems, and areas that have the potential to contribute to improved environmental, scenic or landscape outcomes.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Cabonne Local Environmental Plan 1991
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU2 Rural Landscape
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
E5 Heavy Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C2 Environmental Conservation
Waterway Zones
W1 Natural Waterways
cl 2.1: Am 2022 (830), Sch 1.7[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with t
This is an opening excerpt, not the complete document.