Bush Fire Brigades Amendment Local Law
348GOVERNMENT GAZETTE, WA 16 February 2022
Start here
Get a plain-English read of 348
Turn the raw legal text into a practical explanation grounded in Bush Fire Brigades Amendment Local Law.
348 GOVERNMENT GAZETTE, WA 16 February 2022 (4) Where installation of material which would create a hard surface has been installed or is intended, an authorised person may by written notice, require— (a) a reduction of area covered or to be covered, if shedding of storm water or flooding is likely to cause a nuisance to neighbours or users of a thoroughfare; and (b) an area of open space to a maximum of 1m from the edge of a street tree. (5) The owner and occupier of the lot abutting a verge treatment referred to in subclause (1) are each to be taken to have installed and maintained that verge treatment for the purposes of this clause and clause 6.8. 6.8 Obligations of owner or occupier An owner or occupier who installs or maintains a permitted verge treatment shall— (a) keep the permitted verge treatment in a good and tidy condition and, where the verge treatment is a garden or lawn, ensure that a footpath on the verge and a carriageway adjoining the verge is not obstructed by the verge treatment; (b) ensure that clear sight visibility is maintained at all times for a person using the abutting thoroughfare in the vicinity of an intersection or bend in a carriageway, or using a driveway on land adjacent to the thoroughfare for access to or from the thoroughfare; (c) not place any obstruction on or around the verge treatment; (d) not disturb a footpath on the verge; (e) ensure that the verge treatment does not damage or obstruct a drain, manhole, galley, inspection pit, channel, kerb or tree planted by the local government; and (f) ensure that any sprinklers or pipes installed to irrigate a verge treatment— (i) do not protrude above the level of the lawn or verge treatment when not in use; (ii) are not used at such times so as to cause unreasonable inconvenience to pedestrians or other persons; and (iii) do not otherwise present a hazard to pedestrians or other persons. 6.9 Transitional provision former provisions means the provisions of the repealed local laws which permitted certain types of verge treatments, whether with or without the consent of the local government. (2) A verge treatment is to be taken to be a permitted verge treatment for so long as the verge treatment remains of the same type and continues to comply with the former provisions which— (a) was installed prior to the commencement day; and (b) on the commencement day is a type of verge treatment which was permitted under and complied with the former provisions. 6.10 Power to carry out public works on verge Where the local government or an authority is empowered to do so under a written law disturbs a verge, the local government or the authority— (a) is not liable to compensate any person for that disturbance; (b) may backfill with sand, if necessary, any garden or lawn; and (c) is not liable to replace or restore any— (i) verge treatment and, in particular, any plant or any material or other hard surface; or (ii) sprinklers, pipes or other reticulation equipment. Division 3—Vehicle crossovers 6.11 Temporary crossovers (1) Where it is likely that works on a lot will involve vehicles leaving a thoroughfare and entering the lot, the person responsible for the works shall obtain a licence for the construction of a temporary crossover to protect the existing carriageway, kerb, drains, footpath, existing materials and street trees, where— (a) a crossover does not exist; or (b) a crossover does exist, but the nature of the vehicles and their loads is such that they are likely to cause damage to the crossover. (2) The person responsible for the works in subclause (1) is to be taken to be— (a) the builder named on the building permit issued under the Building Act 2011, if one has been issued in relation to the works; or (b) the owner of the lot, if no building permit has been issued under the Building Act 2011 in relation to the works. (3) If the CEO or an authorised person approves an application for a licence for the purpose of subclause (1), the licence is taken to be issued on the condition that until such time as the temporary crossover is removed, the licence holder shall keep the temporary crossover in good repair and in such a condition so as not to create any danger or obstruction to persons using the thoroughfare.