VICIn ForceRegulation
Building Regulations 2018
127Record of pile-driving
Start here
Get a plain-English read of 127
Turn the raw legal text into a practical explanation grounded in Building Regulations 2018.
127 Record of pile-driving
Any person installing piles must—
(a) keep a record of all pile-driving operations undertaken during the construction including any determination of allowable loadings; and
(b) make the records available for inspection by the relevant building surveyor during the progress of the pile-driving operations; and
(c) within 28 days of the completion of the pile‑driving operations forward the complete records of the pile-driving operations to the relevant building surveyor.