Building Regulations 2016
58Works in coastal erosion hazard areas
Start here
Get a plain-English read of 58
Turn the raw legal text into a practical explanation grounded in Building Regulations 2016.
58 Works in coastal erosion hazard areas
(1) A person must not perform work in a coastal erosion hazard area unless he or she is authorised to do so under the Act.
Penalty: Fine not exceeding 50 penalty units.
(2) If a person intends to perform work in an investigation area of a coastal erosion hazard area, the person must, before performing the work, ensure that the land is classified in accordance with the coastal erosion determination –
(a) as being an acceptable risk; or
(b) into a hazard band for the coastal erosion hazard area.
Penalty: In the case of –
(a) a natural person, a fine not exceeding 75 penalty units; or
(b) a body corporate, a fine not exceeding 150 penalty units.
(3) A responsible person for work being performed in a coastal erosion hazard area must ensure that the work is being performed in accordance with the Act and the coastal erosion determination.
Penalty: In the case of –
(a) a natural person, a fine not exceeding 75 penalty units; or
(b) a body corporate, a fine not exceeding 150 penalty units.
(4) A person performing work in a coastal erosion hazard area must ensure that the work complies with the Act and the coastal erosion determination.