Building Regulations 2016
56Works in coastal inundation hazard areas
Start here
Get a plain-English read of 56
Turn the raw legal text into a practical explanation grounded in Building Regulations 2016.
56 Works in coastal inundation hazard areas
(1) A person must not perform work in a coastal inundation hazard area unless he or she is authorised to do so under the Act.
Penalty: In the case of –
(a) a natural person, a fine not exceeding 75 penalty units; or
(b) a body corporate, a fine not exceeding 150 penalty units.
(2) If a person intends to perform work in an investigation area of a coastal inundation hazard area, the person must, before performing the work, ensure the land is classified, in accordance with the coastal inundation determination –
(a) as being an acceptable risk; or
(b) into a hazard band for the coastal inundation hazard area.
Penalty: In the case of –
(a) a natural person, a fine not exceeding 75 penalty units; or
(b) a body corporate, a fine not exceeding 150 penalty units.
(3) A person must not perform work on a building on land in a coastal inundation hazard area unless the floor level of each habitable room of the building, being erected, re-erected or added as part of the work, is at least 300 millimetres above the defined flood level for the land.
Penalty: In the case of –
(a) a natural person, a fine not exceeding 75 penalty units; or
(b) a body corporate, a fine not exceeding 150 penalty units.
(4) A responsible person for work being performed in a coastal inundation hazard area must ensure that the work is being performed in accordance with the Act and the coastal inundation determination.
Penalty: In the case of –
(a) a natural person, a fine not exceeding 75 penalty units; or
(b) a body corporate, a fine not exceeding 150 penalty units.
(5) A person performing work in a coastal inundation hazard area must ensure that the work complies with the Act and the coastal inundation determination.