Building Regulations 2016
33Certificates of likely compliance (notifiable plumbing work)
Start here
Get a plain-English read of 33
Turn the raw legal text into a practical explanation grounded in Building Regulations 2016.
33 Certificates of likely compliance (notifiable plumbing work)
For the purposes of section 109(1)(g) of the Act, the following matters are prescribed matters in relation to a certificate of likely compliance (notifiable plumbing work):
(a) if relevant, a hazard determination made under Part 5 ;
(b) if, as a result of the proposed notifiable plumbing work, it is anticipated that there is to be a change in the use, or occupancy, of the premises where the work is performed, whether that change requires –
(i) the hydraulic loading on an existing on-site wastewater management system to be increased; or
(ii) an existing on-site wastewater management system to be replaced, relocated or upgraded;
(c) whether, as a result of the proposed notifiable plumbing work, there will be an adverse effect on the operation of any on-site wastewater management system within 2 metres of the work.