NTIn ForceRegulation
BUILDING REGULATIONS 1993
16Drainage works to be notified
Start here
Get a plain-English read of 16
Turn the raw legal text into a practical explanation grounded in BUILDING REGULATIONS 1993.
16 Drainage works to be notified The plumber or drainer carrying out drainage works must: (a) notify the Director of the completion of drainage work prior to covering up those works; and (b) stop carrying out those works if directed to do so by the Director.