TASIn ForceAct
Building Act 2016
220Determination of application for occupancy permit
Start here
Get a plain-English read of 220
Turn the raw legal text into a practical explanation grounded in Building Act 2016.
### 220 Determination of application for occupancy permit
> > (1) In considering an application for an occupancy permit, the building surveyor is to take into account –
> >
> > > > (a) if a required report has been provided under [section 219](#GS219@EN) in respect of the application, the required report; and
> > >
> > > > (b) the documentation provided with the application; and
> > >
> > > > (c) the building's suitability for occupation for its intended use; and
> > >
> > > > (d) whether adequate provision has been made for smoke alarms, sanitation and water supply within the building; and
> > >
> > > > (e) any prescribed documents or matters.
>
> > (2) If the building surveyor grants an application for an occupancy permit, the building surveyor is not required to implement anything contained in a required report provided under [section 219](#GS219@EN) in respect of the application.
>
> > (3) If the building surveyor does not implement anything contained in the required report, the building surveyor is to –
> >
> > > > (a) notify the reporting authority; and
> > >
> > > > (b) provide the reporting authority with –
> > > >
> > > > > > (i) a copy of the occupancy permit; and
> > > > >
> > > > > > (ii) the reasons for not implementing anything contained in the report.
>
> > (4) If a required report was provided as part of an application for an occupancy permit and the application is granted, the building surveyor is to provide a copy of the occupancy permit for the building to the reporting authority that provided the report.