This Plan sets zoning and the rules for what may be built or used on land in Brewarrina, including permitted and prohibited uses, subdivision minimum lot sizes, exempt/complying development classes, heritage controls, flood planning and aquaculture standards (cl 2.1; cl 4.1; cl 3.1; cl 5.10; cl 5.21; cl 5.19). Developers and landowners pay compliance costs and must obtain Council consent (cl 1.6); the consent authority may impose conditions, require specialist assessments and consult State or Commonwealth bodies in specified cases (eg cl 6.4). Clause 1.9A can suspend private covenants to enable development, subject to listed exceptions.
Mechanically, the instrument provided is a local environmental plan (the Brewarrina Local Environmental Plan 2012) that: commences on publication on the NSW legislation website (cl 1.1AA); applies to the land shown on the Plan’s maps (cl 1.3, cl 1.7); repeals earlier local environmental plans that had applied solely to that land (cl 1.8); and establishes the primary statutory framework for what development is permitted, permitted with consent, or prohibited in the Brewarrina local government area (Part 2, Land Use Table). The Plan names the consent authority for the area as the Council, subject to the Environmental Planning and Assessment Act (cl 1.6). It complements and is subject to State environmental planning policies where those SEPPs prevail (cl 1.9(1)).
Substantively, the Plan:
zones the land into a small set of zones (RU1 Primary Production; RU5 Village; R5 Large Lot Residential; SP2 Infrastructure; RE1 Public Recreation; C1 National Parks and Nature Reserves) and links uses and objectives to those zones via the Land Use Table (cl 2.1, cl 2.2, cl 2.3, Land Use Table entries);
requires development consent for subdivision (cl 2.6), demolition (cl 2.7), most temporary uses beyond 30 days without special carve-outs (cl 2.8), and certain classes of development identified throughout (see Parts 3-6);
sets minimum lot sizes for subdivisions shown on the Lot Size Map and provides additional subdivision rules for community title and strata schemes (cl 4.1, cl 4.1AA, cl 4.1A, cl 4.1B);
preserves heritage by requiring consent for demolition, alteration and certain works affecting heritage items, Aboriginal objects and archaeological sites and imposing consultation and assessment requirements (cl 5.10);
regulates aquaculture (pond-based, tank-based and oyster) with specified site and operational requirements in cl 5.19 and Schedule 6;
Current sections
Direct links to the current provisions in Brewarrina Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2019 (137), Sch 6 [1]; 2022 (314), Sch 1; 2023 (458), Sch 2.12.
Zone RU1 Primary Production
Zone RU5 Village
Zone R5 Large Lot Residential
Zone SP2 Infrastructure
Zone RE1 Public Recreation
Zone C1 National Parks and Nature Reserves
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Building identification signs; Business identification signs; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Crematoria; Depots; Dual occupancies (attached); Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Freight transport facilities; Heavy industrial storage establishments; Heavy industries; Helipads; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Landscaping material supplies; Open cut mining; Plant nurseries; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Roadside stalls; Rural industries; Rural workers’ dwellings; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
When this Plan was made, no land in the zones listed in the Table to subclause (2) was shown on the Land Reservation Acquisition Map as the land at that time was held by an authority of the State, a public company or a subsidiary of a public company.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
| Suburb | Item name | Address | Property description | Significance | Item no |
| Angledool | St Andrews Anglican Church | Chalmer Street | Lot 3, Section 5, DP 2749 | Local | I2 |
| Angledool | Angledool hall | Main Road 438 | Lot 5, Section 7, DP 2749 | Local | I1 |
| Brewarrina | Four Mile Reserve | Barwon River, 4 miles upstream from Brewarrina | Parish of Wellman | Local | I16 |
| Brewarrina | Old Mission Cemetery site | Barwon River, 9 miles upstream from Brewarrina | Parish of Cato | Local | I15 |
| Brewarrina | Birrie cemetery | Just east of Birrie River, on road to Collerina | Parish of Gunnawarra | Local | I21 |
| Brewarrina | Ancient quarry site | North west of Brewarrina | Parish of Cato | Local | I17 |
| Brewarrina | Brewarrina fish traps | Brewarrina | Lot 7040, DP 1126189; Lot 18, DP 755035; Lot 18, DP 755035; Lot 6, DP 767239; Lot 7, DP 767239; Crown Land, DP 820460; Lot 175, DP 820460 | State | I25 |
| Brewarrina | Yambacoona Mountain | 28 km west of Brewarrina | Parish of Yambacoona | Local | I23 |
| Brewarrina | Narran archaeological and mythological site | Narran Lake | Parish of Quantambine | Local | I18 |
| Brewarrina | Brewarrina Court House and residence | Bathurst Street | Lot 2, Section 10, DP 758161 | Local | I7 |
| Brewarrina | Brewarrina Electronics | Bathurst Street | Lot 1, Section 5, DP 974585 | Local | I13 |
| Brewarrina | Royal Hotel | 25–27 Bathurst Street | Lot 2, DP 84215 | Local | I4 |
| Brewarrina | Brewarrina Hotel | 45 Bathurst Street | Lot C, DP 318598 | Local | I5 |
| Brewarrina | Cafe Deluxe | 87 Bathurst Street | Lot 2, DP 85537 | Local | I6 |
| Brewarrina | Anglican church | 90–92 Bathurst Street | Lot 1, Section 10, DP 758161 | Local | I14 |
| Brewarrina | Catholic church | 113 Bathurst Street | Lot 5, DP 758161 | Local | I8 |
| Brewarrina | Dwelling | 125 Bathurst Street | Lot 9, Section 16, DP 758161 | Local | I9 |
| Brewarrina | Barwon Bridge | Bridge Road (MR70) | | Local | I11 |
| Brewarrina | Dwelling | 41 Doyle Street | Lot 20, Section 17, DP 758161 | Local | I10 |
| Brewarrina | Hospital Creek Massacre site | Hospital Creek, Goodooga Road | Parish of Quantambine | Local | I12 |
| Brewarrina | Brewarrina Aboriginal mission site | The Old Mission Road | Lot 22, DP 755016 | State | I24 |
| Goodooga | Goodooga Aboriginal Reserve and cemeteries WLL 4258 | On east bank of Bokhara River, upstream of Goodooga | Parish of Coobeinder | Local | I20 |
| Narran Lake | Narran Lake | East of Brewarrina- Goodooga Road, north of Cato Creek | | Local | I22 |
| Weilmoringle | Denawan Aboriginal Reserve | Near Culgoa River, north east of Weilmoringle Reserve | | Local | I19 |
| Weilmoringle | Brigalow Aboriginal camping place | Macquarie River | | Local | I3 |
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
7
Conservation exclusion zones
7 Conservation exclusion zones
7 Conservation exclusion zones
(1) Must not be carried out on the following land, except to the extent necessary to gain access to water—
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Brewarrina Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Brewarrina in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the proper management of the natural and human-made resources of Brewarrina by protecting, enhancing or conserving—
(i) productive agricultural land,
(ii) timber, minerals, soils, water and other natural resources,
(iii) areas of significance for nature conservation,
(iv) areas of high scenic or recreational value,
(v) places and buildings of archaeological or heritage significance,
(b) to promote ecologically sustainable urban and rural development,
(c) to provide a secure future for agriculture by expanding Brewarrina’s economic base and minimising the loss or fragmentation of productive agricultural land,
(d) to minimise land use conflict,
(e) to ensure that development has regard to the capability of the land,
(f) to provide a choice of living opportunities and types of settlement within Brewarrina,
imposes flood-planning constraints to ensure development is compatible with flood behaviour and climate‑change projections and requires certain considerations before granting consent (cl 5.21);
disapplies or leaves unadopted some standards (e.g. height, floor space ratio and certain secondary dwelling controls are not adopted or are blank), so those standards are not fixed in this instrument (cl 4.3, cl 4.4, cl 5.5 marked as not adopted).
The Plan also contains mechanisms that directly affect private property rights and consenting outcomes: a clause that suspends covenants, agreements or instruments to the extent necessary to allow development under the Plan (cl 1.9A), subject to enumerated exceptions; a savings provision that preserves the application of the predecessor instrument to development applications lodged but not finally determined before the Plan commenced (cl 1.8A); and an exceptions-to-standards mechanism that allows the consent authority to grant consent where a development would contravene a development standard, subject to demonstrable environmental planning grounds and record-keeping (cl 4.6).
The Plan states its aims (cl 1.2), which include promoting sustainable primary production, protecting natural and cultural resources, providing choices of settlement, promoting ecologically sustainable development and protecting road efficiency. Those purpose statements are administrative guidance; the operative effect is through the clauses listed above that specify permitted uses, consent triggers and criteria the consent authority must consider.
Main concepts
The Plan is structured around a small number of recurring statutory concepts that determine decision-making, entitlements and constraints.
Zones and Land Use Table (cl 2.1-2.3, Land Use Table)
Zones allocate land to policy baskets (for example RU1 Primary Production or RU5 Village). For each zone the Land Use Table sets: zone objectives; what may be carried out without consent; what requires consent; and what is prohibited (cl 2.3(1), Land Use Table).
The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)).
Maps and Spatial Controls (cl 1.3, cl 1.7)
The Plan applies to land shown on official maps (Land Application Map, Land Zoning Map, Lot Size Map, Heritage Map, Land Reservation Acquisition Map and Obstacle Limitation Surface maps referenced later). A map is incorporated by reference and may be amended consistent with the Plan (cl 1.7).
The Department’s mapping technical requirements are referenced in cl 1.7 Note; map maintenance is organised by the Department.
Development consent as a gatekeeper (cl 2.6, cl 2.7, Part 3)
Subdivision, demolition, many new buildings and numerous other works require development consent unless expressly exempt or complying development.
Exempt and complying development concepts are adopted: Schedule 2 contains exempt development (clause 3.1) and Schedule 3 complying development, and the Plan defers to the State SEPP for the bulk of exempt/compliant rules while allowing local additions (cl 3.1 note; Schedule notes).
Minimum lot sizes and subdivision controls (cl 4.1, cl 4.1AA-4.1B, cl 4.2)
The Plan fixes minimum lot sizes via the Lot Size Map for subdivisions requiring consent (cl 4.1).
Special rules apply to community title subdivisions (cl 4.1AA), strata schemes in rural zones (cl 4.1A) and split-zone lots (cl 4.1B). Rural subdivision flexibility and limits on dwellings are in cl 4.2 and cl 4.2A; a rural worker’s dwelling test is in cl 4.2B.
Discretion and flexibility (cl 4.6, various "must be satisfied" tests)
Clause 4.6 permits consent authorities to authorise development that contravenes a development standard only where the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds; the consent authority must keep a record of that assessment (cl 4.6(2)-(4), (6)). Several other clauses require the consent authority to be satisfied of particular matters before granting consent (see cl 2.8(3) for temporary uses, cl 5.13 for eco-tourist facilities, cl 5.19 for aquaculture).
Heritage, Aboriginal and archaeological protections (cl 5.10, Schedule 5)
Development that affects heritage items, Aboriginal objects, heritage conservation areas or archaeological sites is subject to consent requirements; the clause sets out required notifications, the possibility of heritage management documents, and the Heritage Council and Aboriginal community consultation duties (cl 5.10(2)-(9)). Schedule 5 lists heritage items and their significance.
Specific sector rules (Part 5 and Schedule 6)
Aquaculture (cl 5.19 and Schedule 6) sets minimum site location and operational controls, including exclusion zones and species selection, and provides for certain small-scale development to be carried out without consent subject to location tests.
Flood planning (cl 5.21) requires consideration of flood function, climate change projections and evacuation capacity, and links to prescribed NSW guidelines.
Interaction with other legal instruments (cl 1.9, cl 1.9A, cl 5.1, cl 5.2)
The Plan sits within a broader statutory framework and references and defers to numerous Acts (Heritage Act 1977, Crown Land Management Act 2016, National Parks and Wildlife Act 1974, Rural Fires Act 1997, Fisheries Management Act 1994, Local Government Act 1993, Land Acquisition (Just Terms Compensation) Act 1991). Clause 1.9A suspends private covenants to the extent necessary to enable development under the Plan, subject to exceptions and preservation of public authority rights.
Administrative roles
The Council is the consent authority for the Plan subject to the Act (cl 1.6). Where the Plan requires consultation or notification to other agencies (for example, a relevant Commonwealth body about airspace operations at Brewarrina Airport, cl 6.4), those processes are prescribed.
Who it affects
Primary actors and stakeholders identified by the Plan are the following.
Landowners and prospective developers in the Brewarrina area
Anyone who owns or proposes to develop land shown on the Plan maps will be directly affected because the Plan determines whether particular uses are permitted with or without consent or are prohibited (cl 1.3, cl 2.2-2.3, Land Use Table). Subdivision is controlled (cl 2.6, cl 4.1) and new dwellings in rural zones have specific constraints (cl 4.2A, cl 4.2B).
Brewarrina Council (the consent authority)
The Plan designates the Council as consent authority subject to the Act (cl 1.6). The Council carries decision-making responsibilities across the Plan: assessing DAs, requiring heritage assessments, ensuring compliance with site-specific standards (for aquaculture, bushfire, flood), and keeping records where the exceptions-to-standards clause is used (cl 4.6(4)).
State agencies and other public bodies
The Plan requires or contemplates consultations with State and Commonwealth bodies in particular contexts: Heritage Council notifications for archaeological matters and nominated State heritage item demolition (cl 5.10(7), (9)); the relevant Commonwealth body in relation to aircraft Limitation or Operations Surfaces for Brewarrina Airport (cl 6.4); State agencies that administer SEPPs that prevail over the Plan (cl 1.9); and the Minister administering the National Parks and Wildlife Act in relation to acquisition powers under cl 5.1(2) table.
Traditional owners, Aboriginal communities and heritage groups
The Plan creates procedural duties to notify local Aboriginal communities and to consider responses within 28 days before granting consent for development affecting Aboriginal places of heritage significance (cl 5.10(8)). It also lists Aboriginal sites and items in Schedule 5 (for example Brewarrina fish traps, listed as State significance, Schedule 5).
Commercial operators in specific industries
Aquaculture operators: cl 5.19 and Schedule 6 impose site and operational conditions, max thresholds for intensive activities excluded from consent and require consistency with industry development plans.
Hospitality and licensed premises operators: cl 5.20 prohibits refusal of consent on the basis of music genre or dancing where noise can be managed.
Rural industries, extractive industries, and tourist operators: many zone-specific allowances or prohibitions affect these operators as listed in the Land Use Table.
Neighbours and the broader community
Nearly all consent decisions require the consent authority to have regard to local amenity, likely environmental impacts, and compatibility with nearby uses (see cl 2.3(2), cl 6.1(3)(d), cl 5.21). The Plan specifically regulates temporary uses to prevent adverse amenity effects (cl 2.8(1)-(3)) and restricts uses that would damage riverine corridors or public access along rivers (cl 6.3).
Owners of property subject to private covenants
Clause 1.9A provides that an agreement, covenant or similar instrument that restricts development does not apply so far as necessary to allow development consistent with the Plan, except for a list of named exceptions (for example, covenants imposed by the Council, conservation agreements under National Parks and Wildlife Act, various Crown-related instruments and planning agreements). The clause preserves public authority interests under registered instruments (cl 1.9A(3)). This directly affects private property rights where covenants would otherwise limit permitted uses.
Utilities and service providers
Essential services expectations (cl 6.5) make the provision of water, electricity, sewage disposal and vehicular access matters the consent authority must be satisfied about; infrastructure providers therefore are indirectly affected because development consent may require arrangements to secure those services.
Owners and managers of heritage-listed properties
Schedule 5 lists heritage items, some of which are State-significant (for example Brewarrina fish traps). For those owners any demolition, alterations or subdivision will trigger the consent and notification obligations in cl 5.10.
Finally, the Plan affects potential lenders, insurers and valuers indirectly because the Plan shapes development rights, dwelling entitlements, subdivision potential and heritage constraints that are material to property value and financing decisions. The instrument itself does not prescribe lender rights but changes the regulatory envelope in which private financial actors operate.
Key duties and rights
The Plan creates a set of positive and negative entitlements and procedural duties. Below are the principal ones drawn from operative clauses.
Duty to obtain development consent where required
Subdivision (cl 2.6) and demolition (cl 2.7) generally require development consent. Exemptions and complying development pathways are available but are governed by Schedule 2 and Schedule 3 and by State SEPPs (cl 3.1-3.2). Where works are exempt under another instrument, the Act enables them to be done without consent (cl 2.7 note).
Consent authority duties and discretionary tests
The Council, as consent authority (cl 1.6), must consider zone objectives in determining applications (cl 2.3(2)) and must be satisfied about specific matters in a range of contexts:
Temporary uses: consent only if the authority is satisfied the temporary use will not prejudice future development, not adversely affect adjoining land or neighbourhood amenity, not affect environmental attributes or increase natural hazard risk, and that the land will be restored (cl 2.8(3)-(4)).
Eco-tourist facilities: the authority must be satisfied about a detailed list of environmental and operational matters (cl 5.13(3)(a)-(k)).
Aquaculture: the authority must be satisfied that pond/tank aquaculture complies with location and operational requirements (cl 5.19(2)(a), Schedule 6).
Flood planning: consent must not be granted unless the authority is satisfied that development is compatible with flood function, does not worsen flood impacts, allows safe occupation and evacuation and manages life safety risks (cl 5.21(2)).
Airspace operations: the consent authority must consult the relevant Commonwealth body if a development will penetrate the Obstacle Limitation/Operations Surface and must refuse consent if the Commonwealth body objects (cl 6.4(2)-(4)).
Rights to exempt or complying development
The Plan incorporates exempt development concepts (cl 3.1) and complying development (cl 3.2) with references to the Building Code of Australia and to the State SEPP that specifies most exempt and complying development. This creates an alternative, faster approval pathway where conditions are met (cl 3.1(2)-(5), cl 3.2(2)-(4)).
Right to apply for an exception to a development standard
Clause 4.6 permits consent authorities to grant consent for development that would contravene a development standard, provided the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds. The consent authority must keep a record of that assessment (cl 4.6(2)-(4)). The clause expressly excludes certain standards (for complying development, BASIX commitments, clauses 5.4 and 5.5, and others) from being subject to this flexibility (cl 4.6(8)).
Duty to notify and consult in heritage and Aboriginal contexts
Before granting consent affecting an archaeological site (not on the State Heritage Register), the consent authority must notify the Heritage Council and consider any response within 28 days (cl 5.10(7)). For Aboriginal places of heritage significance the Council must notify local Aboriginal communities and consider responses within 28 days (cl 5.10(8)). For demolition of nominated State heritage items the Council must notify and consider the Heritage Council’s response (cl 5.10(9)).
Limits on private covenants
Clause 1.9A gives the Plan the effect of suspending restrictive covenants and similar instruments to the extent necessary to enable development consistent with the Plan, except for a specified list of instruments (cl 1.9A(1)-(2)). It preserves public authority rights under registered instruments (cl 1.9A(3)).
Duty to ensure essential services or arrangements to provide them (cl 6.5)
The consent authority must not grant consent unless satisfied that essential services (water, electricity, sewage disposal and management, stormwater drainage, vehicular access) are available or will be arranged (cl 6.5).
Presumptions and prohibitions
Certain development types are expressly prohibited in parts of the Plan. For example, canal estate development is prohibited (cl 2.9). The Land Use Table identifies broad prohibitions for each zone (Land Use Table entries). The Plan also identifies development that must not be carried out in environmentally sensitive areas for exempt or complying development (cl 3.3).
Record-keeping obligations
When a consent authority authorises a contravention under cl 4.6, it must keep a record of its assessment (cl 4.6(4)). This creates an administrative trail where exceptions are used.
Procedural safeguards for pre-existing development applications
Development applications made but not finally determined before the Plan commences are to be determined as if the Plan had not commenced (cl 1.8A). This preserves rights of applicants who lodged applications under the predecessor instrument.
The Plan sets out these duties and rights but does not itself specify penalty amounts or enforcement procedures; those matters are dealt with under the Environmental Planning and Assessment Act and associated regulations. The Plan does, however, define numerous conditions and consultation obligations that the consent authority must impose or consider, creating practical duties on applicants and the Council.
Penalties and enforcement
The Plan itself is an environmental planning instrument that sets development controls, consent triggers and decision-making requirements. It does not set specific fines, pecuniary penalties or detailed enforcement procedures within its text. Enforcement mechanisms therefore operate via the wider statutory framework, principally the Environmental Planning and Assessment Act and the regulations made under it, rather than by provisions inside the Plan. The Plan does, however, configure the administrative levers that lead to enforcement action under that framework; the following points explain the practical enforcement architecture implied by the Plan’s clauses.
Consent-dependency as an enforcement trigger
Clauses such as cl 2.6 (subdivision requires consent), cl 2.7 (demolition requires consent), cl 6.1 (earthworks require consent unless exempt or ancillary) and the Land Use Table create situations where carrying out development without the necessary consent will be a breach of the instrument’s controls. Enforcement for unauthorised development is enacted under the Environmental Planning and Assessment Act (not contained in the Plan text itself), which provides powers to issue stop work notices, injunctions, remediation orders and penalties.
Conditions-based compliance and monitoring
Many consent pathways require the consent authority to be satisfied about specific matters (for example cl 5.21 flood planning, cl 5.13 eco-tourist facilities, cl 5.19 aquaculture). Where consents are granted with conditions, compliance monitoring and enforcement of those conditions is carried out under the Act and the consent itself. The Plan lists matters that are suitable for conditions but does not specify compliance regimes; the Council enforces conditions through the usual mechanisms under the Act and by using its regulatory functions.
Record and transparency obligations that indirectly aid enforcement
Clause 4.6(4) requires the consent authority to keep a record of its assessment when granting consent that contravenes a development standard. That record-keeping supports transparency and may be relied upon in any enforcement or review processes, including merits review or judicial review if such avenues are invoked under the Act.
Referral and inter-agency objections with consequential refusal rights
The Plan designates referral obligations that can result in refusal if objections are raised by other agencies: for example, if the relevant Commonwealth body advises that a development penetrating Brewarrina Airport’s Limitation or Operations Surface should not be constructed, the consent authority must not grant consent (cl 6.4(4)). In such cases the objection functions as a decisive input to enforcement of the airspace protection regime.
Heritage and Aboriginal consultation obligations as pre-conditions
The Plan requires notification of the Heritage Council and local Aboriginal communities in certain circumstances (cl 5.10(7)-(9), (8)). Failure to observe these procedural steps can undermine the validity of a consent decision and may expose the decision to administrative or judicial challenge, again using remedies available under the Act.
Suspension of covenants and limits on that power
Clause 1.9A suspends covenants to the extent necessary to enable development under the Plan, subject to explicit exceptions and preservation of public authority registered interests (cl 1.9A(1)-(3)). That mechanism reduces the scope for private covenant enforcement against development that is consistent with the Plan, but it also makes explicit exceptions (e.g. covenants required by Council, certain conservation agreements) that retain enforceability. Enforcement of those remaining covenants continues through private law and relevant legislation.
Absence of penalty schedules in the Plan
The Plan does not list monetary penalties or criminal offences. Those sanctions are found in the Environmental Planning and Assessment Act 1979 and related regulations. Practitioners must therefore look to the Act and to the local council’s compliance and enforcement policies for the specific remedies and penalty amounts applicable to breaches of this Plan.
In short, the Plan creates the substantive rules and decision-making architecture for land use in Brewarrina and relies on the broader EP&A Act and other relevant statutes for enforcement, sanctions and remediation tools. The Plan’s clauses around notifications, referral obligations, and conditions create procedural gates and administrative records that materially affect enforcement outcomes, even though the Plan itself does not set out detailed penalty regimes.
How it interacts with other laws
The Plan repeatedly cross-references and nests within State and Commonwealth regimes. The following points summarise the authorised interactions and the locus of coordination between this Plan and other laws cited in the text.
State environmental planning policies and the Act
The Plan is expressly subject to any State environmental planning policy that prevails under section 3.28 of the Environmental Planning and Assessment Act (cl 1.9(1)). That means where a SEPP conflicts with this Plan, the SEPP will prevail to the extent specified in the Act. The Plan also relies on the State SEPP for the principal rules on exempt and complying development (see cl 3.1 note and Schedule 3 note referencing State Environmental Planning Policy (Exempt and Complying Development Codes) 2008).
Crown and Crown-related instruments
Clause 1.9A excludes from the covenant‑suspension rule a range of Crown instruments, and explicitly protects the rights and interests of public authorities under registered instruments (cl 1.9A(2)-(3)). Clause 5.12 confirms that the Plan does not restrict development by public authorities where those developments are permitted under State SEPP Transport and Infrastructure (cl 5.12(1)-(2)). Clause 5.1 coordinates owner-initiated land acquisition under the Land Acquisition (Just Terms Compensation) Act 1991, identifying the relevant State authority for particular types of land shown on the Land Reservation Acquisition Map (cl 5.1(2) and table).
Heritage and Aboriginal laws
The Plan integrates with the Heritage Act 1977 by referring to the State Heritage Register and interim heritage orders when limiting exempt development (cl 3.1(3)(d)). It also prescribes procedural links with the Heritage Council in archaeological and State heritage item cases (cl 5.10(7), (9)). For Aboriginal heritage, the Plan requires notification and consideration of responses from local Aboriginal communities regarding Aboriginal places of heritage significance (cl 5.10(8)).
National Parks, Crown Land, and conservation instruments
The Plan refers to the National Parks and Wildlife Act 1974 in respect of C1 zoning and to conservation agreements (cl 1.9A(2)(c); cl 5.2). It also links classification and reclassification of public land to the Local Government Act 1993 (cl 5.2) and contemplates discharge of trusts subject to the Governor’s approval where appropriate (cl 5.2(5) note).
Fisheries and aquaculture laws
Aquaculture provisions in cl 5.19 and Schedule 6 cross-reference the Fisheries Management Act 1994, the Fisheries Management (Aquaculture) Regulation 2017 and aquaculture industry development plans published under the Fisheries Act, requiring consistency with those instruments and strategies (cl 5.19(5)-(7); Schedule 6 references), and clarifying species and site requirements.
Rural fires and bushfire law
Clause 5.11 makes bushfire hazard reduction work authorised under the Rural Fires Act 1997 exempt from requiring development consent, indicating the Plan defers to the Rural Fires Act for those activities.
Building Code and BASIX
Exempt and complying development must meet the Building Code of Australia requirements (cl 3.1(3)(a)(b); cl 3.2(3)(b)). Clause 4.6(8) makes clear that the exceptions-to-standards mechanism cannot be used to contravene standards that arise from BASIX commitments or complying development standards.
Commonwealth aviation and airspace law
Airspace protections for Brewarrina Airport require consultation with the relevant Commonwealth body responsible for approvals that affect Limitation or Operations Surfaces; that Commonwealth response can be determinative (cl 6.4(2)-(4)).
Local Government Act and land classification
The Plan explicitly invokes the Local Government Act 1993 for the classification or reclassification of public land as operational or community land and notes the Governor’s approval may be required to discharge trusts (cl 5.2 and notes).
Acquisition law
Clause 5.1 is framed to operate with the Land Acquisition (Just Terms Compensation) Act 1991 and identifies the State authority that will be relevant where owner-initiated acquisition is pursued. The Plan notes section 23 of that Act where delay would cause hardship (cl 5.1 note).
Regulatory hierarchy and practical effect
The Plan operates as the local tier of planning regulation and is intentionally structured to yield to State and Commonwealth law. Where the Plan conflicts with a SEPP it is subordinate (cl 1.9(1)), and where the Plan requires consultation with another authority (heritage, Commonwealth aviation, Fisheries, Department of Primary Industries), the other authority’s statutory remit will be a material input into decision-making under the Act as applied by the Council.
In short, the Plan is tightly interwoven with multiple State and Commonwealth regimes. Practitioners must therefore, when advising or preparing applications, consider the Plan in combination with the EP&A Act, relevant SEPPs, the Heritage Act, Fisheries legislation, the Local Government Act, the Land Acquisition Act and Commonwealth aviation rules where relevant. The Plan itself provides the local rules and thresholds and identifies the precise interaction points.
Amendment history
The Plan text includes amendment annotations and notes at several clauses. These annotations are the Plan’s internal record of legislative amendments and map/administrative changes; they indicate the instrument has been amended over time and identify particular clauses changed. The Plan’s notable amendment annotations in the provided text are listed below with the clause references as they appear in the source:
Clause 1.8A (Savings provision relating to development applications) includes an amendment note: "cl 1.8A: Am 2019 (621), Sch 5[1]". This shows the savings provision was added or altered by an instrument in 2019 identified in the source as 2019 (621).
Clause 1.9A (Suspension of covenants, agreements and instruments) has the note "cl 1.9A: Am 2019 (621), Sch 5[2]-[4]". That record indicates the covenant‑suspension clause was inserted or amended in 2019.
The Land Use Table is annotated with multiple amendments: "Land Use tbl: Am 2019 (137), Sch 6 [1]; 2022 (314), Sch 1; 2023 (458), Sch 2.12." Those entries reflect alterations to the Land Use Table across 2019, 2022 and 2023.
Clauses relating to subdivision and strata/community schemes were recently amended: cl 4.1A (Minimum subdivision lot size for strata plan schemes...) is marked "cl 4.1A: Am 2024 (42), Sch 1.8[1]"; cl 4.2A (Erection of dwelling houses on land in certain rural and residential zones) is "cl 4.2A: Am 2024 (42), Sch 1.8[2]"; cl 4.6 (Exceptions to development standards) has "cl 4.6: Am 2024 (42), Sch 1.8[3]". These notes show amendments made in 2024.
Clause 6.2 is listed as repealed with the note "cl 6.2: Rep 2021 (225), Sch 1." Map-related administrative changes are noted "Maps: Am 2016 (572), cl 4; 2020 (705), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment."
Clause 5.4 (Controls relating to miscellaneous permissible uses) includes "cl 5.4: Am 2018 (406), Sch 1.21 [1] [2]" indicating a 2018 amendment.
What the amendment notes show functionally
The Plan has been updated at least periodically to reflect State legislative changes (for example, incorporation of new clauses relating to strata community lot sizes and exceptions to standards in 2024) and to adjust local land use rules via the Land Use Table in multiple years. The Plan’s notes give the specific amending instruments by year and schedule reference as they appear in the Plan.
Amendments that add or modify procedural or substantive controls (for example cl 1.9A in 2019, cl 4.6 changes in 2024) change landowner rights, covenant treatment and the discretion available to consent authorities. Each of these amendments will be recorded in the formal amending instruments referenced in the notes.
Limitations of the Amendment History provided here
The Plan as provided contains in-text amendment notes only. It does not reproduce the full amending instruments, their explanatory memoranda, or the parliamentary or ministerial reasoning that accompanied those amendments. For the full legislative history, one must consult the amending instrument records cited in the notes (for example "2019 (621), Sch 5[1]" etc.) and the NSW legislation revision history available on the official portal.
Practitioners should, when advising on historic entitlements or on the applicability of a prior LEP, review the specific amending instruments and commencement dates because procedural protections such as cl 1.8A preserve rights for DAs lodged before the Plan’s commencement. The Plan’s in-text amendment notes point to the principal changes and their dates and therefore guide where to look for further documentary detail.
Litigation history
The Plan text supplied does not include any judicial decisions, case names or litigation history. It lists statutory provisions, schedules and amendment annotations, but it does not record any court challenges, merits review decisions, or precedents interpreting its clauses. There are therefore two immediate points practitioners should note:
The Plan itself does not present or summarise any litigation. It contains no citations to cases nor any decisions interpreting particular clauses such as cl 4.6 (exceptions to development standards), cl 1.9A (suspension of covenants), cl 5.10 (heritage), cl 5.19/Schedule 6 (aquaculture) or any other operative provision.
As a matter of practice, many of the Plan’s operative clauses are the sort of provisions that commonly generate litigation or merits review in other contexts: discretionary satisfaction tests (cl 2.8(3), cl 5.13(3)), exceptions to development standards requiring records (cl 4.6), heritage and Aboriginal consultation obligations (cl 5.10), and covenant-suspension (cl 1.9A) are all provisions that tend to be litigated in other LEP contexts when applicants or objectors assert misapplication. But the supplied instrument does not purport to identify any such litigation.
Recommendation for research
To establish authoritative litigation history or judicial interpretation of the Plan’s clauses, consult NSW case law databases and administrative tribunal records for decisions mentioning "Brewarrina Local Environmental Plan 2012" or the specific clause numbers. Also search for judicial review proceedings and merits review decisions involving the Brewarrina Council where these clauses were determinative. The Plan’s amendment notes give dates that may help locate cases that postdate particular amendments.
In short, the source document contains no litigation history. Practitioners should undertake targeted case-law research if precedent on the Plan’s clauses is needed for a development application, objection, or challenge.
Gotchas
The Plan contains a number of features that commonly trap applicants, advisers and neighbouring landowners if overlooked. The following are concrete provisions and procedural points that merit attention in practice.
Pre-commencement savings for pending applications (cl 1.8A)
A development application lodged but not finally determined before the Plan commenced must be determined as if the Plan had not commenced (cl 1.8A). This preserves expectations for applicants who relied on the predecessor instrument. Confirm the DA lodgement and final determination dates before advising on which instrument applies.
Suspension of covenants with statutory exceptions (cl 1.9A)
Clause 1.9A suspends private covenants to the extent necessary to implement development consistent with the Plan, but it does not apply to covenants imposed by the Council, certain Crown and conservation instruments, or planning agreements (cl 1.9A(2)). It also preserves public authority rights under registered instruments (cl 1.9A(3)). Practically, this can change the bargaining position of private covenant holders and could lead to disputes of interpretation (what is "necessary to serve that purpose" in subclause (1)?),however the Plan requires no private law compensation; it simply removes the legal bar of the covenant for permitted Plan uses except where exceptions apply.
Minimum lot sizes and strata/community exceptions (cl 4.1, cl 4.1AA, cl 4.1A)
Minimum lot sizes on the Lot Size Map are binding for subdivisions requiring consent (cl 4.1(3)), but there are separate rules for community title schemes and strata schemes (cl 4.1AA, cl 4.1A). Practitioners must check whether a proposed subdivision is a strata, community title, or other form; cl 4.1A explicitly applies to strata schemes in RU1 and R5 zones to prevent new dwelling entitlements by fragmentation. Recent amendments in 2024 affect these rules and change drafting for rural subdivision advice.
Exceptions-to-standards record-keeping and limits (cl 4.6)
The Plan allows contraventions of development standards only if the applicant demonstrates particular matters and the consent authority records its assessment (cl 4.6(2)-(4)). There are explicit exclusions (cl 4.6(8)) such as complying development standards and BASIX commitments. When advising on an exceptions application, include the necessary grounds, and advise clients the Council must keep an assessment record, which can be material in any review.
Heritage and Aboriginal consultation timing traps (cl 5.10)
For archaeological sites not listed on the State Heritage Register the consent authority must notify the Heritage Council and consider any response within 28 days (cl 5.10(7)). For Aboriginal places of heritage significance the local Aboriginal communities must be notified and their responses considered within 28 days (cl 5.10(8)). Practitioners must factor these minimum notification periods into program timing; failure to follow the process can undermine a consent.
Music and licensed premises (cl 5.20)
The Plan prevents a consent authority refusing consent to licensed premises on grounds relating to genre, live or amplified music, dancing, stage direction, and certain decorations provided noise can be "managed and minimised to an acceptable level" (cl 5.20(1)-(2)). This overrides some common objections rooted in amenity concerns and changes how objectors and councils should frame noise-related conditions,focus shifts to measurable noise control rather than categorical refusals based on entertainment type.
Canal estates and river front constraints (cl 2.9, cl 6.3)
Canal estate development is prohibited (cl 2.9). River front areas are tightly regulated: cl 6.3 permits only specific uses within 100 metres of the listed rivers and only in RU1 for those uses, subject to strict environmental and public access tests (cl 6.3(2)-(3)). Proposals near those rivers will face a steep evidentiary hurdle.
Aquaculture operational and exclusion zones (cl 5.19 and Schedule 6)
Aquaculture may be permitted without consent in narrow circumstances (cl 5.19(4), (6)), but most pond/tank aquaculture requires the consent authority to be satisfied of site and operational requirements (cl 5.19(2)). Schedule 6 includes conservation exclusion zones and operational rules (for example no discharge of freshwater from intensive systems to natural waterbodies except open flow-through systems, Schedule 6 cl 4). Applicants must map their sites against the Schedule’s exclusion zones and appropriate industry plans.
Essential services precondition (cl 6.5)
The consent authority must be satisfied that essential services are available or arranged before granting consent (cl 6.5). This turns utility availability into a gating issue; applicants should secure written commitments or demonstrate arrangements before lodging, particularly in unsewered or remote areas.
Blank and not-adopted clauses (height, FSR, secondary dwelling controls)
The Plan explicitly marks several clauses as "Not adopted" or "Not applicable" (for example cl 4.3 height of buildings; cl 4.4 floor space ratio; cl 5.5 controls relating to secondary dwellings on land in a rural zone). That can create uncertainty where no local numeric standard is set; default reliance will be on other instruments or the exercise of discretion under the Act. Practically, this means check whether a SEPP or the Act provides the missing standard or whether the Council will impose localised design-based controls.
Airspace referral is decisive (cl 6.4)
If a development would penetrate Brewarrina Airport’s Limitation or Operations Surface, the consent authority must consult the relevant Commonwealth body and must not grant consent if that body advises against construction (cl 6.4(2)-(4)). Early referral to the Commonwealth aviation body is mandatory where penetration is possible.
Temporal limits on temporary uses and particular exceptions (cl 2.8)
Temporary uses are limited to 30 days within a 12-month period unless they are sales offices for new housing releases (cl 2.8(2)-(5)). If a proponent expects repeated short-term uses, they must plan for multiple approvals or look for specific exemptions.
Borderline and split zone subdivision rules (cl 4.1B)
When an original lot falls in more than one zone (for example R5 and RU1), cl 4.1B prescribes that one resulting lot must contain all the RU1 land and meet minimum sizes. Proponents must model resulting lot boundaries carefully to comply.
These are concrete procedural and substantive constraints that affect project timing, risk allocation, evidence requirements and the scope for negotiation with Council or other agencies.
How to comply
This section sets out pragmatic steps and evidence points that applicants, advisers and council officers should use to comply with the Plan. All references are to clauses in the Plan.
Determine which instrument and maps apply
Check the Land Application Map and Land Zoning Map (cl 1.3, cl 1.7) to establish whether the land falls within the Plan, which zone applies and whether any Lot Size Map, Heritage Map, Land Reservation Acquisition Map or Obstacle Limitation Surface maps are relevant. The Plan’s mapping is the primary spatial reference for zoning, minimum lot sizes and special overlays.
Confirm whether the proposed development is permitted, requires consent, or is prohibited
Use the Land Use Table and the zone objectives (cl 2.3, Land Use Table entries) to determine whether the use is permitted without consent, permitted with consent or prohibited. If the use is not listed, check "Any other development not specified" entries in the relevant zone but also verify Zoning Map annotations and Schedule 1 for any local additional permitted uses (cl 2.5).
Check exempt and complying development pathways
Determine whether the proposal qualifies as exempt or complying development. The Plan defers primarily to the State SEPP on exempt and complying development (cl 3.1 note, cl 3.2 note). If relying on an exempt/complying pathway, ensure full compliance with the Building Code of Australia and any conditions in Schedule 2 or Schedule 3 and check for any environmentally sensitive area exclusions (cl 3.1(3)(a), cl 3.3).
For development requiring consent, prepare the decision-grade materials the consent authority must consider
Address zone objectives and demonstrate compatibility with zone outcomes (cl 2.3(2)).
Heritage: where heritage items, heritage conservation areas, Aboriginal objects or archaeological sites are involved, prepare a heritage management document or heritage impact statement as required and follow notification obligations to the Heritage Council and local Aboriginal communities (cl 5.10(4)-(9)). Allow at least the statutory 28-day consultation windows.
Flood planning: for land within the flood planning area ensure the DA demonstrates compatibility with flood function, does not worsen flood behaviour, includes life-safety and evacuation planning, and addresses climate change projections (cl 5.21(2)-(3)), referencing the Considering Flooding in Land Use Planning Guideline as necessary (cl 5.21(4)-(5)).
Aquaculture: for pond/tank or oyster aquaculture, ensure compliance with cl 5.19 and Schedule 6 , show site locations outside conservation exclusion zones, adopt required pond design and discharge controls, and align species selection with the published aquaculture industry development plan (cl 5.19(2), Schedule 6 cl 1-4). For proposals claiming the without-consent pathways, confirm site is within the specified zones and meets the size/location tests in cl 5.19(4) and (6).
Bushfire and environmental constraints: where bushfire hazard reduction or bushfire prone land is relevant, coordinate with the Rural Fires Act requirements and provide required bushfire assessment material (cl 5.11 note).
Check essential services and obtain evidence of arrangements
Secure written evidence that essential services will be available or that acceptable arrangements are in place (water, electricity, sewage, stormwater management, vehicular access), because the consent authority must be satisfied before granting consent (cl 6.5).
Consider subdivision, strata and community title rules early
If subdivision is contemplated, verify minimum lot sizes on the Lot Size Map (cl 4.1(3)), and whether the proposal is caught by cl 4.1AA/4.1A/4.1B. If a strata or community title outcome is intended, ensure compliance with separate minimum lot size rules and check that the proposal will not create additional dwelling entitlements in rural zones (cl 4.1A, cl 4.1AA).
Where a development standard would be contravened, prepare an exceptions submission
If a proposed development would contravene a development standard, prepare the justification required by cl 4.6(3): demonstrate compliance with the development standard is unreasonable or unnecessary and articulate sufficient environmental planning grounds. Remember the consent authority must keep a record of that assessment (cl 4.6(4)). Also note that certain standards are excluded from cl 4.6 (cl 4.6(8)), so determine whether the proposed contravention is eligible.
Address covenant issues and private instruments
Identify registered covenants and other instruments. If a covenant appears to prevent a Plan-consistent use, cl 1.9A may operate to suspend that covenant to the extent necessary, but confirm the covenant is not one of the exceptions listed in cl 1.9A(2). If in doubt, obtain legal advice and check the Register and the Council’s view.
Allow time for required referrals and notifications
Build the 28-day consultation windows and referral lead times into the project timetable (heritage council, Aboriginal community, Commonwealth aviation body under cl 6.4). For Brewarrina Airport airspace matters, consult the relevant Commonwealth authority early,an adverse Commonwealth response is a bar to consent (cl 6.4(2)-(4)).
Prepare conditions and compliance mechanisms for post-approval
Draft conditions that reflect the Plan’s operational requirements (for example aquaculture discharge controls in Schedule 6, heritage conservation works required in any heritage management document, and any site restoration requirements for temporary uses cl 2.8(3)(d)). Ensure the consent discharges liabilities under other Acts where relevant.
Record-keeping and transparency
If seeking any exception to a development standard or relying on other discretionary powers, ensure the consent application includes the grounds and supporting evidence so the consent authority can prepare the record required by cl 4.6(4) and other record requirements.
Consider risk of review and appeal
Because discretionary satisfactions, heritage and covenant issues can be grounds for administrative review, advise clients on the potential need for merit review or judicial review remedies available under the Environmental Planning and Assessment Act if the Council’s decision is adverse. While the Plan does not set those remedies, the Act provides them.
Special operator notes
Licensed premises wanting to rely on entertainment should prepare a noise management plan demonstrating that noise can be managed and minimised to an acceptable level (cl 5.20(2)).
For bushfire hazard reduction work carried out under the Rural Fires Act 1997, development consent is not required (cl 5.11).
Final administrative checks
Before lodging a DA ensure building classification, fire safety certificates and BASIX commitments (where relevant) are addressed because exemptions, complying pathways and certain development standards are tied to Building Code and BASIX compliance (cl 3.1(3)(a)(b), cl 3.2(3)(b), cl 4.6(8)).
In practice, compliance requires a multi-disciplinary pack: site plans that reference the Lot Size Map and overlays; engineering reports addressing services and flood/erosion; heritage and Aboriginal engagement reports where relevant; aquaculture-specific technical design statements if applicable; and legal checks on covenants and registered interests. Early engagement with Council, and with any State or Commonwealth referral authority indicated by the Plan, will materially reduce implementation risk.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Brewarrina Local Environmental Plan 2000
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU5 Village
Residential Zones
R5 Large Lot Residential
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
Conservation Zones
C1 National Parks and Nature Reserves
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 30 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involve
This is an opening excerpt, not the complete document.