Autonomous Sanctions (Russia, Crimea and Sevastopol) Specification 2015
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
Autonomous Sanctions (Russia, Crimea and Sevastopol) Specification 2015
Start here
Turn the raw legal text into a practical explanation grounded in Autonomous Sanctions (Russia, Crimea and Sevastopol) Specification 2015.
4 Effective date for specification of an export sanctioned good
For regulation 4 of the Autonomous Sanctions Regulations 2011, the date on which the specification of an export sanctioned good in Schedule 1 takes effect shall be:
(a) for a good that is the subject of:
(i) a trade contract concluded before the date on which that kind of good was listed in Schedule 1 (the listing date); or
(ii) an ancillary contract necessary for the execution of such a contract; or
(iii) a contract or agreement concluded before the listing date and
relating to an investment in Russia, Crimea or Sevastopol made before the listing date,
the thirtieth day following the listing date;
(b) in all other circumstances, the listing date.
Sanctioned commercial activity – specifications
For subregulations 5B(1) and 5B(3) of the Autonomous Sanctions Regulations 2011, the period is a maturity exceeding 30 days.
For paragraph 5B(6)(a) of the Autonomous Sanctions Regulations 2011, the institutions mentioned in an item in the table are specified:
| Item | Name of Institution |
|---|---|
| 1. | Sberbank |
| 2. | VTB Bank |
| 3. | Gazprombank |
| 4. | Vnesheconombank (VEB) |
| 5. | Rosselkhozbank |
| Item | Name of Institution |
|---|---|
| 1. | OPK Oboronprom |
| 2. | United Aircraft Corporation |
| 3. | Uralvagonzavod |
| Item | Name of Institution |
|---|---|
| 1. | Rosneft |
| 2. | Transneft |
| 3. | Gazprom Neft |