Australian Renewable Energy Agency (General Funding Strategy) Approval 2025
In ForceCTH
Jurisdiction
Commonwealth
Collection
legislative instrument
Plain English Summary
5/10 complexity
This instrument approves ARENA’s General Funding Strategy (GFS) for 2025/26–2027/28 and replaces the 2024 GFS. It sets ARENA’s funding priorities, rules that ARENA may only enter into financial assistance consistent with the approved GFS, and requires the ARENA Board to publish the strategy. Taxpayers provide ARENA’s funding; the Minister approves the GFS and ARENA decides which projects to fund within the GFS rules and applicable Acts.
This legislative instrument formally approves a new General Funding Strategy (GFS) for the Australian Renewable Energy Agency covering the three financial years 2025/26 to 2027/28. It is made under subsection 20(2) of the Australian Renewable Energy Agency Act 2011 (Cth) and repeals the previous 2024 approval instrument. The legal effect is that from the moment the Minister signs it, the new GFS comes into force and the old one ceases to operate. The instrument itself is short. It contains only six operative sections: name, commencement, authority, definitions, a schedule-amendment clause, and the approval provision. The real substance resides in Schedule 1, which sets out the GFS document that guides how ARENA provides financial assistance over the relevant period.
Mechanically, the approval does two things. First, it authorises ARENA to enter into agreements to provide financial assistance that are consistent with the new GFS. Under section 21 of the ARENA Act, ARENA may not enter into a financial assistance agreement unless the assistance is in accordance with the GFS in force at the time. This instrument therefore directly controls ARENA’s spending capacity. Second, Schedule 2 repeals the Australian Renewable Energy Agency (General Funding Strategy) Approval 2024 in its entirety. That is a clean replacement: no transitional provisions, no savings, and no grandfathering of pre-existing arrangements. Any funding commitments already made under the old GFS presumably continue under their existing agreements, but new commitments must align with the new strategy.
The GFS itself is a high‑level policy document, not a detailed budget line item. It states principal objectives and priorities, but leaves the specifics of which projects get funded to ARENA’s Investment Plan and individual program guidelines. The instrument does not appropriate money; that is done separately through the annual appropriation acts and the portfolio budget statements. What it does is constrain ARENA’s discretion to those projects that fall within the GFS’s stated strategic priorities. Those priorities include unlocking ultra low‑cost solar, optimising the transition to renewable electricity, commercialising renewable hydrogen, supporting low‑emissions metals, and decarbonising transport. Additional funded programs are listed: the Future Made in Australia Innovation Fund, the Battery Breakthrough Initiative, Solar Sunshot, the Industrial Transformation Stream, Hydrogen Headstart, and the First Nations Community Microgrids stream. The instrument also implicitly confirms the $7.1 billion funding envelope over 16 years announced in the May 2024 Federal Budget under the Future Made in Australia package.
Current sections
Direct links to the current provisions in Australian Renewable Energy Agency (General Funding Strategy) Approval 2025.
6
1
Name
1 Name
This instrument is the Australian Renewable Energy Agency (General Funding Strategy) Approval 2025.
2
Commencement
2 Commencement
(1) Each provision of this instrument specified in column 1 of the table commences, or is taken to have commenced, in accordance with column 2 of the table. Any other statement in column 2 has effect according to its terms.
<table cellspacing="0" cellpadding="0" style="margin-left:5.25pt; border-collapse:collapse"><tbody><tr style="height:15pt"><td colspan="3" style="width:407.5pt; border-top:1.5pt solid #000000; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Commencement information</span></p></td></tr><tr style="height:15pt"><td style="width:95.65pt; border-top:1pt solid #000000; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Column 1</span></p></td><td style="width:209pt; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Column 2</span></p></td><td style="width:81.45pt; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Column 3</span></p></td></tr><tr style="height:15pt"><td style="width:95.65pt; border-top:1pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Provisions</span></p></td><td style="width:209pt; border-top:1pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Commencement</span></p></td><td style="width:81.45pt; border-top:1pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Date/Details</span></p></td></tr><tr style="height:15pt"><td style="width:95.65pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt">1.</span><span style="font-size:10pt"> </span><span style="font-size:10pt">The whole of this instrument</span></p></td><td style="width:209pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt">The day on which the instrument is made by the Minister in accordance with subsection 20(2) of the </span><span style="font-size:10pt; font-style:italic">Australian Renewable Energy Agency Act 2011</span><span style="font-size:10pt; font-style:italic"></span></p></td><td style="width:81.45pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span></span></p></td></tr></tbody></table>
Note: This table relates only to the provisions of this instrument as originally made. It will not be amended to deal with any later amendments of this instrument
Note: Subsection 20(2) of the Act provides for an approved general funding strategy to be a legislative instrument on the day on which the strategy is approved. Subsection 21(1) of the Act has the effect that a general funding strategy approved after the commencement of a financial year commences from the time when the Minister approves the strategy
3
Authority
3 Authority
This instrument is made under subsection 20(2) of the Australian Renewable Energy Agency Act 2011.
4
Definitions
4 Definitions
In this instrument:
Act means the Australian Renewable Energy Agency Act 2011.
Note: A number of expressions used in this instrument are defined in the definitions section of the Act, including the following:
Australia’s greenhouse gas emissions reduction targets
Financial assistance
Paris Agreement
Renewable energy technologies
5
Schedules
5 Schedules
Each instrument that is specified in a Schedule to this instrument is amended or repealed as set out in the applicable items in the Schedule concerned, and any other item in a Schedule to this instrument has effect according to its terms.
6
Approval of General Funding Strategy
6 Approval of General Funding Strategy
For subsection 20(2) of the Act, the General Funding Strategy 2025/26 – 2027/28 at Schedule 1 is approved.
Sourced from the Federal Register of Legislation (legislation.gov.au), CC BY 4.0.
1 Name
1 Name
This instrument is the Australian Renewable Energy Agency (General Funding Strategy) Approval 2025.
2 Commencement
2 Commencement
(1) Each provision of this instrument specified in column 1 of the table commences, or is taken to have commenced, in accordance with column 2 of the table. Any other statement in column 2 has effect according to its terms.
<table cellspacing="0" cellpadding="0" style="margin-left:5.25pt; border-collapse:collapse"><tbody><tr style="height:15pt"><td colspan="3" style="width:407.5pt; border-top:1.5pt solid #000000; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Commencement information</span></p></td></tr><tr style="height:15pt"><td style="width:95.65pt; border-top:1pt solid #000000; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Column 1</span></p></td><td style="width:209pt; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Column 2</span></p></td><td style="width:81.45pt; border-bottom:1pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Column 3</span></p></td></tr><tr style="height:15pt"><td style="width:95.65pt; border-top:1pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Provisions</span></p></td><td style="width:209pt; border-top:1pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Commencement</span></p></td><td style="width:81.45pt; border-top:1pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt; font-weight:bold">Date/Details</span></p></td></tr><tr style="height:15pt"><td style="width:95.65pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt">1.</span><span style="font-size:10pt"> </span><span style="font-size:10pt">The whole of this instrument</span></p></td><td style="width:209pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span style="font-size:10pt">The day on which the instrument is made by the Minister in accordance with subsection 20(2) of the </span><span style="font-size:10pt; font-style:italic">Australian Renewable Energy Agency Act 2011</span><span style="font-size:10pt; font-style:italic"></span></p></td><td style="width:81.45pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top"><p style="margin-top:3pt"><span></span></p></td></tr></tbody></table>
For practitioners, the key takeaway is that any entity seeking ARENA funding must ensure its project fits within one of these stated priorities or the specific listed programs. The GFS does not create private rights of action or impose statutory duties on applicants. It is an internal governance document approved by the Minister, and its binding force operates on ARENA, not on third parties. However, because ARENA cannot lawfully provide financial assistance outside the GFS, the instrument creates a de facto constraint on the universe of fundable projects.
Main concepts
The GFS introduces several important concepts that shape how ARENA allocates public money. The most central is the “General Funding Strategy” itself. Under section 20 of the ARENA Act, ARENA must develop a GFS each financial year that sets out its principal objectives and priorities for providing financial assistance over the current and next two financial years. The GFS must be approved by the Minister, and once approved, it becomes a legislative instrument. This means it is subject to parliamentary scrutiny under the Legislation Act 2003 (Cth), although in practice most legislative instruments are not disallowed. The GFS expires when the next year’s GFS comes into force. The concept therefore creates a rolling three‑year planning horizon, but with a yearly approval cycle that forces ARENA to refresh its priorities regularly.
The GFS document itself articulates several guiding principles for prioritising projects: maximum impact, responsiveness, diversity, and commercial focus. Maximum impact means ARENA considers long‑term potential, high contribution to mission, and additionality (i.e., that ARENA support is genuinely needed and not duplicating other funding). Responsiveness means the agency adapts to market conditions and technology developments. Diversity means maintaining a portfolio across different stages of commercialisation, from early‑stage research through to pre‑commercial deployment. Commercial focus means ARENA provides the minimum financial assistance needed, and where possible negotiates recoupment mechanisms to recover some or all grant funding if a project generates upside. These principles are not legally enforceable by applicants; they are internal guidelines that the Board applies when making funding decisions.
The strategic priorities themselves are the substantive content. For 2025‑26 to 2027‑28, they are: ultra low‑cost solar, transition to renewable electricity, renewable hydrogen, low emissions metals, and decarbonisation of transport. Each reflects the mission to support the global transition to net zero emissions. The GFS also lists targeted programs that ARENA will deliver using its expertise in grant funding: the Future Made in Australia Innovation Fund, Battery Breakthrough Initiative, Solar Sunshot, Industrial Transformation Stream (part of the Powering the Regions Fund), Hydrogen Headstart, and the First Nations Community Microgrids stream (part of the Regional Microgrids Program). These programs appear to be funded from the $7.1 billion allocation, but the GFS does not specify dollar amounts per program.
Another key concept is the relationship between the GFS, the Corporate Plan, and the Investment Plan. The Corporate Plan is ARENA’s primary planning document under the PGPA Act. It sets overall strategy, vision, purpose, and risk management. The GFS is a component of that broader plan, specifically focused on the provision of financial assistance. The Investment Plan then details the actual funding programs, eligibility criteria, and application processes. The GFS sits at an intermediate level: more specific than the Corporate Plan but less detailed than the Investment Plan. For anyone applying for ARENA funding, the Investment Plan is the operative document, but it must be consistent with the GFS.
Finally, the concept of “knowledge sharing” appears in the purpose statement. ARENA’s purpose includes sharing knowledge from funded projects to accelerate innovation. This is a non‑financial output, but it may create obligations on grant recipients to report findings publicly. The GFS does not impose specific knowledge‑sharing conditions, but ARENA’s standard grant agreements likely include such terms.
Who it affects
The most directly affected persons are the ARENA Board and its staff. The GFS binds ARENA in that it cannot enter into financial assistance agreements that fall outside the approved priorities. The Board must ensure that the GFS is published on ARENA’s website, and that funding decisions conform to it. The instrument therefore constrains bureaucratic discretion. However, it also gives the Board a safe harbour: as long as a project fits a stated priority, the Board has statutory authorisation to fund it.
More broadly, the instrument affects any Australian researcher, innovator, business, or consortium that hopes to obtain ARENA funding. Such entities must align their project applications with one of the five strategic priorities or the listed targeted programs. For example, a company developing advanced solar photovoltaic technology might qualify under “unlock ultra low‑cost solar”. A steelmaker exploring hydrogen‑based direct reduction might fit “low emissions metals”. A transport company developing electric truck charging infrastructure might fall under “decarbonise transport”. Conversely, projects that do not fit these categories - for instance, geothermal energy, tidal power, or nuclear energy - would likely be ineligible regardless of merit, because the GFS does not list them. The instrument therefore has a concentrating effect on innovation: it funnels public subsidy toward a narrow set of technology pathways chosen by the government, not by the market.
Taxpayers are indirectly affected. The $7.1 billion over 16 years represents a significant fiscal commitment. The GFS does not specify how much will be spent in each year or program, so the opportunity cost is not transparent. The money could have been returned to taxpayers or spent on other priorities. The instrument does not include any cost‑benefit analysis or requirement for ex‑post evaluation of whether the funded projects actually deliver the promised emissions reductions or commercial improvements. There is a risk of rent‑seeking: firms will invest resources in lobbying for grants rather than in commercial activity, and the government’s choice of priorities may not reflect the most efficient pathways to lower emissions.
Indirectly, the instrument affects competitors in the energy sector. Subsidised projects can undercut unsubsidised competitors, distorting prices and investment signals. For example, if ARENA provides grants for renewable hydrogen production, it may lower the effective cost for those producers, making it harder for unsubsidised hydrogen or other low‑carbon fuels to compete. Similarly, preferential funding for ultra low‑cost solar could disadvantage other renewable technologies. The GFS acknowledges this risk by stating it will consider “additionality” and “minimal overlap with other grant‑funding efforts in the ecosystem”, but the criteria are subjective and leave wide discretion to ARENA.
First Nations communities are specifically mentioned in the context of the Regional Microgrids Program, which includes a First Nations Community Microgrids stream. This may affect Indigenous land councils, community organisations, and energy developers working in remote areas. While framed as a benefit, it also creates a targeting effect: only microgrid projects that serve First Nations communities and meet ARENA’s criteria will receive funding, which may crowd out privately financed alternatives.
Key duties and rights
The instrument imposes duties primarily on ARENA, not on private parties. The central duty is that ARENA must not enter into an agreement to provide financial assistance unless the assistance is in accordance with the GFS in force at the time (section 21 of the ARENA Act). This is a statutory constraint on ARENA’s contracting power. The GFS itself adds a specific duty: the ARENA Board must ensure the GFS is published on ARENA’s website (Schedule 1, section 1). That is a transparency obligation, though the timing is not specified beyond “when the GFS comes into force”.
For applicants, there is no right to receive financial assistance. The GFS does not create a statutory entitlement. Even if a project fits a strategic priority perfectly, ARENA retains full discretion to approve or reject it. The GFS says ARENA will use its “expertise in grant funding” and “strive to achieve maximum impact and value”, but these are aspirational, not justiciable. An unsuccessful applicant cannot sue for breach of the GFS or the ARENA Act. The instrument therefore creates no new rights enforceable by third parties.
There is a duty on the Minister to approve the GFS under subsection 20(2) of the ARENA Act. This duty is procedural: the Minister must decide whether to approve or not. Once approved, the instrument is made and commences. The Minister also has power to reject or modify a proposed GFS before approval, but the instrument does not address what happens if the Minister fails to approve.
For the ARENA Board and CEO, the GFS creates a duty to ensure compliance with the PGPA Act and the ARENA Act when providing financial assistance. The GFS states that it “guides” how ARENA provides financial assistance in accordance with the ARENA Act, associated regulations, and the PGPA Act. This includes duties of proper use of Commonwealth resources, efficiency, effectiveness, and accountability under the PGPA Act. However, the GFS itself does not add new penalties beyond those in the general law.
A noteworthy feature is the recoupment mechanism. The GFS states that where there is possibility of upside from a project, ARENA may negotiate a recoupment mechanism that sees some or all grant funding returned. This creates a contractual right for ARENA, but the duty to include such a mechanism is not absolute. It says “may negotiate”, not “must”. This gives ARENA flexibility. For recipients, the duty is to comply with the terms of their grant agreement, which may include recoupment obligations. Failure to comply could result in debt recovery actions. But the GFS does not prescribe the form or quantum of recoupment.
Recipients should also be aware of knowledge‑sharing obligations. The GFS states ARENA’s purpose includes “sharing knowledge” from projects. This suggests that grant agreements will include conditions requiring recipients to provide data, reports, or public disclosures. While not a duty under the GFS itself, it is a likely contractual term.
Penalties and enforcement
The instrument itself contains no penalty provisions. It does not create criminal offences, civil penalties, or infringement notices. Enforcement of the GFS is indirect, operating through the machinery of the ARENA Act and the PGPA Act. If ARENA were to provide financial assistance outside the GFS, that would be a breach of section 21 of the ARENA Act. The consequences would be legal, not punitive: any agreement entered into without GFS authorisation may be void or unenforceable for lack of statutory power. The Commonwealth would likely seek to recover any money paid. Officers could be subject to action under the PGPA Act for improper use of Commonwealth resources, potentially leading to suspension, dismissal, or surcharge for loss caused.
For private recipients of ARENA funding, the relevant enforcement mechanisms lie in the grant agreement. Standard clauses typically include milestone reporting, performance metrics, audit rights, and clawback provisions. If a recipient fails to deliver as promised or misuses funds, ARENA can suspend or terminate the grant and demand repayment. The GFS’s mention of recoupment mechanisms - where ARENA may recover some or all funding if a project generates upside - is a contractual right, not a penalty. It reflects an attempt to ensure value for money, but it creates an additional compliance risk for recipients: even a successful project may require returning part of the grant.
Officers of recipient companies should also be aware of the Criminal Code (Cth) offences for obtaining financial advantage by deception or for fraud against the Commonwealth. Submitting false information to secure a grant could attract prosecution. The GFS does not refer to this, but it is a background risk.
There is no private right of action for competitors or third parties if ARENA funds a project that they believe should not have been funded. Judicial review under the Administrative Decisions (Judicial Review) Act 1977 (Cth) is theoretically available to challenge ARENA’s decision if it is legally unreasonable or procedurally unfair, but such challenges face high hurdles. The GFS does not create a duty to invite public comment or to publish reasons for individual funding decisions. The instrument is a legislative instrument, not a decision affecting a particular person, so it is not reviewable under ADJR. However, a decision to grant or deny a specific application could be.
In practice, the main enforcement lever is the annual reporting cycle under the PGPA Act. ARENA must report on its performance, including against the GFS priorities. Poor performance could lead to Ministerial direction, reduced future funding, or parliamentary criticism. But these are political consequences, not legal penalties.
How it interacts with other laws
The GFS operates within a framework of several Acts. The primary Act is the Australian Renewable Energy Agency Act 2011 (Cth), which establishes ARENA, sets its functions and objects, and requires the Minister to approve a GFS each year. The GFS must be consistent with the Act. For example, the Act’s object includes improving competitiveness of renewable energy technologies and increasing supply of renewable energy in Australia. The GFS’s strategic priorities - ultra low‑cost solar, renewable electricity, hydrogen, low emissions metals, decarbonised transport - clearly align with that object. The Act also defines key terms like “financial assistance”, “renewable energy technologies”, “Australia’s greenhouse gas emissions reduction targets”, and “Paris Agreement”. The GFS does not redefine them, incorporating them by reference via Schedule 1, section 4.
The Public Governance, Performance and Accountability Act 2013 (Cth) (PGPA Act) governs ARENA as a Commonwealth corporate entity. It requires ARENA to prepare a Corporate Plan each year, which must include its purposes, activities, and performance measures. The GFS is part of that planning framework. The PGPA Act also imposes duties on ARENA’s officials (the Board, CEO, and staff) to use public resources efficiently, effectively, and ethically. The GFS’s emphasis on “minimum financial assistance” and recoupment reflects an effort to comply with those duties. Recipients of ARENA funding, if they are Commonwealth entities or companies, may also be subject to the PGPA Act’s rules on grants.
The instrument also interacts with the Australian Renewable Energy Agency Regulations 2025, which provide that ARENA has an additional function of assisting the Clean Energy Finance Corporation in administering its Clean Energy Innovation Fund, and specify additional amounts payable to ARENA under section 64(2) of the ARENA Act. The GFS notes this in its introduction. This means ARENA’s funding mandate extends beyond its own grant programs to supporting CEFC‑administered innovation funds. The GFS does not detail how much of the $7.1 billion is destined for that purpose, creating budgetary opaqueness.
The Legislation Act 2003 (Cth) applies because the GFS is a legislative instrument. It must be registered on the Federal Register of Legislation, and it may be subject to disallowance by either House of Parliament within 15 sitting days of registration. The GFS was made on the day the Minister approved it; the commencement table confirms this. There is no disallowance statement in the instrument, but the standard rules apply. This gives Parliament a limited window to reject the instrument, though this is rare.
The instrument also references the Paris Agreement and Australia’s greenhouse gas emissions reduction targets (43% by 2030, net zero by 2050). These are policy targets, not statutory obligations, though the Climate Change Act 2022 (Cth) codifies them. The GFS does not purport to enforce those targets; rather, it positions ARENA as a tool to help achieve them. There is no direct legal interaction with the Climate Change Act, but the GFS’s priorities are clearly derivative of that Act’s targets.
Finally, the GFS mentions budget programs such as the “Future Made in Australia Innovation Fund” and the “Battery Breakthrough Initiative”. These are likely funded through separate appropriations and may have their own legislative bases (e.g., the Future Made in Australia Act, if enacted). The GFS does not create those programs; it merely states that ARENA will deliver them. Practitioners should check the relevant appropriation acts and program guidelines.
Amendment history
The instrument itself is a new approval; it has no amendment history. However, it repeals the previous approval, the Australian Renewable Energy Agency (General Funding Strategy) Approval 2024, in its entirety. That earlier instrument had been made under the same statutory power and would have covered the 2024‑25 to 2026‑27 period. The 2025 instrument effectively updates the strategy to reflect the new government priorities - particularly the Future Made in Australia package and the $7.1 billion funding increase - and to shift the forward outlook from the 2024‑27 window to 2025‑28.
There is no public amendment history of the 2024 instrument. The 2025 instrument does not explain why the changes were made or what is different from the previous GFS. A comparison with the 2024 instrument would be needed to identify specific changes, but that instrument is not provided. Based on the content, the 2025 GFS appears to formalise the government’s expanded commitment to renewable hydrogen, low‑emissions metals, and decarbonised transport, which may not have been as prominent in the 2024 version. The inclusion of the First Nations Community Microgrids stream is also likely new.
The instrument is not subject to future amendments. Once a new GFS is approved for 2026‑27, this instrument will be repealed or replaced. The cycle is annual, so this instrument will have a statutory life of roughly one year until the next GFS is made, though its priorities extend three years. The repeal clause in Schedule 2 is a standard clean‑up, ensuring only one GFS is in force at any time. There are no transitional provisions, so any ambiguity about projects started under the old GFS and continuing under the new one is left unresolved. Practitioners should seek specific legal advice if a project straddles two GFS periods.
Litigation history
The instrument is new and has no litigation history. More broadly, there have been no reported cases challenging an ARENA GFS approval or the agency’s compliance with a GFS. This is unsurprising, given the narrow scope for judicial review. The GFS is a legislative instrument of a general nature, not an administrative decision affecting specific rights. Challenges to individual grant decisions are possible but rare. ARENA’s funding decisions involve complex technical and economic judgments, which courts typically review on limited grounds such as jurisdictional error, unreasonableness, or failure to consider a relevant matter. But the GFS itself is unlikely to be litigated because it is policy, not a determinative rule.
The absence of litigation does not mean the instrument is immune from challenge. If ARENA were to fund a project that was clearly outside the GFS’s stated priorities, a competitor or a public interest group might seek declaratory relief or an injunction. However, standing would be an issue: competitors would need to show sufficient interest. The Australian Conservation Foundation v Commonwealth doctrine makes it hard for public interest groups to obtain standing unless they have a special interest. In practice, the Commonwealth rarely litigates internal policy compliance, preferring to resolve disputes administratively.
Recipients might sue for breach of contract if ARENA changes the GFS after entering into an agreement. GFS changes do not affect existing agreements because the duty under section 21 applies only at the time of entering into the agreement. A change in the GFS does not retroactively invalidate existing contracts. However, if a grant agreement includes a condition that the recipient must comply with future GFS changes, that could create risk. This is unusual, and the GFS does not suggest that.
In sum, the litigation history is nil, and the prospects for future litigation are low unless ARENA makes a decision that is clearly ultra vires or procedurally flawed.
Gotchas
Several features of the GFS can trip up unwary applicants or recipients. First, the strategic priorities are broad but not exhaustive. If a project falls outside the five listed priorities (ultra low‑cost solar, renewable electricity transition, renewable hydrogen, low emissions metals, decarbonising transport) and is not part of the listed targeted programs (Battery Breakthrough, Solar Sunshot, etc.), it will likely be ineligible even if it is a worthy renewable energy project. For example, geothermal energy, ocean energy, or biomass are not mentioned. The GFS does not state they are excluded, but ARENA’s discretion is guided by these priorities, and an applicant would have a hard time arguing fit.
Second, the recoupment mechanism. The GFS says ARENA “may negotiate a recoupment mechanism that sees some or all grant funding returned should the upside scenario eventuate”. This means that a successful project could be required to repay a portion of the grant if it becomes commercially viable. For businesses, this reduces the net benefit of the grant and distorts the incentive to maximise upside. The recoupment clause is likely to be non‑negotiable in practice, despite the word “may”. It also creates a compliance burden: the recipient must define “upside scenario” in the agreement, report on it, and potentially pay back substantial sums. This is not a grant in the traditional sense, but more like a deferred, contingent subsidy.
Third, the GFS imposes no statutory right to reasons. If an application is rejected, ARENA is not required to give a detailed explanation under the GFS itself. The Administrative Decisions (Judicial Review) Act may require reasons for a decision if it is a “decision of an administrative character”, but funding decisions are often characterised as commercial or contractual. Even if reasons are given, they can be brief.
Fourth, the GFS’s guiding principles are subjective. “Maximum impact”, “current relevance and additionality”, “commercial focus” - these are open to interpretation. An applicant cannot easily predict how ARENA will weigh these. A project with high long‑term impact but low current market pull might be rejected. Conversely, a project that is “responsive” to the government’s short‑term political priorities may be favoured. This creates uncertainty and encourages lobbying rather than technical merit.
Fifth, the GFS binds ARENA only when entering into an agreement. Once a grant agreement is signed, the GFS does not regulate the ongoing relationship. However, the GFS can change each year, and future GFSs might contain more restrictive interpretations of conditions. The instrument is replaced annually; there is no guarantee that the same strategic priorities will continue beyond 2027‑28. Recipients relying on expectations of follow‑on funding are at risk.
Sixth, the GFS references the First Nations Community Microgrids stream. While framed as inclusive, it may create a separate track for Indigenous projects that could be subject to different criteria or slower decision‑making. Applicants in this stream should verify whether the standard Investment Plan rules apply or whether there are additional eligibility requirements.
Seventh, the GFS does not address the maximum amount of financial assistance per project or per entity. There is no cap mentioned. This means that very large projects could absorb a disproportionate share of the $7.1 billion, leaving less for smaller innovators. The “diversity” principle is only a guideline, not a hard constraint.
Finally, the instrument is a legislative instrument and thus subject to disallowance. If Parliament disallows it, the old GFS (the 2024 one) reappears? The repeal of the 2024 instrument is part of the same instrument; if the 2025 instrument is disallowed, that repeal would also be ineffective, so the 2024 GFS would remain in force. This is a technical but important point for legal certainty.
How to comply
Compliance with the GFS is primarily a matter for ARENA, not for applicants or recipients. ARENA’s Board must ensure that any new financial assistance agreement entered into after the GFS comes into effect is consistent with the GFS’s strategic priorities and guiding principles. In practice, ARENA will operationalise this through its Investment Plan, which will set out specific funding rounds, eligibility criteria, and application processes aligned with the GFS.
For entities seeking ARENA funding, compliance means aligning project proposals with the stated priorities. The first step is to identify which of the five strategic priorities (or which targeted program) best fits the project. The project description should clearly demonstrate how it contributes to unlocking ultra low‑cost solar, optimising the transition to renewable electricity, commercialising renewable hydrogen, supporting low emissions metals, or decarbonising transport. For the targeted programs like the Battery Breakthrough Initiative or Hydrogen Headstart, the proposal must meet the specific program guidelines, which will be published separately.
The application should also address the guiding principles. Show that the project has long‑term impact potential (not just a short‑term fix), that there is a genuine market need where ARENA funding will make a difference (additionality), and that the technology is on a clear path to commercial readiness. The “commercial focus” principle means ARENA will look for the minimum grant amount necessary. Proposals should therefore justify the quantum of requested funding and explain why private finance alone cannot cover it. If the project might generate future upside (e.g. through licensing revenue or cost reductions), be prepared for a recoupment mechanism. The grant agreement will likely include a clause requiring a share of future profits or revenue up to a certain cap. Recipients should factor this into their financial projections.
Compliance with other laws is also necessary. The GFS does not exempt projects from environmental approvals, state planning laws, foreign investment rules, or tax obligations. For example, a hydrogen production project will need environmental impact assessments, and if it involves foreign investment, the Foreign Acquisitions and Takeovers Act 1975 (Cth) may apply. The grant agreement will require compliance with all applicable laws, and failure to do so can lead to termination.
For recipients, ongoing compliance after receiving funding involves meeting milestone reports, financial acquittals, and knowledge‑sharing obligations. The GFS says ARENA’s purpose includes sharing knowledge, so expect to provide data, reports, or perhaps public presentations. The grant agreement will specify the schedule and format. Non‑compliance with reporting obligations can lead to suspension or clawback.
Recipients should also monitor the GFS each year. While the current GFS covers 2025‑28, a new GFS will be approved annually. Changes in priorities could affect follow‑on funding or the interpretation of existing agreements. It is advisable to have legal counsel review each new GFS to ensure that any future applications remain strategically aligned.
Finally, any entity that is dissatisfied with ARENA’s funding decision should seek internal review or make a complaint to the Commonwealth Ombudsman. Litigation is possible but likely to be costly and slow. The GFS itself provides no appeal mechanism, so the general administrative law remedies apply.
Section 6Approval of General Funding Strategy
Note: This table relates only to the provisions of this instrument as originally made. It will not be amended to deal with any later amendments of this instrument
Note: Subsection 20(2) of the Act provides for an approved general funding strategy to be a legislative instrument on the day on which the strategy is approved. Subsection 21(1) of the Act has the effect that a general funding strategy approved after the commencement of a financial year commences from the time when the Minister approves the strategy
3 Authority
3 Authority
This instrument is made under subsection 20(2) of the Australian Renewable Energy Agency Act 2011.
4 Definitions
4 Definitions
In this instrument:
Act means the Australian Renewable Energy Agency Act 2011.
Note: A number of expressions used in this instrument are defined in the definitions section of the Act, including the following:
Australia’s greenhouse gas emissions reduction targets
Financial assistance
Paris Agreement
Renewable energy technologies
5 Schedules
5 Schedules
Each instrument that is specified in a Schedule to this instrument is amended or repealed as set out in the applicable items in the Schedule concerned, and any other item in a Schedule to this instrument has effect according to its terms.
6 Approval of General Funding Strategy
6 Approval of General Funding Strategy
For subsection 20(2) of the Act, the General Funding Strategy 2025/26 – 2027/28 at Schedule 1 is approved.
The Australian Renewable Energy Agency (ARENA) was established on 1 July 2012 by the Australian Renewable Energy Act 2011 (Cth) (ARENA Act). ARENA is a Commonwealth corporate entity under the Public Governance, Performance and Accountability Act 2013 (Cth) (PGPA Act).
The ARENA Act is supported by the Australian Renewable Energy Agency Regulations 2025 (Regulations), which provides that ARENA has the additional function of assisting the Clean Energy Finance Corporation in the administration of its Clean Energy Innovation Fund and specifies additional amounts payable to ARENA under section 64(2) of the ARENA Act.
In the May 2024 Federal Budget, under the Future Made in Australia package, the Australian Government provided ARENA funding of $7.1 billion over 16 years to target priority sectors including renewable hydrogen, green metals, low-carbon liquid fuels, processing and refining of critical minerals and clean energy manufacturing.
Through our role in improving the competitiveness and increasing the supply of renewable energy in Australia, ARENA is helping to achieve the Government’s climate change and energy objectives, anchored by emissions reduction goals of 43 per cent by 2030 and net zero by 2050. Under the ARENA Act our functions extend to supporting electrification and energy efficiency, in addition to renewable energy technologies.
In carrying out our work, ARENA supports the Government’s commitment to meaningful engagement and reconciliation with First Nations people.
General Funding Strategy
The General Funding Strategy (GFS) guides how ARENA provides financial assistance in accordance with the ARENA Act, associated regulations and the PGPA Act.
ARENA is required to develop a GFS each financial year that sets out our principal objectives and priorities for the provision of financial assistance over the current and upcoming two financial years. The GFS is provided to the Minister for approval and ceases to be in force when the GFS for the next financial year comes into force. ARENA may not enter into an agreement to provide financial assistance unless the assistance is in accordance with the GFS in force at the relevant time. It is the ARENA Board’s responsibility to ensure the GFS is published on ARENA’s website.
GFS relationship to the ARENA Corporate Plan and Investment Plan
The Corporate Plan is ARENA’s primary planning document and is required under the PGPA Act. It sets out ARENA’s overall strategy including ARENA’s vision and purpose, key activities and approach to delivery, including organisational capability and cooperation, performance reporting and risk management approach.
The General Funding Strategy states the principal objectives and priorities for ARENA’s key activity of providing financial assistance.
The Investment Plan details ARENA’s investment priorities and funding programs, as well as how to apply for ARENA funding.
2 ARENA’s Vision, Mission and Purpose
2 ARENA’s Vision, Mission and Purpose
ARENA is Australia’s renewable energy innovation agency.
ARENA’s strategic priorities are guided by our vision, mission and purpose, as informed by the object of the ARENA Act, which is to:
improve the competitiveness of renewable energy technologies
increase the supply of renewable energy in Australia
facilitate the achievement of Australia’s greenhouse gas emissions reduction targets
contribute to the reduction of global greenhouse gas emissions in accordance with the Paris Agreement.
ARENA’s vision is a prosperous Australia that is a renewable energy superpower in a net zero world.
Our mission is to support the global transition to net zero emissions by accelerating the pace of pre-commercial innovation, to the benefit of Australia.
This mission is tied to ARENA’s purpose: ARENA’s purpose is to support improvements in the competitiveness and supply of renewable energy and the uptake of energy efficiency and electrification by providing financial assistance and sharing knowledge, to accelerate innovation that benefits all Australians, and facilitates the achievement of Australia’s greenhouse gas emissions targets.
3 Guiding Principles and Priorities for Arena Financial Assistance
3 Guiding Principles and Priorities for Arena Financial Assistance
ARENA provides financial assistance to Australian researchers, innovators and businesses for projects that align with our strategic priorities or the objectives of the budget programs that ARENA is responsible for delivering.
Guiding principles
Our strategic priorities address the key challenges we aim to solve through the provision of financial assistance and knowledge sharing. We use the following guiding principles to identify and review our strategic priorities each year.
Maximum impact
ARENA strives to achieve maximum impact and value from the projects we fund. We consider the following when identifying our strategic priorities and focus areas within those:
Long-term impact: the potential to drive long-term impact versus short-term or interim solutions, unless such solutions are on the direct path to long-term impact.
High impact: each priority individually contributes to a significant part of ARENA’s mission.
Current relevance and additionality: market pull or need for ARENA support, minimal overlap with other grant-funding efforts in the ecosystem, and potential for acceleration in Australia.
Responsive
ARENA is responsive to market conditions, technology developments and industry needs. We regularly review our strategic priorities to ensure we are providing financial assistance to have the highest impact. We aim to be agile, responding swiftly to take advantage of opportunities that could have a transformative impact.
Diversity
Given the uncertainty and risk inherent in researching, developing and commercialising new solutions, ARENA seeks diversity in its portfolio when providing financial assistance to ensure options are kept open for the future and its portfolio has an impact in different policy and economic scenarios.
Accordingly, we strive to ensure our overall portfolio includes activities at different stages of development on the commercialisation pathway including:
research into, and development of, early-stage technologies that are world-leading or address specific Australian requirements
demonstration of the feasibility of new technologies, or supporting business models, that are novel in application
pre-commercial deployment of technologies where this is expected to improve the competitiveness of future projects.
Commercial focus
ARENA’s financial assistance is commercially focussed and provided to advance technologies or business models towards commercial readiness. We seek to provide the minimum financial assistance needed to achieve an outcome, and in the most appropriate form, maximising efficiency and value for public investment.
ARENA provides financial assistance in the form of grants. Where there is the possibility of upside from a project in the future, ARENA may negotiate a recoupment mechanism that sees some or all grant funding returned should the upside scenario eventuate. In so doing, ARENA ensures that funding continues to represent value for the Australian taxpayer.
ARENA’s strategic priorities
For the period of this GFS (2025–26 to 2027–28), ARENA’s strategic priorities are to:
Unlock ultra low-cost solar (ULCS).
Optimise the transition to renewable electricity.
Commercialise renewable hydrogen.
Support the transition to low emissions metals.
Decarbonise transport.
These priorities reflect our mission – to support the global transition to net zero emissions – by lowering the cost and increasing the availability of renewable energy, growing the share of renewables in the electricity mix, supporting fuel switching, energy efficiency and electrification, becoming more flexible in when we use electricity, and supporting the development of technology solutions for hard-to-abate sectors where a pathway to lower emissions is expensive or currently not feasible.
In addition to committing baseline funding to high-merit projects, ARENA will use its expertise in grant funding to deliver targeted programs including:
the Future Made in Australia Innovation Fund
the Battery Breakthrough Initiative
the Solar Sunshot program
the Industrial Transformation Stream as part of the Powering the Regions Fund
Hydrogen Headstart
First Nations Community Microgrids stream as part of the Regional Microgrids Program.
Schedule 2—Repeals
Australian Renewable Energy Agency (General Funding Strategy) Approval 2024
1 The whole of the instrument
Repeal the instrument
Note: Subsection 21(2) of the Act has the effect that the general funding strategy in Schedule 1 to the Australian Renewable Energy Agency (General Funding Strategy) Approval 2024 ceases to be in force when the strategy in Schedule 1 comes into effect.