Australian Naval Nuclear Power Safety Regulations 2025
85Additional conditions—general requirements for plans required under this Division
Start here
Get a plain-English read of 85
Turn the raw legal text into a practical explanation grounded in Australian Naval Nuclear Power Safety Regulations 2025.
85 Additional conditions—general requirements for plans required under this Division
(1) This section applies in relation to each plan for the regulated activity required under this Division.
(2) It is a condition that the plan must be as proposed at the time of making the decision to issue the licence, as changed from to time to time by the licence holder:
(3) If the licence is a transitional licence, subsection (2) applies as if the reference to the plan as proposed at the time of making the decision to issue the licence were a reference to the plan as described and documented in the information and documents provided to the Regulator on the day the Act commences.
Note: For the requirements to provide such information and documents to the Regulator, see subsections 79(5), 80(8), 81(6), 82(7), 83(5) and 84(7).
Division 4—Additional conditions applying to licence authorising material activity