82 Additional conditions—activity of operating an NNP facility in a designated zone
(1) This section applies if the regulated activity authorised by the licence is the facility activity of operating an NNP facility in a designated zone.
Commissioning plan
(2) It is a condition that the regulated activity is, so far as reasonably practicable, conducted in accordance with the commissioning plan for the facility.
(3) It is a condition that the commissioning plan must ensure nuclear safety during the commissioning of the facility.
Operational plan
(4) It is a condition that the regulated activity is, so far as reasonably practicable, conducted in accordance with the operational plan for the facility.
(5) It is a condition that the operational plan must ensure nuclear safety during the operation of the facility.
Plans must be implemented and maintained
(6) It is a condition that the licence holder must ensure that the commissioning plan and the operational plan are effectively implemented and maintained throughout the period of the licence.
Note: The plans must be audited and reviewed every 3 years: see section 68.
(7) If the licence is a transitional licence:
(a) it is a condition that the licence holder must, on the day the Act commences, provide information and documents that describe and document the commissioning plan for the facility and the operational plan for the facility to the Regulator; and
(b) it is a condition that the licence holder must, on the day that is 6 months after the commencement of the Act, provide the following to the Regulator:
(i) a preliminary decommissioning plan for the NNP facility;
(ii) a preliminary disposal plan for the NNP facility.