Australian Naval Nuclear Power Safety Regulations 2025
65Reporting—holdings of radioactive waste awaiting disposal
Start here
Get a plain-English read of 65
Turn the raw legal text into a practical explanation grounded in Australian Naval Nuclear Power Safety Regulations 2025.
65 Reporting—holdings of radioactive waste awaiting disposal
Reporting holdings of radioactive waste
(1) It is a condition that the licence holder report to the Regulator, at the end of each period of 12 months during which the licence is in force (with the first of those periods beginning on the day the licence is issued):
(a) the amount of radioactive waste from the regulated activity that is in a designated zone at that time, awaiting disposal; and
(b) a description of the kind of the waste and its hazard level and classification.
Note: The calculation of a period mentioned in this subsection is not to include any periods during which the licence is suspended: see subsection 52(3).
(2) However, if the remaining period of the licence, following any periods mentioned in subsection (1), is 12 months or less, subsection (1) does not apply to the period.
(3) If the licence is a transitional licence, this section applies as if: