57Nuclear safety site induction
Start here
Get a plain-English read of 57
Turn the raw legal text into a practical explanation grounded in Australian Naval Nuclear Power Safety Regulations 2025.
57 Nuclear safety site induction
Site inductions
(1) It is a condition that the licence holder must ensure that all persons entering the site of the regulated activity receive a site induction:
(a) before first entering the site; and
(b) if the person has not received a site induction in the previous 12 months—before entering an NNP facility, or interacting with NNP material or NNP equipment or plant, at the site; and
(c) before interacting with a kind of NNP material or NNP equipment or plant, at the site, if the person has not received a site induction that covered that kind of NNP material or NNP equipment or plant in the previous 12 months.
(2) The site induction must cover:
(a) nuclear safety and radiation hazards and risks at the site in relation to the regulated activity and the kinds of NNP material or NNP equipment or plant at the site; and
(b) for persons at higher risk—the severity of such hazards and risks; and
(c) how to respond to a nuclear safety incident and any other emergency or incident that could occur in relation to the regulated activity at the site; and
(d) reporting requirements for nuclear safety incidents and other emergencies or incidents.
Review of induction material and reporting
(3) It is a condition that the licence holder must review the appropriateness and effectiveness of the induction material:
(a) after the end of each period of 12 months during which the licence is in force (with the first of those periods beginning on the day the licence is issued); and
(b) each time significant changes are required to ensure nuclear safety.
Note: The calculation of a period mentioned in paragraph (a) is not to include any periods during which the licence is suspended: see subsection 52(3).
(4) It is a condition that the licence holder must cause the review to be completed within 3 months after:
(a) if paragraph (3)(a) applies—the end of the relevant 12 month period; or
(b) if paragraph (3)(b) applies—the significant change is made.
(5) It is a condition that the licence holder must, within 14 days of the completion of the review, provide the Regulator with a report on the outcomes of the review that includes details of:
(a) the assessment of the appropriateness and effectiveness of the material; and
(b) how any identified deficiencies were, or are proposed to be, rectified.
Note: The licence holder must receive approval from the Regulator before implementing a change identified in the review if the change is significant or may have significant implications for nuclear safety: see section 55.