Airports (Building Control) Regulations 2025
40Inspections—airport building controller to be timely
Start here
Get a plain-English read of 40
Turn the raw legal text into a practical explanation grounded in Airports (Building Control) Regulations 2025.
40 Inspections—airport building controller to be timely
(1) This section applies if work in relation to a building activity being carried out on an airport site is stopped, until the airport building controller for the airport site has made an inspection, under: (a) the Act; or (b) this instrument; or (c) a condition imposed on the building approval that authorises the carrying out of the building activity on the airport site. (2) The airport building controller must make the inspection as soon as is reasonably practicable.