AD/VAT/35 - Fuel Cell - Inspection
1AD/VAT/35 - Fuel Cell - Inspection
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/VAT/35 - Fuel Cell - Inspection.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Victa and A.E.S.L. Airtourer Series Aeroplanes
AD/VAT/35 Fuel Cell - Inspection 7/70
Applicability: All models fitted with P/No. DC3681 fuel cells.
Requirement: Inspect the fuel cell to ensure that the rubber support channels are adequately bonded to the upper surface of the cell.
Compliance: 1. For installed fuel cells - within 100 hours time in service after 31 July 1970.
- For spar fuel cells - before installation in an aeroplane.