CTHIn ForceLegislation
AD/V2500/3 - No. 3 Bearing
International Aero Engines AG V2500 seriInternational Aero Engines AG V2500 series
Start here
Get a plain-English read of International Aero Engines AG V2500 seri
Turn the raw legal text into a practical explanation grounded in AD/V2500/3 - No. 3 Bearing.
International Aero Engines AG V2500 series
| AD/V2500/3 | No. 3 Bearing | 4/2007 |
|---|
| Applicability: | International Aero Engines AG (IAE) V2522-A5, V2524-A5, V2527-A5,V2527E-A5, V2527M-A5, V2530-A5, and V2533-A5 turbofan engines with engine serial numbers V10601 through V11335 inclusive and bearings part number (P/N) 2A1165 installed.Note 1: These engines are installed on, but not limited to, Airbus Industrie A319, A320, and A321 series aeroplanes. |
|---|---|
| Requirement: | 1. For engines listed in Table 1 of Appendix 1 of IAE Service Bulletin (SB) No. V2500-ENG-72-0452, Revision 4, dated 30 September 2005, and that have aNo. 3 bearing, P/N 2A1165, installed at new production build, inspect the master MCD or the No. 1, 2, 3 bearing chamber MCD.Note 2: It is recommended that the inspection of the master MCD or the No. 1, 2, 3 bearing chamber MCD, as detailed in Requirement 1 of this AD, on all engines installed on the same aeroplane, not be done by the same individual before the same flight. This is to minimize the chances of maintenance error on multiple engine aeroplanes.2. If bearing material is found on the master MCD or No. 1, 2, 3 bearing chamber MCD, remove the engine from service.3. Remove the No. 3 bearing from service.4. Do not install any No. 3 bearing, P/N 2A1165, removed in accordance with Requirement 3 of this AD, into any engine.5. Remove the HPC stubshaft that has a low-energy plasma coating.Terminating ActionPerforming the requirements specified in Requirements 3 and 5 of this AD is terminating action to the repetitive MCD inspections specified in Requirement 1 of this AD.Note 3: FAA AD 2006-25-01Amdt 39-14841 dated 27 November 2006 refers. |
| Compliance: | 1. Within 125 hours time-in-service (TIS) after the effective date of this AD, thereafter, at intervals not to exceed 125 hours time-since-last inspection of the master MCD or the No. 1, 2, 3 bearing chamber MCD.2. Before further flight after the effective date of this AD.3. At the next shop visit, for engines listed in Table 1 of Appendix 1 of IAE SB No. V2500-ENG-72-0452, Revision 4, that have a serial number (SN) from V10601 through V11335 inclusive, and that have a No. 3 bearing, P/N 2A1165 installed at new production.4. From the effective date of this AD.5. At the next shop visit, for engines listed in Table 1 of Appendix 1 of IAE SB No. V2500-ENG-72-0452, Revision 4, that have a SN from V10601 through V11335 inclusive. |
|---|