AlliedSignal (Garrett/AiResearch) Turbine Engines - TPE 331 Series
AlliedSignal (Garrett/AiResearch) Turbine Engines - TPE 331 Series
| AD/TPE 331/38 | Second Stage Turbine Wheel Assembly | 10/2009 |
|---|
| Requirement: | CANCELLED. |
|---|---|
| This AD is cancelled on 24 September 2009. | |
| Background: | This unique Australian AD specified inspection and replacement of second stage turbine wheel assemblies in accordance with Garrett SB No. A72-0577 within 50 hours time in service after June 1988. The AD is no longer required. |
View image in the official source
James Coyne
Delegate of the Civil Aviation Safety Authority
14 August 2009