AD/SM-205/39 - Powerplant Control Cables
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source
SIAI Marchetti S205 and S208 Series Aeroplanes
AD/SM-205/39 Powerplant Control Cables 5/98
Applicability: All models S. 205 and S. 208 aircraft.
Requirement: 1. Remove all powerplant control cables from the aircraft and inspect in accordance with AERMACCHI Service Bulletin 205-SB-061.
- Inspect, without removal from the aircraft, all powerplant control cables in accordance with AERMACCHI Service Bulletin 205-SB-061.
Note: RAI AD 98-021 refers.
Compliance: 1. Within 50 hours time in service after 23 April 1998, or before 31 December 1998, whichever occurs first, and at each engine overhaul thereafter.
- Within 100 hours time in service after accomplishment of the Requirement 1 inspection, and thereafter at intervals not to exceed 100 hours time in service.
This Airworthiness Directive becomes effective on 23 April 1998.
Background: The RAI requires inspections to check the structural integrity of the external sheaths protecting the engine control cables.