What it does
This Airworthiness Directive (AD) mandates inspections, rework, replacement and additional lock wiring on the main rotor blade de icing system distributor retaining clamps fitted to Eurocopter AS332 C, C1, L and L1 helicopters. It applies specifically to clamps with part number 225000-18454 or D18454 that use an attachment screw. The AD was issued in response to two field failures of the screw that secures the clamp. Investigations found that assembly stress in the screw head caused the failures and that some screws lacked a lock wiring hole, which prevented the use of lock wiring as a secondary retention device. A later failure after compliance with earlier amendments revealed a non conformity in screw hardness. Amendment 2, which is the version reproduced here, adds a supplementary lock wire to retain the clamp pending permanent corrective action, and introduces repetitive inspections of the screw and clamp at intervals not exceeding 10 flight hours. Operators must inspect the attachment screw for integrity by following paragraph 2.B.7 of Eurocopter Alert Service Bulletin (ASB) No. 30.00.66 revision 2. If there is a risk of interference between the screw head and the clamp the clamp must be reworked. A cracked screw shank requires replacement. A screw head without a lock wiring hole must be drilled and lock wired. For clamps that have no batch number marked after the part number, compliance within eight months requires either replacing the attachment screw (if non welded) or the complete clamp (if welded), or verifying the hardness of the screw. On helicopters where the screw is welded to the clamp barrel, compliance timelines are shorter: inspection within 20 flight hours or one month from the original effective date, whereas non welded screws allowed 50 flight hours or three months. From the effective date of this amendment (6 February 2009), operators must not install a clamp or attachment screw unless it has been brought into full conformity with the AD. The AD effectively creates a layered compliance regime: immediate action for known dangerous conditions, repetitive surveillance for latent defects, and a hard deadline for permanent rectification. This imposes recurring costs on operators in the form of labour, parts and aircraft downtime, and it exposes maintenance organisations to liability if they fail to capture the correct ASB revision or misinterpret the compliance intervals. The AD has a clear safety rationale but its economic impact on affected operators, particularly those in offshore oil and gas or search and rescue operations that rely heavily on the Super Puma fleet, is material and should be weighed against the risk of rotor blade damage that could result from undetected screw failure.