Below is a practical, source‑grounded compliance checklist that follows the AD’s mandatory steps and references the specific phrases and paragraphs used in the AD. Each step should be documented with time, personnel, ASB revision used and serial‑number references.
-
Identify affected aircraft and parts:
- Check each S‑76 on your register for main rotor shaft assemblies matching the listed part numbers and serial numbers (Applicability). For part 76351‑09030 (all dash numbers), check serial numbers B015‑00782 through B015‑00791, B015‑00811 through B015‑00816, E015‑00844 through E015‑00865, and E015‑00908 through E015‑00918. For part 76351‑09630‑041, check serial numbers C213‑00436 through C213‑00454, D213‑00537 through D213‑00545, and D213‑00575 through D213‑00585 (Applicability).
-
Schedule inspections within the compliance window:
- The AD requires the inspections to be completed within 75 hours time in service after 15 June 2007 unless already accomplished (Compliance). Plan maintenance slots so that removal and ultrasonic inspection occur inside that TIS window.
-
Arrange competent maintenance and ultrasonic capability:
- The AD requires removal of the main rotor shaft assembly and ultrasonic inspection "in accordance with the Accomplishment Instructions, paragraphs 3.B.(1)(a) through 3.B.(1)(d)5" of the applicable ASB (Requirement). Ensure your maintenance organisation or contractor has the capability to perform those ASB procedures and the ground run leak test procedures (paragraphs 3.B.(1)(f) through 3.B.(1)(l)).
-
Use the correct ASB and revision:
- For part 76351‑09630‑041 on Models S‑76A, B and C, use ASB No. 76‑66‑45A Revision A dated 7 February 2007, or a later FAA‑approved revision (Requirement). For part 76351‑09030 on Model S‑76A, use ASB No. 76‑66‑46 dated 7 February 2007, or a later FAA‑approved revision (Requirement). Document the ASB number and revision used for each inspection.
-
Conduct the ultrasonic inspection per ASB paragraphs:
- Follow paragraphs 3.B.(1)(a) through 3.B.(1)(d)5 of the applicable ASB for the ultrasonic inspection (Requirement). Record inspection findings, method, equipment used and operator/signatory details.
-
If cracking is detected:
- Do not conduct further flight. Replace the main rotor shaft assembly with a serviceable shaft assembly that has itself been ultrasonically inspected in accordance with Requirement 1 or 2 as applicable (Requirement). Document the replacement part’s part number, serial number and inspection certificate demonstrating it meets the AD’s ultrasonic inspection requirement.
-
Reassembly and ground run leak test:
- After inspection or replacement, reassemble the lower bearing housing assembly, install the main gearbox and perform the ground run leak test in accordance with paragraphs 3.B.(1)(f) through 3.B.(1)(l) of the applicable ASB (Requirement). Record the ground run leak test results and the personnel who performed them.
-
Pre‑installation inspection of replacement shafts:
- Before installing any affected main rotor shaft assembly (including a replacement), perform the ultrasonic inspection in accordance with Requirement 1 or 2 (Requirement). Keep inspection certificates with the part documentation.
-
Record keeping:
- Maintain a complete audit trail: serial numbers, ASB revision used, inspection reports, certificates for replacement parts, reassembly records, ground run leak test records, and timeline showing compliance within the 75 hours TIS window (Compliance). Ensure logbooks reflect the work and that maintenance release documentation references the AD and the ASB procedure used.
-
If work was performed before the AD effective date:
- If the ultrasonic inspection was already accomplished in the manner required, the AD’s compliance clause recognises that completed work satisfies the requirement ("unless already accomplished") (Compliance). Ensure documentation proves equivalence to the required ASB paragraphs.
-
Liaise with regulator and suppliers:
- The AD references FAA‑approved ASB revisions and an FAA AD (Note). If relying on a later ASB revision, confirm that it is FAA‑approved. For replacement part procurement, request written evidence that replacement shafts have been ultrasonically inspected per the AD’s requirements.
-
Plan for operational impacts:
- The removal, inspection, possible replacement and reassembly will require down time and may require access to specialised facilities for ultrasonic testing and ground run leak testing. Schedule accordingly to minimise disruption and to ensure compliance within the 75 hours TIS window.
Following these steps will align actions with the express requirements of the AD as worded. Keep the AD text, the ASBs (cited paragraphs) and evidence of FAA approval for any later ASB revisions on file with the maintenance records used to certify the aircraft as airworthy after completing the mandated actions.
Documentation examples to retain: copy of the relevant ASB and paragraph references used, ultrasonic inspection report with signatures and equipment calibration evidence, part serial‑number records, replacement part inspection certificates, reassembly checklist referencing ASB paragraphs 3.B.(1)(f)-(l), ground run leak test log, and an entry in the aircraft logbook stating the AD reference (AD/S‑76/75), the work performed, dates, TIS at the time of work and the maintenance release.
David Villiers
Delegate of the Civil Aviation Safety Authority
6 June 2007
(Reference: AD/S‑76/75 text - Applicability; Requirement; Compliance; Background; Note.)