This section gives a practical compliance checklist mapped to the AD’s requirements and quoted language. Operators and maintenance organisations should use the official AD and the referenced PW ASB material when executing compliance steps.
Step 1, identify affected engines
- Confirm engine type and configuration: PW4164, PW4168, or PW4168A.
- Confirm HPC inner rear case assembly part number: P/N 53H272-01.
- Confirm engine serial number is within P733301 through P733500.
- If yes to all above, the AD is applicable (see Applicability).
Step 2, confirm ASB and inspection method
- Obtain Pratt & Whitney Alert Service Bulletin PW4G-100-A72-170, Revision 3, dated 31 January 2003.
- Review and be prepared to perform borescope inspection "in accordance with paragraphs 1.A. through 1.I of the Accomplishment Instructions" of that ASB (Requirement 1).
- If relying on a later ASB revision, confirm that the later revision has been "approved by the United States Federal Aviation Administration (FAA) as an Alternate Method of Compliance (AMOC) to FAA AD 2003-09-02," because the AD accepts later revisions only on that basis.
Step 3, schedule initial inspection per Table 1
- Determine CSN and CSR values for the HPC inner rear case assembly on the AD effective date.
- If the assembly had "Fewer than 900 cycles-since-new (CSN) or cycles-since-refurbishment (CSR) on the effective date," schedule the initial borescope inspection "Before accumulating 1,500 CSN or CSR, whichever occurs later" (Table 1).
- If the assembly had "900 or more CSN or CSR," schedule initial borescope inspection "Within 600 cycles-in-service (CIS) after the effective date of this AD" (Table 1).
Step 4, perform borescope inspection to the ASB procedure
- Carry out borescope inspection per the PW ASB paragraphs 1.A-1.I.
- Ensure inspection personnel and facilities can detect and measure circumferential wear lengths to the thresholds specified in Table 2 (1.0 inch for 14th stage, 2.0 inches for 15th stage) and can document findings.
Step 5, apply Table 2 actions according to inspection findings
- If 14th stage rubstrip wear through to parent material with circumferential length >= 1.0", "Remove engine from service within 250 CIS" (Table 2(1)).
- If 15th stage rubstrip wear through to parent material with circumferential length >= 2.0", "Remove engine from service within 250 CIS" (Table 2(2)).
- If lesser wear through to parent material on those stages is found, reinspect every 300 CIS (Table 2(3) and (4)).
- If neither rubstrip shows wear through to parent material, reinspection interval is every 600 CIS (Table 2(5)).
Step 6, apply Table 3 actions where two affected engines are installed
- If both engines on an aircraft are affected, perform second engine inspection "Within 10 CIS since borescope inspection of first engine" (Table 3).
- If both engines show wear as specified in Table 2 Steps (1) through (4), remove either engine "within 25 CIS since borescope inspection of the second engine and replace with a serviceable engine." Then remove or re-inspect the remaining engine following Table 2 and, if still applicable, follow Requirement 3 (Table 3).
- If one engine shows Table 2 Steps (1)-(4) wear and the other engine shows Table 2 Step (5) wear, the AD requires both engines be removed or reinspected in accordance with Table 2 and then perform subsequent actions as specified in Requirement 3 (Table 3).
- If both engines show no wear (Step (5) on Table 2), inspect the second engine as specified in Table 1 (Table 3(3)), and then proceed according to Table 2 results.
Step 7, determine what constitutes a "serviceable engine"
- A serviceable engine, per the AD, is one of:
a. "An engine that incorporates an HPC with zero CSN"; or
b. "An engine covered by the Terminating Action detailed in this AD"; or
c. "An engine inspected as specified in Requirements 1 through 3 of this AD, and is following the 600 CIS re-inspection interval as specified in Table 2 of this AD."
- Confirm any candidate replacement engine meets one of these categories before using it to comply with Table 3 replacement requirements.
Step 8, consider terminating action where appropriate
- The AD identifies replacement of the HPC inner rear case assembly with one "containing a Haynes 242 rear hook" or assemblies modified or replaced by PW SB No. PW4G-100-72-159, PW SB No. PW4G-100-72-187, or Chromalloy Repair Procedure 00-CFL-039-0 as "Terminating Action" for the repetitive borescope inspections.
- If an operator elects terminating action, plan for procurement of the Haynes 242 assemblies or scheduling of the listed SBs or Chromalloy repair, and coordinate any necessary regulatory acceptance or certification steps to document that the terminating action has been completed in accordance with the AD.
Step 9, document compliance and maintain cycle records
- Maintain records showing CSN, CSR and CIS calculations used to schedule inspections and to trigger removal or reinspection deadlines.
- Document borescope findings, measurements of circumferential wear, removal dates, and records of engine replacements or terminating action implementation.
Step 10, manage logistics and supply-side constraints
- Anticipate potential bottlenecks: availability of Haynes 242 assemblies, space and schedule at repair shops implementing PW SBs or Chromalloy repair procedure, and availability of "serviceable engines" per the AD definition.
- If a serviceable engine is not immediately available under the AD’s definition, plan for timely removal and re-inspection schedules to avoid exceeding 250 CIS or other AD time limits.
Notes and practical clarifications
- Engines previously inspected under earlier ASB revisions (Rev 1 or Rev 2) "must follow Requirements 1 through 3 of this AD, after the effective date of this AD." That means operators cannot rely on prior inspections as a permanent substitution for the AD’s obligations; they must enter the AD’s ongoing inspection cycle as required.
- For operators wishing to use an updated ASB revision, the AD requires FAA AMOC approval of that revision before it can be relied upon for compliance with this CASA AD.
- The AD becomes effective 14 August 2010; calculate CIS intervals and deadlines relative to that effective date as required in Table 1 and Table 2.
If there is any regulatory ambiguity about the acceptability of a specific repair procedure, AMOC status, or documentation format, operators should consult CASA directly and keep contemporaneous records of communications and approvals. The AD text supplies the operative technical thresholds and the acceptable terminating action methods; compliance requires operators to map their maintenance operations to those specific clauses and to ensure they have suitable replacement engines if required by Table 3.