Step 1 , Establish applicability and documentation: For each aircraft/engine combination, determine whether the engine is one of the PT6A models listed in the Applicability section. Then confirm whether the currently installed turbine exhaust duct is in compliance with P&WC Service Bulletins SB 1610, 1610R1, 1610R2 or 12173R1. If documentary evidence shows SB compliance, no further action under this AD is required for that duct. If the duct is not in compliance, proceed to Step 2 (Applicability).
Step 2 , Schedule initial inspection: The AD requires the initial action "at the next shop visit or within 150 flight hours from the effective date of this Directive, whichever occurs first" (Compliance). Arrange for the initial inspection to occur within that interval. Where practical, plan for the next shop visit to perform the inspection so the "next shop visit" condition is satisfied and avoids the 150 flight hour deadline.
Step 3 , Conduct weld-quality inspection per SB paragraphs: Perform the inspection for low-quality welds near flange "A" in accordance with Paragraphs 3B through 3E of the appropriate P&WC Service Bulletin specified for the engine model: use P&WC SB PT6A-72-1610 Revision 2 for the listed models in the first SB group, or P&WC SB PT6A-72-12173 Revision 1 for the other models (Requirement 1). Ensure the exact SB revision and paragraph numbers specified in the AD are available to the maintenance team and followed step-by-step.
Step 4 , If welds acceptable: If the weld quality meets the SB acceptability criteria (Requirement 2a), the AD permits returning the duct to service. However, Requirement 2b additionally requires carrying out an internal inspection of the exhaust duct for cracking in accordance with the applicable P&WC Engine Overhaul Manual. Document the internal inspection and maintain records. Note the Compliance timing that tasks linked to Requirement 2 may be due "at the completion of Requirement 1" or "at the next overhaul" as specified.
Step 5 , If welds unacceptable: If the welds do not meet acceptability criteria (Requirement 3), either replace the duct with a serviceable part or carry out the external circumference inspection using 5x magnification described in Requirement 4. Replacement must be completed prior to further flight where the AD so directs (Compliance and Requirement 3).
Step 6 , External circumference inspection and treatment: If proceeding with the external inspection, use 5x magnification to inspect the circumference of the forward area from the propeller reduction gearbox mounting flange to 2 inches aft of that flange (Requirement 4). Measure crack lengths and separations precisely against the AD’s thresholds:
-
Replace prior to further flight if any one crack exceeds 1 inch; or if three or fewer cracks have a cumulative length exceeding 2 inches; or if any two cracks are separated by less than six times the longest crack (6L) or 3 inches or less, whichever is the closest separation; or if more than three cracks are found (Requirement 4b).
-
If no cracks are found, return the duct to service and repeat the inspection at intervals "not to exceed 150 flight hours" (Requirement 4a and Compliance 4a).
-
If cracks are within allowable limits, mark all allowable cracks with suitable metal marking material, record the length, location, duct operating hours and time since overhaul, repeat the inspection and monitor growth. Replace the duct if growth exceeds 0.015 inches per hour time in service since the last inspection (Requirement 4c and monitoring clause).
Step 7 , Marking and recording: Use marking materials specified by the P&WC Engine Manual (Note 2). For each allowable crack, mark and record the: crack length; precise location; current number of duct operating hours; and time since overhaul. Keep those records with the maintenance log so growth calculations can be made between inspections and to demonstrate compliance to an auditor or regulator.
Step 8 , Set inspection intervals and monitoring programme: Implement inspection frequencies consistent with the AD. If no cracks: repeat detailed inspection at intervals not to exceed 150 flight hours (Compliance 4a). If allowable cracks present: set inspection intervals not to exceed 25 flight hours (Compliance 4c). Maintain an inspection history sufficient to compute crack growth per hour and to determine when the 0.015 inches per hour threshold has been reached.
Step 9 , Source and verify replacement parts: If replacement is required, ensure the replacement duct is "serviceable" for purposes of this AD, meaning it meets the acceptability limits of the Directive (Note 3). Where replacement ducts are aftermarket or overhauled parts, verify their documentation and acceptance tests against the Directive’s limits before installation.
Step 10 , Liaise with CASA and maintain regulatory awareness: Keep records of inspections, findings, markings and corrective actions on file and be prepared to present them to CASA if required. Because the AD is issued under subregulation 39.1(1) of CAR 1998 and was notified in the Commonwealth Gazette, standard regulatory oversight may include verification of compliance at audits or inspections.
Practical operational tips drawn from the AD text:
-
Ensure the exact P&WC SB revisions named in the AD are on-hand during the inspection, including Paragraphs 3B-3E where required (Requirement 1).
-
Use precise measurement tools and logbook entries to support the crack growth calculations required by the 0.015 inches per hour rule (Requirement 4c).
-
Plan procurement and scheduling for replacement ducts where replacement "prior to further flight" could lead to unscheduled grounding (Requirement 3 and 4b).
-
For ducts already in compliance with the specified P&WC SBs, retain documentary proof to demonstrate exclusion from the AD’s applicability (Applicability).
Following the steps above will align maintenance actions with the Directive’s explicit procedural and timing requirements as stated in the AD text.