Compliance requires a systematic approach. Below is a step-by-step guide grounded in the AD’s language, tailored for counsel advising operators.
Step 1: Confirm applicability. Check the aircraft manufacturer serial number and model against the table. Note: serial numbers 101-544, 546-888 for PC-12, PC-12/45, PC-12/47; and serial numbers 545, 1001-1150 for PC-12/47E. If the aircraft is not in range, no action required under this AD.
Step 2: Obtain the correct Temporary Revision. For non-47E models, obtain document 12-A-04-00-00-00A-00T-A dated 28 January 2009 (or later EASA approved revision). For 47E models, obtain document 12-B-04-00-00-00A-000A-A Rev 1 dated 27 January 2009 (or later revision). The revision is available from Pilatus (likely a paid document) or from a Pilatus authorized service center.
Step 3: Amend the approved maintenance program. Within 30 days after 25 May 2009 (i.e., by 24 June 2009), incorporate the structural, component and miscellaneous limitations from the Temporary Revision into the maintenance program. This must be done in a manner consistent with the Continuing Airworthiness Management Exposition (CAME). The amendment becomes a permanent part of the program. Record the amendment reference, date, and revision used.
Step 4: Determine the compliance schedule. From the Temporary Revision, identify the initial inspection threshold (e.g., before a certain number of landings or hours or date) and the repetitive interval (e.g., every 400 landings). The AD does not specify these; they are in the revision. The operator must apply the schedule to their aircraft’s usage. Note that the 4,000 landing life-limit for part 140 also applies, so the operator may need to remove the part before the first inspection if it is close to 4,000 landings.
Step 5: Perform initial inspection. Inspect the right-hand upper drag link part number 532.20.12.140 or 532.20.12.289 as required by the compliance schedule. The AD does not describe the inspection method; it is in the Temporary Revision. Common methods could be eddy current or dye penetrant. The inspection must be done by an appropriately qualified person (e.g., a licensed aircraft maintenance engineer with appropriate NDT endorsement). Record the inspection results, including part number, serial number, landings, date, findings, and the person who performed it.
Step 6: Track and perform repetitive inspections. Continue inspections at the intervals specified. Maintain a log of landings or flight hours to track when the next inspection is due. If the part reaches 4,000 landings (for part 140), it must be removed regardless of inspection results.
Step 7: Consider terminating action. To end the repetitive inspection burden, replace the existing drag link with the newly designed part number 532.20.12.296. This is not mandatory but recommended if the cost of recurrent inspections exceeds the cost of replacement. The replacement must be done in accordance with the manufacturer’s instructions. After replacement, no further inspections are required for that component under this AD. Record the replacement part number, serial number, date, and landings. Update the maintenance program to reflect that the AD requirement is satisfied (though the program amendment remains in place for other limitations).
Step 8: Monitor for revisions. Check periodically (e.g., every annual review) whether EASA has approved later revisions of the Temporary Revision. If so, the operator must adopt those revisions and adjust the maintenance program and inspection intervals accordingly. This is an ongoing obligation.
Step 9: Keep records. Retain all evidence: a copy of the Temporary Revision, the amended maintenance program, inspection reports, life-limit tracking records, and any replacement logbook entries. Records should be kept for the life of the aircraft.
Step 10: Verify compliance during audits. When CASA or a regulatory auditor reviews the aircraft, they will look for the signed maintenance program amendment and inspection records. Ensure they are readily available.
Practical considerations: Engage a Part 145 maintenance organization with Pilatus experience. The cost of the Temporary Revision may be included in service agreements. Plan for downtime during inspections (typically a few hours) or longer for replacement. If the terminal part is on backorder, consider ordering it early to avoid grounding. The AD does not allow extensions beyond the compliance schedule; if you cannot inspect on time, the aircraft must be grounded until inspection is performed.