CTHRepealedLegislation
AD/PA-46/1 - Aft Rudder Cable - Inspection - CANCELLED
Piper PA-46 (Malibu) Series AeroplanesPiper PA-46 (Malibu) Series Aeroplanes
Start here
Get a plain-English read of Piper PA-46 (Malibu) Series Aeroplanes
Turn the raw legal text into a practical explanation grounded in AD/PA-46/1 - Aft Rudder Cable - Inspection - CANCELLED.
Piper PA-46 (Malibu) Series Aeroplanes
| AD/PA-46/1 | Aft Rudder Cable - Inspection | 3/2009 |
|---|
| Requirement: | CANCELLED. |
|---|---|
| This AD is cancelled on 12 March 2009. | |
| Background: | This unique Australian AD specified once-only inspection of the aft rudder cable in accordance with Piper SB No. 781 within 25 hours time in service, or the next maintenance release inspection, after September 1984. The AD is no longer required. |
Image unavailable in extracted text
David Punshon
Delegate of the Civil Aviation Safety Authority
28 January 2009