CTHRepealedLegislation
AD/PA-31/15 - Alternator Field Fuse - Installation - CANCELLED
Piper PA-31 Series AeroplanesPiper PA-31 Series Aeroplanes
Start here
Get a plain-English read of Piper PA-31 Series Aeroplanes
Turn the raw legal text into a practical explanation grounded in AD/PA-31/15 - Alternator Field Fuse - Installation - CANCELLED.
Piper PA-31 Series Aeroplanes
| AD/PA-31/15 | Alternator Field Fuse - Installation | 8/2008 |
|---|
| Requirement: | CANCELLED. |
|---|---|
| This AD is cancelled on 31 July 2008. | |
| Background: | This unique Australian AD required installation of a fuse in the alternator field circuit. The AD required compliance within 200 hours TIS after March 1971. This requirement was not based on a manufacturer’s service instruction. All affected aircraft have now been modified. |
Image unavailable in extracted text
James Coyne
Delegate of the Civil Aviation Safety Authority
12 June 2008