CTHRepealedLegislation
AD/PA-28/73 - Hose Assembly - Inspection and Modification - CANCELLED
Piper PA-28 Series AeroplanesPiper PA-28 Series Aeroplanes
Start here
Get a plain-English read of Piper PA-28 Series Aeroplanes
Turn the raw legal text into a practical explanation grounded in AD/PA-28/73 - Hose Assembly - Inspection and Modification - CANCELLED.
Piper PA-28 Series Aeroplanes
| AD/PA-28/73 | Hose Assembly - Inspection and Modification | 7/2008 |
|---|
| Requirement: | CANCELLED. |
|---|---|
| This AD is cancelled on 3 July 2008. | |
| Background: | This unique Australian AD required once-only inspection and replacement of hose assemblies in accordance with Piper SB No. 611. The AD required compliance within 10 hours time in service after December 1978. As all affected aircraft have now been inspected this AD is no longer required. |
Image unavailable in extracted text
James Coyne
Delegate of the Civil Aviation Safety Authority
22 May 2008