Piper PA-23 (Apache and Aztec) Series Aeroplanes
Piper PA-23 (Apache and Aztec) Series Aeroplanes
| AD/PA-23/86 | Ammeter Cable Clamp - Inspectionand Replacement | 2/2009 |
|---|
| Requirement: | CANCELLED. |
|---|---|
| This AD is cancelled on 12 February 2009. | |
| Background: | This unique Australian AD specified once-only inspection and replacement of the ammeter cable clamp. Compliance was required within 25 hours time in service after March 1993. The AD arose from the investigation of a fire in an Australian aircraft. The AD is no longer required. |
View image in the official source
James Coyne
Delegate of the Civil Aviation Safety Authority
23 December 2008